Inflect logo
All Data CentersNorwayGjøvik

Data Centers in Gjøvik

1 locations found

Data centers map in GjøvikInteractive map loads on demand to keep the page fast.

Need Help?

Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.

Explore Other Markets in Norway

Gjøvik – Secure Hydropower for Resilient Nordic Computing

Executive Summary

Gjøvik is a specialized destination for enterprises requiring sustainable, high-density computing away from the congestion of the capital. This market serves as a vital disaster recovery node for Nordic operations, leveraging a massive local hydropower surplus to ensure long-term cost stability and operational integrity.

Gjøvik: At A Glance

FactorRating / DataNotes
Global Connectivity GradeBReliable fiber with direct paths to Oslo.
Direct Cloud On-Ramps0 – as of December 2025Private connections available to Oslo hubs.
Power Costkr 0.55/kWh – as of December 2025Competitive pricing from local hydro resources.
Disaster RiskLow (1.9/10) – as of December 2025Geographically stable inland location.
Tax IncentivesNo – as of December 2025No specific data center tax breaks are active.
Sales Tax25% VAT – as of December 2025Standard national value-added tax.

Network & Connectivity Ecosystem

Carrier Density & Carrier Neutrality: Carrier count: over 5. The market is served by approximately 5 to 10 national and regional providers as of December 2025. These carriers focus on resilient backhaul to the capital, ensuring consistent uptime for remote management and data synchronization.

Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions. As of December 2025, there are no physical on-ramps located within the city. Enterprise access to AWS, Google Cloud (GCP), and Microsoft Azure is managed via private network interconnects or leased lines to Oslo, approximately 120 kilometers away.

Internet Exchange Points (IXPs): Local traffic management relies on private peering and regional fiber providers. Public peering for the region is primarily facilitated through the Norwegian Internet eXchange in Oslo to maintain high efficiency.

Bare Metal: High-performance hardware is available through regional service providers. Global infrastructure options from Leaseweb can be integrated via hybrid configurations for specific compute requirements as of December 2025.

Power Analysis

Average Cost Of Power: kr 0.55/kWh, as of December 2025. The local energy mix is approximately 96% renewable, dominated by hydroelectric generation. This low cost and green profile provide a clear advantage for power-hungry deployments like AI training or large-scale data processing.

Power Grid Reliability: The local grid is purpose-built for industrial stability. It features a well-engineered infrastructure supported by multiple substations, resulting in high availability and minimal fluctuations for critical hardware as of December 2025.

Market Access, Business & Tax Climate

Proximity To Key Business Districts: Gjøvik is a center for technology and research, housing the Norwegian University of Science and Technology. This proximity provides a steady pipeline of technical talent for managing specialized infrastructure.

Regional Market Reach: This location serves the Interior of Norway while acting as a strategic redundancy point for the Oslo metropolitan area. It provides enough distance for disaster recovery compliance while maintaining low-latency connectivity.

Tax Advantage For Data Centers: While no unique local tax breaks exist, the national corporate framework remains stable for long-term investment. The primary financial benefit is the low cost of renewable energy, which reduces the total cost of ownership for large operators.

Natural Disaster Risk

The overall risk profile for Gjøvik is Low (1.9/10), as of December 2025. The region is characterized by extreme geographical stability, making it a preferred site for secure data storage.

  • River Flood (5.9): Managed through strict zoning and infrastructure placement away from the riverfront.
  • Drought (2.2): Minimal impact on facility operations due to the abundance of regional water resources.
  • Earthquake (0.4): Seismic activity is negligible and poses no threat to structural integrity.
  • Human-Induced Risk (1.0): A low probability of conflict ensures a secure operating environment.

Coastal flooding and tsunami risks are not applicable to this inland location. All other natural hazards are considered minor or are not listed for this territory as of December 2025.

WHY CHOOSE US?Helping You Find Connectivity Solutions For Your Business
Inflect logo
Expert SupportGet help from industry pros. Free of charge
Best DealsAccess exclusive deals from top providers.
Seamless ExperienceResearch, compare and purchase, all in one place.
Fast ResponsesGet your questions answered within 24 hours.
Our Partners
EquinixZayoDigital RealtyAT&T BusinessLumenArelion