Data Centers in Augsburg
2 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Germany
- Frankfurt 122
- Berlin 39
- Hamburg 39
- Munich 36
- Dusseldorf 33
- Stuttgart 21
- Nuremberg 20
- Bremen 19
- Cologne 11
- Karlsruhe 11
- Hanover 9
- Ruhr Area 8
- Bielefeld 6
- Dortmund 6
- Dresden 5
- Leipzig 5
- Gütersloh 4
- Heilbronn 4
- Kiel 4
- Bonn 3
- Erfurt 3
- Mannheim 3
- Münster 3
- Reutlingen 3
- Bamberg 2
- Coburg 2
- Hof 2
- Ingolstadt 2
- Jena 2
- Ludwigshafen 2
- Magdeburg 2
- Rostock 2
- Strasbourg 2
- Würzburg 2
- Aachen 1
- Deggendorf 1
- Freiburg 1
- Fulda 1
- Kirchheim 1
- Konstanz 1
- Langen 1
- Lübeck 1
- Marburg 1
- Paderborn 1
- Regensburg 1
- Saarbrücken 1
- Schweinfurt 1
- Schwerin 1
- Tübingen 1
- Ulm 1
- Wolfsburg 1
- Wuppertal 1
- Zwickau 1
Augsburg – Strategic Failover Hub for Southern Germany
Executive Summary
Augsburg serves as a critical high-availability zone for enterprises requiring proximity to Munich without the high-density overhead. It is a prime choice for manufacturing and aerospace firms requiring reliable disaster recovery and data sovereignty within the Bavarian economic region.
Augsburg: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable routing to Munich and major European backbones. |
| Direct Cloud On-Ramps | 0 – as of January 2026 | Nearest on-ramps are in Munich via private extensions. |
| Power Cost | €0.15/kWh – as of January 2026 | Competitive industrial rates with a strong renewable mix. |
| Disaster Risk | Low (2.6/10) – as of January 2026 | Geographically sheltered with minimal natural hazard exposure. |
| Tax Incentives | Yes | General support available for renewable energy infrastructure. |
| Sales Tax | 19% VAT – as of January 2026 | Standard German value-added tax for services. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 5 as of January 2026. Local facilities host a mix of regional fiber specialists and national German providers. This diversity supports resilient routing for industrial and corporate workloads requiring high uptime.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions as of January 2026. While no public cloud nodes reside locally, high-speed private extensions connect to AWS and Google Cloud (GCP) hubs in Munich. This setup allows for secure, low-latency access to major cloud resources.
Internet Exchange Points (IXPs): There are no major local IXPs; peering is primarily handled through the DE-CIX Munich node as of January 2026. This architecture ensures efficient traffic flow for the Swabia region while utilizing the national peering infrastructure.
Bare Metal: Resilient bare metal services are available through national leaders like IONOS or Leaseweb as of January 2026. These options provide the dedicated performance required for local industrial automation and data-heavy applications.
Power Analysis
Average Cost Of Power: Industrial electricity is priced at €0.15/kWh as of January 2026. This rate provides a stable cost base for power-intensive operations while leveraging a grid with a 55% renewable energy mix. The cost structure remains attractive compared to the central Munich metropolitan area.
Power Grid Reliability: The local grid is well-engineered with multi-substation support to meet the heavy demands of the city manufacturing sector. Distribution follows strict German utility standards for uptime and industrial stability.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers are positioned near major industrial zones and tech parks, serving the manufacturing and electronics sectors as of January 2026. Proximity to these hubs is essential for low-latency industrial automation and edge computing.
Regional Market Reach: This location serves the Swabia region and the Greater Munich area, acting as a logical secondary site for the Bavarian economy. It reaches a population of several million with sub-millisecond latency.
Tax Advantage For Data Centers: Financial benefits are primarily found through general renewable energy support programs that assist in managing long-term energy costs. These incentives help offset infrastructure costs for companies prioritizing sustainable operations.
Natural Disaster Risk
Augsburg maintains a Low risk profile with an INFORM score of 2.6/10 as of January 2026. It is a stable environment suitable for long-term data storage and secondary site operations.
- River Flood: 7.8 (Moderate). Sites near the Lech and Wertach rivers require specific flood mitigation strategies as of January 2026.
- Earthquake: 3.7 (Low). Seismic activity is historically minimal and well within standard structural tolerances.
- Epidemic: 2.1 (Low). Public health infrastructure is highly capable of managing widespread health events.
- Drought: 1.3 (Low). Water scarcity does not pose a threat to data center cooling operations.
- Coastal Flood: 8.0 (Indirect). This is a national regional factor that does not impact the inland Augsburg metro area as of January 2026.