Inflect logo
All Data CentersMexicoHermosillo

Data Centers in Hermosillo

1 locations found

Data centers map in HermosilloInteractive map loads on demand to keep the page fast.

Need Help?

Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.

Explore Other Markets in Mexico

Hermosillo – High-Performance Edge for Industrial Sonora

Executive Summary

Hermosillo is the logical choice for enterprises requiring high-performance processing near the United States border and the industrial center of Sonora. It provides the infrastructure necessary to support massive manufacturing and aerospace operations that cannot tolerate the latency of distant national hubs. This market is built for speed and regional reliability.

Hermosillo: At A Glance

FactorRating / DataNotes
Global Connectivity GradeBReliable regional hub near the U.S. border.
Direct Cloud On-Ramps0 – as of September 2025Reach major hubs in Phoenix or Mexico City.
Power Cost$0.09 – $0.13/kWh – as of September 2025Competitive rates for large scale operations.
Disaster RiskModerate (4.9/10) – as of September 2025Primary risks include seismic and flood events.
Tax IncentivesYesCredit packages for digital infrastructure projects.
Sales Tax16% VAT – as of September 2025Standard national value-added tax rate.

Network & Connectivity Ecosystem

Carrier Density & Carrier Neutrality: Carrier count: over 5 – as of September 2025. The market provides a mix of national incumbents and regional fiber specialists. These providers offer competitive transport and diverse routing options for resilient architecture.

Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions – as of September 2025. While local on-ramps are absent, local operators provide private transport or wave services. These connect directly with major cloud clusters in Phoenix or Mexico City.

Internet Exchange Points (IXPs): Public peering is limited in the city. Most traffic routes via private interconnects or the nearest national hub in Mexico City to maintain regional performance.

Bare Metal: High-performance compute is available through providers such as Hivelocity and Latitude.sh. These options support rapid deployment for edge workloads without long-term hardware commitments.

Power Analysis

Average Cost Of Power: Industrial electricity ranges from $0.09/kWh to $0.13/kWh, as of September 2025. This pricing provides a predictable cost structure for scaled operations compared to high-cost coastal markets.

Power Grid Reliability: The local grid is supported by multi-substation redundancy and well-engineered distribution lines. This setup ensures reliable service for the heavy manufacturing and data center corridors throughout the city.

Market Access, Business & Tax Climate

Proximity To Key Business Districts: Data centers are located near industrial parks and the commercial core. This proximity allows for high-speed local loops to automotive and aerospace firms requiring low-latency connectivity for automated production.

Regional Market Reach: Hermosillo is the primary gateway for the state of Sonora. It effectively serves a population of nearly 3 million people across the Northwest Mexican corridor.

Tax Advantage For Data Centers: Mexico offers specific development bank credit packages aimed at expanding digital infrastructure. This financial support helps customers reduce initial capital outlays and promotes long-term infrastructure stability.

Natural Disaster Risk

Hermosillo carries a Moderate (4.9/10) risk profile as of September 2025. Facility operators prioritize structural integrity to manage seismic and environmental variables common to the region.

  • Earthquake (8.2): This is the primary risk factor requiring seismic-rated construction.
  • River Flood (7.9): Managed through specific site selection and elevated equipment platforms.
  • Tropical Cyclone (7.1): Indirect risk where coastal impacts affect regional logistics and transport routes.
  • Epidemic (5.4): Standard regional factor with minimal impact on hardened physical infrastructure.
  • Drought (3.0): Low risk impact for modern facilities using closed-loop cooling systems.

Other natural hazards are minor or not listed for this inland metro area.

WHY CHOOSE US?Helping You Find Connectivity Solutions For Your Business
Inflect logo
Expert SupportGet help from industry pros. Free of charge
Best DealsAccess exclusive deals from top providers.
Seamless ExperienceResearch, compare and purchase, all in one place.
Fast ResponsesGet your questions answered within 24 hours.
Our Partners
EquinixZayoDigital RealtyAT&T BusinessLumenArelion