Inflect logo

Mobile Navigation

Mobile Navigation

All Data CentersChinaShijiazhuang

Data Centers in Shijiazhuang

2 locations found

Data centers map in ShijiazhuangInteractive map loads on demand to keep the page fast.

Need Help?

Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.

Explore Other Markets in China

Shijiazhuang – Low-Cost Disaster Recovery Hub for North China

Shijiazhuang is the preferred secondary market for enterprises requiring rapid access to Beijing without paying the capital’s high real estate and power premiums. It provides a reliable footprint for industrial data processing and resilient disaster recovery strategies within the Jing–Jin–Ji economic corridor. This market ensures stable operations for high-performance workloads that prioritize cost-efficiency over ultra-low latency.

FactorRating / DataNotes
Global Connectivity GradeBSolid regional access via national fiber backbones.
Direct Cloud On-Ramps0 – as of September 2025Beijing is the nearest hub for direct access.
Power Cost$0.08/kWh – as of June 2025Competitive rates supported by coal and renewables.
Disaster RiskLow (3.0/10) – as of September 2025Stable profile with manageable localized flood risks.
Tax IncentivesNoNo sector-specific incentives currently available.
Sales Tax13% VAT – as of September 2025Standard national rate for digital services.

Network & Connectivity Ecosystem

Shijiazhuang serves as a critical telecommunications junction for Hebei province, acting as a transit point for traffic flowing into the northern national backbones.

Carrier Density & Carrier Neutrality: Carrier count: over 20 carriers as of September 2025. The environment includes major state-owned telcos and regional private fiber operators, providing sufficient diversity for local loops and long-haul transport.

Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions as of September 2025. There are no native on-ramps in the city; however, most providers facilitate private extensions to the massive cloud availability zones in Beijing.

Internet Exchange Points (IXPs): Peering typically occurs through private interconnects or by leveraging national exchange points in Beijing to maximize throughput. Local traffic relies on direct carrier-to-carrier handoffs.

Bare Metal: High-performance bare metal is available through providers such as Hivelocity and Latitude.sh, supporting specialized industrial and compute-heavy workloads.

Power Analysis

Power availability is a primary driver for the data center industry in this region, benefiting from infrastructure built for heavy industry.

Average Cost Of Power: Industrial electricity: $0.08/kWh as of June 2025. This pricing model offers a notable cost advantage compared to Beijing, making it ideal for power-hungry deployments. The energy mix consists of approximately 65% fossil fuels and 30% renewables as of June 2025.

Power Grid Reliability: The local grid is purpose-built to support heavy manufacturing and high-tech industrial zones, utilizing multi-substation support and redundant transmission lines to ensure high uptime.

Market Access, Business & Tax Climate

The city acts as a release valve for the crowded Beijing market, offering a more accessible entry point for regional infrastructure.

Proximity To Key Business Districts: Facilities are situated near the High-tech Industrial Development Zone, serving pharmaceutical, manufacturing, and logistics sectors that need local data processing.

Regional Market Reach: Shijiazhuang serves as the primary hub for the Hebei province population of 74 million and acts as a vital logistics node for northern China.

Tax Advantage For Data Centers: There are currently no specific tax incentives for data center operators in this city. Success here depends on leveraging lower utility costs and operational efficiencies to maintain healthy margins.

Natural Disaster Risk

Shijiazhuang maintains a Low (3.0/10) risk profile according to international standards as of September 2025. While geologically stable, specific environmental factors require site-specific mitigation.

  • River Flood (9.3/10): This is the primary localized concern, requiring facilities to utilize elevated equipment floors and specialized flood mitigation.
  • Tropical Cyclone (7.8/10): These events are typically indirect, manifesting as heavy inland rainfall and wind.
  • Earthquake (6.7/10): Regional seismic activity exists, though facilities are constructed to meet rigorous building safety codes.
  • Drought (4.6/10): A moderate long-term factor for facilities using traditional water-cooling systems.

Coastal hazards such as Tsunami and Coastal Flood are not material factors for this inland location. All hazard scores are as of September 2025.

WHY CHOOSE US?Helping You Find Connectivity Solutions For Your Business
Inflect logo
Expert SupportGet help from industry pros. Free of charge
Best DealsAccess exclusive deals from top providers.
Seamless ExperienceResearch, compare and purchase, all in one place.
Fast ResponsesGet your questions answered within 24 hours.
Our Partners
EquinixZayoDigital RealtyAT&T BusinessLumenArelion