Data Centers in Schweinfurt
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Germany
- Frankfurt 122
- Berlin 39
- Hamburg 39
- Munich 36
- Dusseldorf 33
- Stuttgart 21
- Nuremberg 20
- Bremen 19
- Cologne 11
- Karlsruhe 11
- Hanover 9
- Ruhr Area 8
- Bielefeld 6
- Dortmund 6
- Dresden 5
- Leipzig 5
- Gütersloh 4
- Heilbronn 4
- Kiel 4
- Bonn 3
- Erfurt 3
- Mannheim 3
- Münster 3
- Reutlingen 3
- Augsburg 2
- Bamberg 2
- Coburg 2
- Hof 2
- Ingolstadt 2
- Jena 2
- Ludwigshafen 2
- Magdeburg 2
- Rostock 2
- Strasbourg 2
- Würzburg 2
- Aachen 1
- Deggendorf 1
- Freiburg 1
- Fulda 1
- Kirchheim 1
- Konstanz 1
- Langen 1
- Lübeck 1
- Marburg 1
- Paderborn 1
- Regensburg 1
- Saarbrücken 1
- Schwerin 1
- Tübingen 1
- Ulm 1
- Wolfsburg 1
- Wuppertal 1
- Zwickau 1
Schweinfurt – Precision Connectivity for the Industrial Edge
Executive Summary
Schweinfurt serves enterprises requiring low-latency access to Germany’s high-tech manufacturing and automotive supply chains. It provides a stable environment for regional edge deployments where physical proximity to industrial hubs is vital for operational uptime. For companies managing real-time production data, this location offers a strategic advantage in one of Europe’s most productive industrial corridors.
Schweinfurt: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional access via national backbones. |
| Direct Cloud On-Ramps | 0 — as of December 2025 | Frankfurt is the nearest major cloud hub. |
| Power Cost | €0.15/kWh — as of December 2025 | Competitive industrial rates with 55% renewable mix. |
| Disaster Risk | Low (2.6/10) — as of December 2025 | Geographically stable with few natural threats. |
| Tax Incentives | Yes — as of December 2025 | Support for renewable energy transitions. |
| Sales Tax | 19% VAT — as of December 2025 | Standard German value-added tax. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: 5–10 carriers. The market is served by a mix of regional and national fiber providers, offering resilient local loops for industrial automation and enterprise branch offices as of December 2025.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions as of December 2025. While local on-ramps are not present, the city maintains high-speed transport to Frankfurt, the primary gateway for AWS, Google Cloud (GCP), and Microsoft Azure. Private extension options via dedicated fiber provide reliable throughput to these global platforms.
Internet Exchange Points (IXPs): Most public peering occurs at DE-CIX Frankfurt to maximize reach and minimize hop counts as of December 2025. Local traffic often relies on direct private peering between regional providers to maintain low latency for local users.
Bare Metal: Dedicated hardware is available through providers such as IONOS or OVHcloud as of December 2025. These options support local workloads that require high performance without the overhead of virtualization.
Power Analysis
Average Cost Of Power: Industrial electricity is priced at €0.15/kWh, as of December 2025. This rate includes taxes and reflects a power mix where renewables account for approximately 55% of the total. This pricing structure offers stability for long-term operational planning in a region focused on sustainable energy.
Power Grid Reliability: The local infrastructure is well-engineered with redundant distribution systems common in German industrial zones as of December 2025. Multi-substation support ensures that data center operations remain steady even during maintenance cycles in heavy manufacturing districts.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers in this area are centrally located near major automotive and bearing manufacturing facilities. This proximity is vital for industrial IoT applications and real-time logistics management where latency directly affects production efficiency.
Regional Market Reach: Schweinfurt serves as a primary digital hub for the Lower Franconia region as of December 2025. It provides an effective bridge between the larger metropolitan hubs of Frankfurt and Nuremberg, covering a significant industrial population.
Tax Advantage For Data Centers: Germany provides financial support for enterprises moving toward renewable energy systems. This support lowers the long-term cost of sustainable infrastructure upgrades for high-capacity users as of December 2025.
Natural Disaster Risk
Schweinfurt maintains a Low (2.6/10) risk profile as of December 2025. The region is geographically stable, making it a reliable choice for secondary site recovery or primary regional hosting.
- River Flood: 7.8 (Moderate). This is the primary concern for the region, though modern facilities are generally built outside immediate flood zones.
- Earthquake: 3.7 (Low). Seismic activity is infrequent and typically low magnitude.
- Epidemic: 2.1 (Low). Public health infrastructure remains strong and capable of managing local outbreaks.
- Drought: 1.3 (Low). Minimal impact on standard data center operations.
Other natural hazards are considered minor for this inland location as of December 2025.