Data Centers in Hermosillo
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Mexico
Hermosillo – Strategic Edge Gateway for Northwest Mexico
Executive Summary
Hermosillo is a vital edge market for enterprises requiring high-performance processing near the United States border and the industrial center of Sonora. It provides the localized infrastructure necessary to support massive manufacturing and aerospace operations that cannot tolerate the latency of distant hubs.
| Hermosillo: At A Glance | Factor | Rating / Data | Notes | | :--- | :--- | :--- | | Global Connectivity Grade | B | Reliable regional hub with strong border proximity. | | Direct Cloud On-Ramps | 0 – as of September 2025 | Reach major hubs in Phoenix or Mexico City. | | Power Cost | $0.09 – $0.13/kWh – as of September 2025 | Competitive rates for large scale industrial operations. | | Disaster Risk | Moderate (4.9/10) – as of September 2025 | Primary risks include seismic and flooding events. | | Tax Incentives | Yes | Credit packages available for digital infrastructure projects. | | Sales Tax | 16% VAT – as of September 2025 | Standard national value-added tax rate. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 5 – as of September 2025. The market provides a mix of national incumbents and regional fiber specialists, offering ~5–10 providers for competitive transport and diverse routing options.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions – as of September 2025. While local on-ramps are absent, local operators provide private transport or wave services to connect with major cloud clusters in Phoenix or Mexico City.
Internet Exchange Points (IXPs): Public peering is limited in the city, with most traffic routing via private interconnects or the nearest national hub in Mexico City to maintain regional performance.
Bare Metal: High-performance compute is available through providers such as Hivelocity and Latitude.sh, supporting rapid deployment for edge workloads.
Power Analysis
Average Cost Of Power: Industrial electricity ranges from $0.09/kWh to $0.13/kWh, as of September 2025. This pricing provides a predictable cost structure for scaled operations compared to high-cost coastal markets.
Power Grid Reliability: The local grid is supported by multi-substation redundancy and well-engineered distribution lines. This setup ensures reliable service for the heavy manufacturing and data center corridors in the city.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers are located near industrial parks and the commercial core. This proximity allows for high-speed local loops to automotive and aerospace firms requiring low-latency connectivity for automated production.
Regional Market Reach: Hermosillo is the primary gateway for the state of Sonora, effectively serving a population of nearly 3 million people across the Northwest Mexican corridor.
Tax Advantage For Data Centers: Mexico offers specific development bank credit packages aimed at expanding digital infrastructure. This financial support helps customers reduce initial capital outlays and promotes long-term infrastructure stability.
Natural Disaster Risk
Hermosillo carries a Moderate (4.9/10) risk profile as of September 2025. Facility operators prioritize structural integrity to manage seismic and environmental variables common to the region.
- Earthquake (8.2): Primary risk factor requiring seismic-rated construction.
- River Flood (7.9): Managed through specific site selection and elevated equipment platforms.
- Tropical Cyclone (7.1): Indirect risk; coastal impacts can affect regional logistics and transport routes.
- Coastal Flood (6.3): Indirect risk; primarily impacts regional transport routes rather than inland sites.
Other natural hazards are minor or not listed for this inland metro area.