Data Centers in Hof
2 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Germany
- Frankfurt 120
- Hamburg 40
- Berlin 39
- Munich 35
- Dusseldorf 32
- Nuremberg 20
- Stuttgart 19
- Bremen 19
- Karlsruhe 11
- Cologne 11
- Hanover 9
- Ruhr Area 8
- Dortmund 7
- Bielefeld 6
- Dresden 5
- Leipzig 5
- Kiel 4
- Gütersloh 4
- Heilbronn 4
- Reutlingen 3
- Münster 3
- Mannheim 3
- Erfurt 3
- Bonn 3
- Bamberg 2
- Ingolstadt 2
- Rostock 2
- Würzburg 2
- Magdeburg 2
- Jena 2
- Strasbourg 2
- Augsburg 2
- Ludwigshafen 2
- Coburg 2
- Marburg 1
- Baden-Baden 1
- Deggendorf 1
- Tübingen 1
- Zwickau 1
- Freiburg 1
- Lübeck 1
- Saarbrücken 1
- Aachen 1
- Fulda 1
- Schwerin 1
- Kirchheim 1
- Schweinfurt 1
- Regensburg 1
- Wuppertal 1
- Konstanz 1
- Ulm 1
- Langen 1
- Paderborn 1
- Frankfurt am Main 1
- Hilden 1
- Wolfsburg 1
Hof, Germany – Stable Colocation for Regional Access
Hof provides a stable, low-risk environment for colocation, ideal for businesses targeting the Bavarian, Saxon, and Thuringian regions of Germany. Its primary advantages are cost-effective power and operational security, making it a strong choice for disaster recovery sites or for serving regional application users. For companies that do not require direct, low-latency cloud connections, Hof offers a reliable and economical infrastructure footprint.
Hof, Germany: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable connectivity, though lacking the density of Germany's primary hubs. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Access requires network extension to major hubs like Frankfurt or Munich. |
| Power Cost | €0.15/kWh – as of September 2025 | Industrial pricing is competitive for the region, supporting cost-effective operations. |
| Disaster Risk | Low (2.6/10) – as of September 2025 | Very low exposure to significant natural disasters, enhancing uptime potential. |
| Tax Incentives | Yes | Incentives focus on renewable energy support, aiding green power initiatives. |
| Sales Tax | 19% VAT – as of September 2025 | The standard German Value Added Tax rate applies to services. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: The Hof market includes 2 colocation facilities as of September 2025, offering access to a focused group of national and regional carriers. The environment supports carrier-neutral interconnection, providing flexibility for building resilient network solutions.
Direct Cloud On-Ramps: There are no direct cloud on-ramps within Hof as of September 2025. Businesses requiring dedicated connections to hyperscalers like AWS, Google Cloud, or Microsoft Azure must utilize private network extensions or IP transit to major interconnection hubs such as Frankfurt.
Internet Exchange Points (IXPs): Public peering is not available directly within Hof. Most network operators establish peering arrangements privately or connect to Germany's primary internet exchange, DE-CIX in Frankfurt, to optimize traffic routes.
Bare Metal: Bare metal server options are available, primarily through providers with a strong German or European presence. Companies like IONOS offer dedicated server solutions that can be deployed in regional data centers.
Power Analysis
Average Cost Of Power: The average industrial power cost in the Hof area is approximately €0.15/kWh as of September 2025. This competitive rate helps manage operational expenditures for power-intensive deployments. The German grid mix is increasingly green, with about 55% of energy derived from renewables.
Power Grid Reliability: Germany's power infrastructure is exceptionally reliable and well-engineered. Data centers in the region are typically supported by redundant grid connections and multiple substations, ensuring high levels of uptime for critical operations.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers in Hof are positioned to serve the tri-state area of Bavaria, Saxony, and Thuringia. This location is advantageous for logistics, manufacturing, and regional enterprises that need infrastructure close to their operations and end-users.
Regional Market Reach: From Hof, digital services can effectively reach across southern and eastern Germany and extend into the western Czech Republic. The market is a practical hub for delivering content and applications to this specific geographic corridor.
Tax Advantage For Data Centers: Germany offers tax incentives aimed at promoting the use of renewable energy. These programs can reduce the overall cost of operations for data center owners and tenants who invest in sustainable power sources.
Natural Disaster Risk
Hof has a very low natural disaster risk profile, with an INFORM Risk score of 2.6 out of 10 as of September 2025. This score indicates a highly stable physical environment, minimizing the threat of weather-related or geological disruptions to data center operations.
The primary natural hazards to consider are:
- River Flood: The most significant regional risk, though modern data centers are built above flood plains.
- Coastal Flood: This risk is rated high for Germany nationally but is not a direct threat to the inland location of Hof.
- Earthquake: A minor risk with very low historical frequency or intensity in the region.
- Drought: A minimal risk that has little direct impact on data center infrastructure.