Data Centers in Måløy
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Norway
Måløy – Secure Subterranean Hosting for High-Density Compute
Executive Summary
This market is for enterprises requiring maximum physical security and sustainable cooling for high-performance computing or AI workloads. Måløy offers a high-stakes environment where geological stability and a hydroelectric surplus drive long-term cost efficiency and data sovereignty.
Måløy: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable backhaul with low-latency paths to European hubs. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Oslo serves as the primary regional on-ramp hub city. |
| Power Cost | $0.06/kWh, as of September 2025 | Exceptionally low rates powered by 96% renewable hydroelectric sources. |
| Disaster Risk | Low (1.9/10), as of September 2025 | Exceptionally stable geography with negligible seismic or weather risks. |
| Tax Incentives | No | No specific data center tax incentives currently exist. |
| Sales Tax | 25% VAT, as of September 2025 | Standard Norwegian VAT applies to business transactions. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: under 5 as of September 2025. While the provider count is specialized, the local market maintains neutrality within its primary high-security facility. High-capacity fiber connects the region directly to Oslo and international transit points to ensure performance for international tenants.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions as of September 2025. No direct physical on-ramps for AWS, Google Cloud (GCP), Microsoft Azure, Alibaba Cloud, Oracle Cloud, or IBM Cloud are located in Måløy. Private extensions via wave services to Oslo provide the necessary path for hybrid cloud architectures.
Internet Exchange Points (IXPs): Public peering is limited locally, with most traffic routed to the NIX in Oslo for regional and international exchange.
Bare Metal: General availability for dedicated hardware is present through providers such as Latitude.sh and Hivelocity as of September 2025. These services offer a flexible alternative to traditional colocation for rapid hardware scaling.
Power Analysis
Average Cost Of Power: $0.06/kWh, as of September 2025. This rate is driven by a massive surplus of hydroelectric power, offering a significant reduction in operating expenses for energy-intensive research or AI workloads compared to the European average.
Power Grid Reliability: The local grid is exceptionally resilient, supported by multi-substation redundancy and a massive hydroelectric infrastructure. It is purpose-built for high-load industrial reliability and long-term stability.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers here serve the seafood, maritime, and renewable energy sectors. These industries rely on Måløy for low-latency processing of industrial IoT and research data.
Regional Market Reach: From this coastal node, infrastructure providers effectively serve the entire Nordic region and Northern Europe. The stability of the Norwegian economy makes it a preferred destination for long-term capital investment.
Tax Advantage For Data Centers: Norway maintains a clear tax structure for international businesses. The primary financial benefit comes from extreme energy efficiency and the absence of mechanical cooling costs in subterranean environments, which directly improves the bottom line.
Natural Disaster Risk
The environmental risk profile for Måløy is Low (1.9/10) as of September 2025. The placement of infrastructure within former mine sites significantly mitigates common atmospheric hazards.
- Coastal Flood: 6.6 (as of September 2025). While a factor for the port area, the primary data center infrastructure is subterranean and protected from sea-level changes.
- River Flood: 5.9 (as of September 2025). Regional water management is effective for surface support buildings.
- Drought: 2.2 (as of September 2025).
- Earthquake: 0.4 (as of September 2025). Seismic activity is negligible, providing a stable foundation for sensitive storage and compute hardware.
Other hazards such as tropical cyclones and tsunamis are not listed as material risks for this location.