Data Centers in Nogales
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Mexico
Nogales – Your Strategic Cross-Border Connectivity Hub
Executive Summary
Nogales is a critical bridge for organizations requiring low-latency links between the United States and the industrial north of Mexico. Placing infrastructure here secures a reliable foothold at the edge, optimizing cross-border data flows and reducing transit costs for manufacturing and logistics firms. It is a vital site for securing high-speed, resilient interconnections in a high-stakes trade corridor.
Nogales: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional and international transit routes. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest hub is Phoenix, Arizona. |
| Power Cost | $0.09–$0.14/kWh, as of September 2025 | Competitive industrial rates for the region. |
| Disaster Risk | Moderate (4.9/10), as of September 2025 | Seismic activity and flooding are the primary concerns. |
| Tax Incentives | Yes | Development bank credit packages support digital expansion. |
| Sales Tax | 16% VAT, as of September 2025 | Standard national rate for services. |
Network & Connectivity Ecosystem
Nogales functions as a vital junction for fiber traffic moving between Arizona and the Mexican interior as of September 2025.
Carrier Density & Carrier Neutrality: Carrier count: over 5. Facilities in this market typically support a range of ~5–10 providers as of September 2025. Connectivity is centered on regional fiber and cross-border transport, making it a strategic choice for resilient north-south routing.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions. While there are no native cloud on-ramps in the city, the nearest on-ramps for AWS, Google Cloud (GCP), and Microsoft Azure are in Phoenix, Arizona. These are reachable via low-latency private transport or dedicated wavelengths as of September 2025.
Internet Exchange Points (IXPs): Peering in this market is primarily handled through private interconnects or by routing to larger national hubs in Mexico City or Phoenix to reach global exchanges as of September 2025.
Bare Metal: Dedicated server options and high-performance compute resources are available through providers such as Hivelocity and phoenixNAP as of September 2025.
Power Analysis
Electrical infrastructure in this region is purpose-built to support heavy industrial manufacturing.
Average Cost Of Power: Industrial electricity ranges from $0.09 to $0.14/kWh as of September 2025. This pricing supports cost-effective edge operations compared to expensive U.S. coastal markets, providing a clear advantage for power-intensive workloads.
Power Grid Reliability: The grid is supported by multi-substation infrastructure and redundant pathways designed for industrial stability. Regional power generation relies on a mix of fossil fuels and increasing renewable capacity as of September 2025.
Market Access, Business & Tax Climate
Nogales is a focal point for North American trade and industrial production.
Proximity To Key Business Districts: Facilities are positioned near the maquiladora zones and trade corridors that drive the regional economy. This proximity is vital for companies managing real-time logistics and manufacturing data across the border.
Regional Market Reach: Nogales serves as a primary digital entry point for U.S.–Mexico trade traffic and provides an effective gateway to the state of Sonora.
Tax Advantage For Data Centers: National credit packages through development banks offer targeted financial support for digital infrastructure expansion. This helps operators reduce capital expenditure during the initial build phase and improves long-term project viability.
Natural Disaster Risk
The risk profile for Nogales is categorized as Moderate (4.9/10) as of September 2025. Infrastructure planning must account for specific natural hazards that can impact uptime.
- Earthquake (8.2/10): High seismic activity is the primary concern, requiring resilient building standards as of September 2025.
- River Flood (7.9/10): Seasonal weather patterns can lead to localized flooding in low-lying areas.
- Tropical Cyclone (7.1/10): Regional storms may impact power stability and transit routes.
- Drought (3.0/10): Water scarcity is a factor for long-term facility cooling strategies.
While tsunami and coastal flooding are listed in national risk profiles, they do not directly impact this inland location.