Data Centers in Torres
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Brazil
- São Paulo 69
- Rio de Janeiro 36
- Campinas 18
- Porto Alegre 14
- Fortaleza 11
- Salvador 10
- Curitiba 8
- Belo Horizonte 6
- Brasilia 5
- Joao Pessoa 5
- Recife 4
- São José do Rio Preto 4
- Maringá 4
- Aracaju 3
- Campina Grande 3
- Campo Grande 3
- Cascavel 2
- Goiânia 2
- Londrina 2
- São Luís 2
- Boa Vista 1
- Maceió 1
- Natal 1
- Santos 1
- Santa Maria 1
- Brusque 1
- Videira 1
- Cuiabá 1
- Florianópolis 1
- Piauí 1
- Chapecó 1
- Foz do Iguaçu 1
- Ribeirão Preto 1
- Eunápolis 1
- Vitória 1
- Linhares 1
- Sete Lagoas 1
- Palmas 1
- Joinville 1
- Vale do Aço 1
- Belém 1
- Teresina 1
- Cacoal 1
- Rio Grande do Sul Interior 1
- Santa Rosa 1
- Rio Claro 1
- Tucuruí 1
- Muriaé 1
Torres – Coastal Gateway for Southern Brazil
Torres serves as a strategic edge location for digital infrastructure targeting southern Brazil. It provides a crucial foothold for latency-sensitive applications requiring proximity to the growing economic hubs in the states of Rio Grande do Sul and Santa Catarina, ensuring reliable service delivery to this key agricultural and industrial region.
Torres: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Solid connectivity for a regional market, with good national links. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest on-ramps are in São Paulo; access via private network extension. |
| Power Cost | R$0.65-R$0.80/kWh | Based on national industrial averages, as of September 2025. |
| Disaster Risk | High (5.2/10) | Elevated risk profile primarily driven by flood and human-related factors. |
| Tax Incentives | Yes | DC-specific incentives include tariff exemptions on imported IT equipment. |
| Sales Tax | 18% (ICMS/PIS-COFINS/ISS) | Multiple state and federal taxes apply, as of September 2025. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: As a smaller edge market, Torres has access to a focused group of national and regional carriers, with estimates of over 10 providers available as of September 2025. Carrier-neutral facilities offer interconnection points to these networks.
Direct Cloud On-Ramps: There are no direct public cloud on-ramps within Torres. Businesses connect to the 0 cloud regions available in Brazil by utilizing private network extensions or dedicated circuits to major hubs like São Paulo.
Internet Exchange Points (IXPs): Public peering is limited in Torres. Most network interconnection occurs privately or through IXPs in major regional centers like Porto Alegre or the national hub in São Paulo to ensure efficient traffic exchange.
Bare Metal: Bare metal server availability is focused in larger Brazilian markets. Providers like Latitude.sh offer services from São Paulo that can serve the Torres region with acceptable latency for many applications.
Power Analysis
Average Cost Of Power: Industrial electricity costs are estimated to range from R$0.65 to R$0.80 per kWh, as of September 2025. This pricing reflects Brazil's national energy landscape and makes operational cost planning crucial for deployments.
Power Grid Reliability: Brazil's national grid is predominantly supplied by hydroelectric power (~60%), supplemented by other renewables and fossil fuels. In key commercial areas, the power infrastructure is generally reliable, but backup generation remains a standard requirement for all data center operations.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers in or near Torres are positioned to serve the coastal tourism industry, local commerce, and the broader agricultural and manufacturing centers of southern Rio Grande do Sul and southeastern Santa Catarina.
Regional Market Reach: Torres provides a strategic point of presence for reaching a substantial population across two states. It is a valuable location for content delivery, cloud gaming, and IoT applications that require lower latency than can be achieved from São Paulo.
Tax Advantage For Data Centers: Brazil offers significant tax incentives for data center investment. These advantages include tax breaks and exemptions on certain IT-related capital expenditures and tariff exemptions for imported data center equipment.
Natural Disaster Risk
Torres has a High risk profile, with an INFORM Risk score of 5.2 out of 10 as of September 2025. The risk assessment highlights specific vulnerabilities that require careful planning for infrastructure resilience.
Key natural hazards include:
- River Flood: Score of 7.7
- Coastal Flood: Score of 5.0
- Drought: Score of 4.5
- Earthquake: Score of 0.5
While tsunami and tropical cyclone risks are negligible, the high scores for river and coastal flooding demand that facility site selection and construction standards mitigate these specific threats.