Data Centers in Kirchheim
0 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Germany
- Frankfurt 122
- Berlin 39
- Hamburg 39
- Munich 36
- Dusseldorf 33
- Stuttgart 21
- Nuremberg 20
- Bremen 19
- Cologne 11
- Karlsruhe 11
- Hanover 9
- Ruhr Area 8
- Bielefeld 6
- Dortmund 6
- Dresden 5
- Leipzig 5
- Gütersloh 4
- Heilbronn 4
- Kiel 4
- Bonn 3
- Erfurt 3
- Mannheim 3
- Münster 3
- Reutlingen 3
- Augsburg 2
- Bamberg 2
- Coburg 2
- Hof 2
- Ingolstadt 2
- Jena 2
- Ludwigshafen 2
- Magdeburg 2
- Rostock 2
- Strasbourg 2
- Würzburg 2
- Aachen 1
- Deggendorf 1
- Freiburg 1
- Fulda 1
- Konstanz 1
- Langen 1
- Lübeck 1
- Marburg 1
- Paderborn 1
- Regensburg 1
- Saarbrücken 1
- Schweinfurt 1
- Schwerin 1
- Tübingen 1
- Ulm 1
- Wolfsburg 1
- Wuppertal 1
- Zwickau 1
Kirchheim – High Performance Edge Access for Southern Germany
Executive Summary
Kirchheim serves as a critical edge node for enterprises requiring low-latency connectivity to Munich’s industrial and technology core. This location provides a resilient alternative to larger hubs, offering the stability and sustainable energy profile necessary for high-stakes automotive and aerospace workloads.
Kirchheim: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional performance and stability. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest major hub is Munich. |
| Power Cost | €0.15/kWh – as of September 2025 | Industrial rate including taxes. |
| Disaster Risk | Low (2.6) – as of September 2025 | Minimal risk profile for infrastructure. |
| Tax Incentives | Yes | Renewable energy support available. |
| Sales Tax | 19% VAT – as of September 2025 | Standard German federal rate. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 5 providers as of September 2025. The local market offers a balanced mix of national and regional providers, ensuring competitive transit options for enterprise workloads.
Direct Cloud On-Ramps: 0 cloud on-ramps are present locally as of September 2025. Enterprises typically extend their reach to major platforms like AWS, Google Cloud (GCP), or Microsoft Azure via private lines to Munich, which is less than 20 kilometers away.
Internet Exchange Points (IXPs): Most local peering is handled through the nearest national hubs in Munich or via DE-CIX Frankfurt. This configuration ensures efficient routing for both domestic and international traffic.
Bare Metal: Resilient bare metal services are available through providers such as Latitude.sh and phoenixNAP. These options allow for rapid deployment of dedicated hardware without the overhead of traditional colocation.
Power Analysis
Average Cost Of Power: Industrial electricity is priced at €0.15/kWh as of September 2025. The local energy mix is highly sustainable, with approximately 55% coming from renewables and 0% from nuclear power. This pricing reflects the broader German market and supports carbon-conscious operations.
Power Grid Reliability: The grid is well-engineered with redundant multi-substation support. Reliability is high, matching the standards of Germany’s primary industrial corridors and providing a stable foundation for high-density computing.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Facilities are located near the Munich industrial belt. This placement provides direct access to aerospace, automotive, and media headquarters that require immediate data processing near the point of use.
Regional Market Reach: Kirchheim effectively serves the broader Southern Germany and DACH geography. The high population density in this region allows for efficient service delivery to millions of end users.
Tax Advantage For Data Centers: Local incentives focus on renewable energy adoption and replacing lost solar subsidies. This financial support helps operators manage energy costs while transitioning to sustainable power sources.
Natural Disaster Risk
The overall risk for Kirchheim is Low (2.6) as of September 2025. The region is geologically stable and well-protected from most major hazards.
The highest-scoring natural hazards include:
- River Flood (7.8): The primary regional concern, managed through local infrastructure.
- Earthquake (3.7): A minor risk with historical seismic activity remaining low.
- Epidemic (2.1): In line with national European averages.
- Drought (1.3): Low impact on infrastructure operations.
Coastal risks such as Tsunami and Coastal Flood are not material for this inland location. Other natural hazards are considered minor.