Inflect logo

Mobile Navigation

Mobile Navigation

All Data CentersNorwayHamar

Data Centers in Hamar

1 locations found

Data centers map in HamarInteractive map loads on demand to keep the page fast.

Need Help?

Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.

Explore Other Markets in Norway

Hamar – High-Efficiency Sustainability for Modern Compute

Executive Summary

Hamar serves as a high-performance alternative for enterprises prioritizing sustainability and cost control over capital-city price premiums. This market utilizes Norway’s massive hydroelectric surplus to provide extreme uptime and predictable operational expenses. It is the logical choice for high-density compute where geological stability and green energy are mandatory.

Hamar: At A Glance

FactorRating / DataNotes
Global Connectivity GradeBReliable national fiber with direct paths to Oslo.
Direct Cloud On-Ramps0 – as of September 2025Nearest on-ramp hub is Oslo; accessible via private transport.
Power Cost$0.06/kWh – as of September 2025Powered by 96% renewables, primarily hydroelectric sources.
Disaster RiskLow (1.9/100) – as of September 2025One of the safest regions globally for physical infrastructure.
Tax IncentivesNo – as of September 2025No specific data center tax incentives are active.
Sales Tax25% VAT – as of September 2025Standard Norwegian Value Added Tax rate.

Network & Connectivity Ecosystem

Hamar operates as a key secondary connectivity node, sitting directly on the primary fiber routes connecting Oslo to the northern regions.

Carrier Density & Carrier Neutrality: Carrier count: over 5. The market provides a mix of national incumbents and regional fiber specialists, including Telenor and GlobalConnect. Expect a carrier availability range of 5–15 providers as of September 2025.

Direct Cloud On-Ramps: 0, enabling access to 0 cloud regions. As of September 2025, no native on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure exist within the city. Local operators provide low-latency private extensions to the Oslo hub, the primary gateway for major cloud regions.

Internet Exchange Points (IXPs): Most public peering occurs at the Norwegian Internet eXchange (NIX) in Oslo. Local traffic typically uses private peering or backhaul to national exchange points to ensure performance as of September 2025.

Bare Metal: Dedicated hardware services are available through regional providers and global specialists like Leaseweb or IONOS. These options provide dedicated resources without the overhead of virtualization as of September 2025.

Power Analysis

The power profile in Hamar represents its strongest competitive edge for high-performance computing.

Average Cost Of Power: Industrial electricity is approximately $0.06/kWh, as of September 2025. This pricing, paired with a grid that is roughly 96% renewable, results in some of the lowest operational costs in Europe. These rates provide a massive advantage for power-hungry AI and batch processing workloads.

Power Grid Reliability: The local grid is well-engineered and supported by multi-substation redundancy. Reliability is exceptional due to abundant local hydroelectric generation, which protects against the large-scale outages seen in more congested markets as of September 2025.

Market Access, Business & Tax Climate

Hamar offers a stable environment for long-term infrastructure investment with a focus on operational efficiency.

Proximity To Key Business Districts: Data centers are located near Hamar Science Park and the growing tech corridor in Innlandet. This location is vital for regional public sector entities and agritech companies requiring local data residency as of September 2025.

Regional Market Reach: From Hamar, providers serve the Greater Oslo region and the Norwegian interior effectively. The city is also positioned as a primary site for disaster recovery for firms based in the capital.

Tax Advantage For Data Centers: Standard Norwegian corporate tax structures apply. The main financial benefit for customers is the absence of a specific data center tax and predictable power costs that reduce the total cost of ownership as of September 2025.

Natural Disaster Risk

The natural disaster risk for Hamar is rated Low (1.9/100) as of September 2025. The region is geologically stable and located far enough inland to avoid severe weather events typical of coastal areas.

  • River Flood: 5.9 (Moderate). This is the primary concern for the region, though sites are typically built on elevated ground.
  • Coastal Flood: 6.6 (Moderate). This is a regional national figure; Hamar’s inland location makes the direct local risk negligible.
  • Drought: 2.2 (Low).
  • Earthquake: 0.4 (Low).
  • Tropical Cyclone: 0.0 (Low).

All other hazards, including tsunamis, are not applicable to this inland metro or are considered minor as of September 2025.

WHY CHOOSE US?Helping You Find Connectivity Solutions For Your Business
Inflect logo
Expert SupportGet help from industry pros. Free of charge
Best DealsAccess exclusive deals from top providers.
Seamless ExperienceResearch, compare and purchase, all in one place.
Fast ResponsesGet your questions answered within 24 hours.
Our Partners
EquinixZayoDigital RealtyAT&T BusinessLumenArelion