Data Centers in Leipzig
5 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Germany
- Frankfurt 122
- Berlin 39
- Hamburg 39
- Munich 35
- Dusseldorf 33
- Stuttgart 21
- Nuremberg 20
- Bremen 19
- Cologne 11
- Karlsruhe 11
- Hanover 9
- Ruhr Area 8
- Dortmund 6
- Bielefeld 6
- Dresden 5
- Kiel 4
- Gütersloh 4
- Heilbronn 4
- Reutlingen 3
- Bonn 3
- Münster 3
- Erfurt 3
- Mannheim 3
- Ingolstadt 2
- Rostock 2
- Magdeburg 2
- Würzburg 2
- Strasbourg 2
- Augsburg 2
- Hof 2
- Ludwigshafen 2
- Bamberg 2
- Coburg 2
- Jena 2
- Marburg 1
- Baden-Baden 1
- Deggendorf 1
- Tübingen 1
- Zwickau 1
- Freiburg 1
- Lübeck 1
- Saarbrücken 1
- Aachen 1
- Fulda 1
- Schwerin 1
- Kirchheim 1
- Schweinfurt 1
- Regensburg 1
- Wuppertal 1
- Konstanz 1
- Ulm 1
- Langen 1
- Paderborn 1
- Wolfsburg 1
Leipzig – Efficient Gateway to Central Germany
Executive Summary
Leipzig is an emerging data center market ideal for organizations requiring a resilient, low-risk location to serve Central and Eastern Germany. Its strategic position as a logistics hub, combined with stable power and a low natural disaster profile, offers a cost-effective alternative to the primary Frankfurt market. This makes Leipzig a strong choice for disaster recovery, secondary deployments, and latency-sensitive applications targeting the region.
Leipzig: At A Glance
Factor | Rating / Data | Notes |
---|---|---|
Global Connectivity Grade | B | Strong national fiber, but not a primary international network peering point. |
Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest hub is Frankfurt. Private network extensions provide reliable cloud access. |
Power Cost | €0.15/kWh – as of September 2025 | Competitively priced for Germany, supporting predictable operational expenses. |
Disaster Risk | Low (2.6) – as of September 2025 | Very low exposure to significant natural hazards, ensuring high uptime. |
Tax Incentives | Yes | Germany offers support for renewable energy, replacing a previous solar subsidy. |
Sales Tax | 19% VAT – as of September 2025 | Standard national Value Added Tax rate applies to services. |
Network & Connectivity Ecosystem
Leipzig provides reliable connectivity focused on serving the German domestic market. While not a global hub like Frankfurt, its infrastructure is more than sufficient for regional enterprise and content delivery workloads. There are 5 data centers operated by 2 providers, as of September 2025.
Carrier Density & Carrier Neutrality The market offers a focused selection of national and regional carriers. Carrier-neutral facilities provide the necessary interconnection options for building resilient network architectures, though the total number of carriers is smaller than in primary German markets.
Direct Cloud On-Ramps There are no direct cloud on-ramps within Leipzig, as of September 2025. Businesses connect to the major cloud providers, including AWS, Google Cloud, and Microsoft Azure, via private network extensions to Frankfurt, the primary interconnection and cloud region hub for Germany.
Internet Exchange Points (IXPs) Public peering is limited within the city. Most network peering is handled privately or routed through the DE-CIX in Frankfurt, the world's largest internet exchange by traffic volume, ensuring efficient data transit.
Bare Metal Bare metal server options are available, providing dedicated, high-performance computing capacity. Providers like IONOS offer solutions suitable for workloads that require direct hardware access without a virtualization layer.
Power Analysis
Germany's power infrastructure is highly reliable, and Leipzig benefits from this stability, making it a secure location for critical IT operations.
Average Cost Of Power Industrial power costs average €0.15/kWh, as of September 2025. This price point, while higher than in some other European countries, offers predictability for financial planning and budgeting of data center operations. The national energy mix includes approximately 55% renewables.
Power Grid Reliability The German power grid is well-engineered and exceptionally stable. Data centers in the Leipzig area are typically supported by redundant power feeds from multiple substations, providing a sturdy foundation for mission-critical services that demand constant uptime.
Market Access, Business & Tax Climate
Leipzig's strategic location and business-friendly environment make it an attractive secondary market for data center investment.
Proximity To Key Business Districts Data centers in Leipzig are situated to serve the city's significant logistics, automotive (Porsche, BMW), and e-commerce industries. This proximity enables low-latency connectivity for local manufacturing, research, and digital business operations.
Regional Market Reach From Leipzig, organizations can effectively serve a large population across Central and Eastern Germany, including major cities like Dresden and Halle. Its location is optimal for disaster recovery sites for businesses with a primary footprint in Frankfurt or Berlin.
Tax Advantage For Data Centers Germany provides tax incentives aimed at encouraging green energy adoption. The government actively supports investments in renewable energy, which can help data center operators lower their long-term power costs and meet corporate sustainability goals.
Natural Disaster Risk
Leipzig's overall natural disaster risk is low, with an INFORM Risk score of 2.6, as of September 2025. The city is located in a seismically stable region with minimal exposure to significant environmental threats, making it an excellent location for risk-averse operations.
The primary natural hazards to consider, though still rated as low risk, are:
- River Flood: The region has some exposure to river flooding, but modern infrastructure and data center site selection mitigate this risk.
- Earthquake: Seismic risk is minimal and not a significant operational concern.
- Drought: Occasional drought conditions can occur but have no direct impact on data center infrastructure.