Muriaé, Brazil – Regional Colocation for Southeast Brazil

Muriaé provides a strategic data center location for organizations targeting the economically significant state of Minas Gerais and surrounding regions. This market offers a viable alternative to the primary hubs of São Paulo and Rio de Janeiro, enabling lower latency for regional users and providing geographic diversity for disaster recovery plans. It is best suited for content delivery, logistics, and commercial enterprises focused on this specific corridor.

Muriaé, Brazil: At A Glance

FactorRating / DataNotes
Global Connectivity GradeBStrong national and regional connectivity, ideal for in-country workloads.
Direct Cloud On-Ramps0 – as of September 2025Access requires network extension to primary hubs like São Paulo.
Power CostR$0.60 – R$0.75/kWhBased on national industrial averages, as of September 2025.
Disaster RiskHigh (5.2/10)Primarily driven by significant river flood and drought risk.
Tax IncentivesYesIncludes DC-specific exemptions for imported IT equipment and capital expenditures.
Sales Tax18% (Multiple)Includes ICMS, PIS-COFINS, and ISS, as of September 2025.

Network & Connectivity Ecosystem

Carrier Density & Carrier Neutrality: Muriaé provides access to key national and regional carriers, ensuring reliable connectivity within Brazil. While not as dense as São Paulo, the market has sufficient options for building redundant network architectures in carrier-neutral facilities, as of September 2025.

Direct Cloud On-Ramps: There are no direct public cloud on-ramps within Muriaé, as of September 2025. Businesses require private network connections (PNI or wave) to access cloud provider fabrics in major hubs like São Paulo, where all major clouds maintain a presence.

Internet Exchange Points (IXPs): Public peering is not a feature of this market. Most traffic exchange is handled via private peering or is backhauled to the national peering hub, IX.br in São Paulo, for interconnection with other networks.

Bare Metal: Bare metal server options are available, typically provisioned from providers located in Brazil's larger data center markets. Services from providers like Latitude.sh can serve the entire country with low latency, offering a viable solution for deployments requiring dedicated hardware.

Power Analysis

Average Cost Of Power: The average cost for industrial power in the region is estimated between R$0.60 – R$0.75/kWh, as of September 2025. Brazil's grid benefits from a high concentration of renewable energy, with over 80% generated from hydroelectric and other green sources, which can contribute to long-term price stability.

Power Grid Reliability: The national power grid is generally reliable, especially in established commercial areas. Data centers in this region are built to modern standards, incorporating redundant power feeds from the utility grid, on-site substations, and comprehensive UPS and diesel generator backup systems to ensure continuous uptime.

Market Access, Business & Tax Climate

Proximity To Key Business Districts: Data centers in or near Muriaé are positioned to serve the Zona da Mata region of Minas Gerais. This area is a center for agriculture, manufacturing, and regional logistics, making it an effective location for compute infrastructure supporting these industries.

Regional Market Reach: The market provides low-latency access to the population centers of Minas Gerais and can effectively serve adjacent markets in the states of Rio de Janeiro and Espírito Santo. This makes it a strategic point for distributing content and services away from the more congested coastal hubs.

Tax Advantage For Data Centers: Brazil offers significant tax incentives that reduce the cost of data center investment. These programs provide exemptions and breaks on tariffs for imported IT and infrastructure equipment, directly lowering the capital expenditure needed for hardware deployments and facility build-outs.

Natural Disaster Risk

Brazil has a high overall disaster risk rating of 5.2 out of 10, as of September 2025. The risk profile for Muriaé is driven almost entirely by weather-related and environmental factors rather than seismic or cyclonic events.

Key natural hazards include:

  • River Flood: The most significant risk in the region, with a score of 7.7/10.
  • Drought: A notable concern, with a score of 4.5/10.
  • Epidemic: Rated at 6.4/10, reflecting a broader national vulnerability.

Risks from earthquake, tsunami, and tropical cyclones are negligible for this inland location.

WHY CHOOSE US?Helping You Find Connectivity Solutions For Your Business
Inflect logo
Expert SupportGet help from industry pros. Free of charge
Best DealsAccess exclusive deals from top providers.
Seamless ExperienceResearch, compare and purchase, all in one place.
Fast ResponsesGet your questions answered within 24 hours.
Our Partners
EquinixZayoDigital RealtyAT&T BusinessLumenArelion