Data Centers in Sandefjord
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Norway
Sandefjord – Resilient Nordic Infrastructure Powered by Renewables
Executive Summary
Sandefjord serves as a strategic secondary hub for organizations requiring extreme reliability and carbon-neutral operations outside the capital. Its proximity to Oslo provides a secure foundation for mission-critical disaster recovery and industrial edge applications without the premium costs of a primary metro.
Sandefjord: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional performance for Nordic and Northern European traffic. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Oslo serves as the primary regional access point for major clouds. |
| Power Cost | $0.06 – $0.09/kWh – as of September 2025 | Among the lowest in Europe due to hydroelectric surplus. |
| Disaster Risk | Low (1.9/10) – as of September 2025 | Stable geography with minimal environmental threats to infrastructure. |
| Tax Incentives | No – as of September 2025 | Standard Norwegian corporate tax structure with no specific local breaks. |
| Sales Tax | 25% VAT – as of September 2025 | Consistent with national Norwegian tax policy for all services. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 5, as of September 2025. The ecosystem includes a mix of national incumbents and regional fiber specialists, typically offering a range of ~5–10 providers to ensure path diversity for resilient operations.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions, as of September 2025. While no local on-ramps exist, sub-millisecond latency is standard through private wave extensions to the primary cloud hub in Oslo, where AWS, Google Cloud (GCP), and Microsoft Azure maintain presence.
Internet Exchange Points (IXPs): Local traffic typically peers via the Norwegian Internet eXchange (NIX) in Oslo, which acts as the central clearinghouse for national data exchange and regional peering.
Bare Metal: High-performance physical hardware is available through reliable global providers like Leaseweb, supporting latency-sensitive workloads and high-density compute requirements.
Power Analysis
Average Cost Of Power: Industrial electricity rates range between $0.06 – $0.09/kWh, as of September 2025. This competitive pricing stems from an energy mix that is approximately 96% renewable, predominantly from hydroelectric sources, providing a built-in sustainability advantage for high-capacity users.
Power Grid Reliability: The local grid is supported by a well-engineered national network featuring redundant substations. This infrastructure ensures consistent delivery for high-density compute environments without frequent fluctuations or downtime.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Facilities are strategically located near the logistics, shipping, and IT service clusters of the Vestfold region. This location allows for low-latency communication with industrial sites and corporate headquarters throughout southern Norway.
Regional Market Reach: Sandefjord effectively serves the greater Oslo Fjord region and acts as a gateway to the broader Nordic population, making it an ideal site for edge deployments and backup systems for the Scandinavian market.
Tax Advantage For Data Centers: Norway provides a clear tax framework for technology investments, though no specific local incentives are currently active in Sandefjord. The primary financial benefit remains the lower operating cost of renewable power, which significantly reduces long-term overhead for large-scale deployments.
Natural Disaster Risk
Total Risk Score: Low (1.9/10), as of September 2025. Sandefjord is a geographically stable region with very few environmental threats to physical infrastructure.
- Coastal Flood (6.6): A moderate risk given the coastal position, though facilities are built on elevated terrain to prevent water ingress.
- River Flood (5.9): Managed through local drainage systems and topographical planning.
- Drought (2.2): A minor concern for cooling systems, mitigated by the humid climate and consistent water availability.
- Earthquake (0.4): Seismic activity is negligible and does not impact structural integrity requirements for data center facilities.
Other natural hazards like tropical cyclones and tsunamis are not material threats for this geography.