Data Centers in Rostock
2 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Germany
- Frankfurt 122
- Berlin 39
- Hamburg 39
- Munich 36
- Dusseldorf 33
- Stuttgart 21
- Nuremberg 20
- Bremen 19
- Cologne 11
- Karlsruhe 11
- Hanover 9
- Ruhr Area 8
- Bielefeld 6
- Dortmund 6
- Dresden 5
- Leipzig 5
- Gütersloh 4
- Heilbronn 4
- Kiel 4
- Bonn 3
- Erfurt 3
- Mannheim 3
- Münster 3
- Reutlingen 3
- Augsburg 2
- Bamberg 2
- Coburg 2
- Hof 2
- Ingolstadt 2
- Jena 2
- Ludwigshafen 2
- Magdeburg 2
- Strasbourg 2
- Würzburg 2
- Aachen 1
- Deggendorf 1
- Freiburg 1
- Fulda 1
- Kirchheim 1
- Konstanz 1
- Langen 1
- Lübeck 1
- Marburg 1
- Paderborn 1
- Regensburg 1
- Saarbrücken 1
- Schweinfurt 1
- Schwerin 1
- Tübingen 1
- Ulm 1
- Wolfsburg 1
- Wuppertal 1
- Zwickau 1
Rostock – Strategic Gateway for Baltic Edge Connectivity
Rostock serves as a specialized edge destination for businesses requiring low-latency access to Baltic shipping lanes and Northern European maritime operations. It provides a vital link for data sovereignty and proximity to Scandinavian subsea fiber landing points, ensuring speed for automated logistics and port technologies.
Rostock: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable performance for specialized regional edge requirements. |
| Direct Cloud On-Ramps | 0 – as of January 2026 | Nearest major hubs are Berlin and Hamburg. |
| Power Cost | €0.15/kWh, as of September 2025 | Standard industrial rates for the German market. |
| Disaster Risk | Low (2.6/10), as of September 2025 | Minimal environmental risk for mission-critical operations. |
| Tax Incentives | Yes | Financial support available for renewable energy infrastructure. |
| Sales Tax | 19% VAT, as of January 2026 | Standard German value-added tax rate applies. |
Network & Connectivity Ecosystem
Rostock functions as a specialized connectivity node, balancing local industrial needs with international transit.
Carrier Density & Carrier Neutrality: Carrier count: over 3. As of January 2026, the market supports a focused ecosystem of ~3–5 carriers. While smaller than major hubs, this density provides sufficient diversity for resilient regional networking.
Direct Cloud On-Ramps: 0, enabling access to 0 cloud regions. As of January 2026, there are no native on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure within the city. Enterprises typically use private transport or wavelength services to reach major cloud clusters in Berlin or Hamburg.
Internet Exchange Points (IXPs): Public exchange presence is limited locally, meaning most peering occurs via private interconnects or backhaul to national hubs like BCIX in Berlin. This setup ensures that local traffic stays efficient while maintaining high-speed links to the broader internet.
Bare Metal: Local compute requirements are serviced by specialized providers such as IONOS and Leaseweb. These options allow for high-performance, dedicated hardware deployments without the management overhead of a full facility.
Power Analysis
Average Cost Of Power: Industrial electricity is priced at €0.15/kWh as of September 2025. The energy mix is heavily influenced by the German energy transition, with renewables accounting for approximately 55% of the supply and fossil fuels making up the remaining 45%. This stable pricing allows for predictable operational forecasting.
Power Grid Reliability: The local grid is well-engineered and benefits from the high standards of the German national infrastructure. Facilities in this corridor typically utilize redundant feeds and multi-substation support to ensure consistent uptime for hardware.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers are positioned to serve the Port of Rostock and the surrounding logistics and maritime technology sectors. This proximity is vital for automated port operations and real-time supply chain management.
Regional Market Reach: This location effectively serves the Mecklenburg-Vorpommern region and acts as a bridge for data flowing between Northern Europe and the Baltic States.
Tax Advantage For Data Centers: Germany provides financial benefits for enterprises investing in green infrastructure. These incentives focus on adopting renewable energy systems to lower the long-term carbon footprint of industrial operations.
Natural Disaster Risk
The environmental risk profile for Rostock is Low, with a score of 2.6/10 as of September 2025. The region is stable, though its coastal position requires specific attention to water-related factors.
- Coastal Flood: 8.0 (Moderate). As a port city, local facilities implement specific elevation and flood-prevention measures.
- River Flood: 7.8 (Moderate). Risks are localized and managed through city-wide drainage and civil engineering.
- Earthquake: 3.7 (Low). Seismic activity is historically negligible and does not threaten modern construction.
- Drought: 1.3 (Low). Water scarcity does not currently impact cooling operations or utility reliability.
Other natural hazards are considered minor or are not listed for this region. All risk assessments are current as of September 2025.