Data Centers in Santa Rosa
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Brazil
- São Paulo 69
- Rio de Janeiro 37
- Campinas 16
- Porto Alegre 14
- Fortaleza 11
- Salvador 9
- Curitiba 7
- Belo Horizonte 5
- Brasilia 5
- Joao Pessoa 5
- Maringá 4
- Recife 4
- São José do Rio Preto 4
- Aracaju 3
- Campina Grande 3
- Campo Grande 3
- Cascavel 2
- Goiânia 2
- Londrina 2
- São Luís 2
- Belém 1
- Boa Vista 1
- Brusque 1
- Cacoal 1
- Chapecó 1
- Cuiabá 1
- Eunápolis 1
- Florianópolis 1
- Foz do Iguaçu 1
- Joinville 1
- Linhares 1
- Maceió 1
- Muriaé 1
- Natal 1
- Palmas 1
- Piauí 1
- Praia Grande 1
- Ribeirão Preto 1
- Rio Claro 1
- Rio Grande do Sul Interior 1
- Santa Maria 1
- Santos 1
- Sete Lagoas 1
- Teresina 1
- Torres 1
- Tucuruí 1
- Vale do Aço 1
- Videira 1
- Vitória 1
Santa Rosa – Strategic Edge for Southern Brazil Interconnection
Executive Summary
This market serves enterprises requiring localized processing and low-latency connectivity near the Argentine border. It provides a vital footprint for regional service providers and industrial sectors to secure a digital edge while avoiding the congestion of larger national hubs. Utilizing this location ensures resilient operations for businesses that cannot afford the backhaul delays of primary metropolitan centers.
Santa Rosa: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Stable regional pathing for Southern Brazil. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest major on-ramps located in Sao Paulo. |
| Power Cost | R$ 0.72/kWh – as of September 2025 | Industrial rates estimated for Rio Grande do Sul. |
| Disaster Risk | High (5.2/10) – as of September 2025 | Driven primarily by river flood concerns. |
| Tax Incentives | Yes – as of September 2025 | Exemptions for imported IT hardware. |
| Sales Tax | 18.00% VAT – as of September 2025 | Combined ICMS, PIS-COFINS, and ISS rates. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 5 as of September 2025. The local landscape consists of a focused group of regional fiber providers and national incumbents. This ecosystem supports resilient handoffs for businesses operating in the agricultural and manufacturing sectors.
Direct Cloud On-Ramps: 0 direct on-ramps as of September 2025. There are no native on-ramps from AWS, Google Cloud (GCP), or Microsoft Azure in the immediate metro. Connectivity to these services is managed through private transport or wave services to the primary cloud hub in Sao Paulo.
Internet Exchange Points (IXPs): Peering is largely handled through regional nodes or by backhauling traffic to the IX.br points in Porto Alegre to ensure efficient traffic routing as of September 2025.
Bare Metal: Localized high-performance compute is available through regional providers such as Latitude.sh. They provide dedicated hardware for latency-sensitive applications as of September 2025.
Power Analysis
Average Cost Of Power: Industrial electricity is estimated at R$ 0.72/kWh as of September 2025. The energy matrix is highly sustainable, with roughly 60% hydro and 22% other renewables, providing a greener profile for corporate ESG targets. This pricing remains competitive with other secondary markets in the Southern Cone.
Power Grid Reliability: The local grid is well-engineered and benefits from the massive hydroelectric output of the region. Data center corridors are supported by redundant configurations to maintain uptime during seasonal demand peaks as of September 2025.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Facilities are located to serve the industrial and agricultural machinery sectors in Santa Rosa. This proximity is vital for IoT deployments and automated manufacturing processes that require low-latency response times.
Regional Market Reach: Santa Rosa acts as a gateway to northwestern Rio Grande do Sul and serves as a strategic point for traffic moving between Brazil and Northern Argentina as of September 2025.
Tax Advantage For Data Centers: Federal and state programs offer significant relief through tariff exemptions on specialized IT equipment. This financial benefit directly reduces the capital requirements for deploying high-density server environments as of September 2025.
Natural Disaster Risk
The overall risk profile is High (5.2/10) as of September 2025. Management of physical infrastructure must account for specific environmental variables characteristic of the region.
- River Flood: 7.7/10. This is the primary natural concern for local site selection.
- Epidemic: 6.4/10. Reflects regional health exposure ratings.
- Coastal Flood: 5.0/10. This is an indirect national risk as the metro is located inland.
- Drought: 4.5/10. Potential impact on the hydroelectric-dependent power supply.
- Earthquake: 0.5/10. Seismic activity is historically negligible.