Data Centers in Veracruz
2 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Mexico
Veracruz – Maritime Edge for Industrial Connectivity
Veracruz serves as the critical maritime digital gateway for the Gulf of Mexico. This market is vital for logistics firms and industrial operators requiring edge processing for international trade workflows. By placing compute near the port, organizations ensure resilient commercial data handling for high-stakes shipping operations.
Veracruz: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable for regional trade and domestic transport. |
| Direct Cloud On-Ramps | 0 — as of January 2026 | Nearest hub is Mexico City for private extensions. |
| Power Cost | $0.11–$0.14/kWh, as of January 2026 | Competitive rates for industrial edge deployments. |
| Disaster Risk | Moderate (4.9/10), as of January 2026 | Requires attention to coastal storms and seismic activity. |
| Tax Incentives | Yes | Development bank credits support digital infrastructure. |
| Sales Tax | 16% VAT, as of January 2026 | Standard national rate for services and hardware. |
Network & Connectivity Ecosystem
As a specialized secondary market, Veracruz provides the essential plumbing for regional commerce while leveraging national hubs for massive scale.
Carrier Density & Carrier Neutrality: Carrier count: over 5. As of January 2026, the market is supported by ~5–10 carriers including national telecommunications leaders and specialized regional fiber providers.
Direct Cloud On-Ramps: 0, enabling access to 0 cloud regions. As of January 2026, Veracruz utilizes high-speed private transport to connect with major cloud on-ramps in Mexico City or Queretaro.
Internet Exchange Points (IXPs): Local peering is primarily managed through private interconnects or by routing traffic to the national exchange in Mexico City for high-volume needs.
Bare Metal: Dedicated compute is available for edge workloads, with reliable options from providers such as Hivelocity or Latitude.sh as of January 2026.
Power Analysis
Energy stability in Veracruz is closely linked to its industrial importance, ensuring the grid supports 24/7 commercial operations.
Average Cost Of Power: Industrial electricity ranges from $0.11–$0.14/kWh, as of January 2026. These rates are attractive for companies looking to manage operational costs while maintaining high-performance edge sites outside major metropolitan centers.
Power Grid Reliability: The local grid is purpose-built to support the heavy energy demands of one of the busiest ports in Latin America. Facilities generally benefit from redundant feeds and multi-substation support to ensure consistent uptime.
Market Access, Business & Tax Climate
Veracruz acts as more than just a transit point; it is a gateway for data moving between the Gulf and the interior.
Proximity To Key Business Districts: Data centers are located near the Port of Veracruz and surrounding industrial corridors. This proximity is essential for customs brokers, freight forwarders, and logistics providers who require real-time data processing for international shipping operations.
Regional Market Reach: This infrastructure serves the entire State of Veracruz and acts as a connectivity anchor for the eastern coast of Mexico, reaching millions of regional users and commercial entities.
Tax Advantage For Data Centers: Specialized credit packages from the Mexico development bank provide financial support for expanding digital infrastructure. These incentives help offset the initial capital costs of deploying modern hardware and facility upgrades.
Natural Disaster Risk
Veracruz maintains a Moderate (4.9/10) risk profile as of January 2026. Given its coastal location and regional tectonic environment, site selection must prioritize structural integrity and flood mitigation.
- Earthquake (8.2/10): Seismic activity is a significant factor, requiring facilities to meet high structural standards.
- River Flood (7.9/10): Heavy seasonal rains can impact low-lying areas, making elevation a key design requirement.
- Tropical Cyclone (7.1/10): Gulf storms require wind-resistant builds and fuel autonomy for backup power.
- Coastal Flood (6.3/10): Storm surges are a documented regional risk for facilities located near the shoreline.
- Tsunami (5.5/10): Risk is present due to the regional tectonic setting, though less frequent than tropical storms.