Inflect logo

Mobile Navigation

Mobile Navigation

All Data CentersChinaChengdu

Data Centers in Chengdu

1 locations found

Data centers map in ChengduInteractive map loads on demand to keep the page fast.

Need Help?

Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.

Explore Other Markets in China

Chengdu – Strategic Gateway to Western China Infrastructure

Executive Summary

Chengdu is the primary digital anchor for enterprises targeting the massive consumer base and industrial zones of Western China. It serves as a vital location for aerospace, digital finance, and high-tech manufacturing that require local presence to avoid the latency of backhauling traffic to coastal hubs.

Chengdu: At A Glance

FactorRating / DataNotes
Global Connectivity GradeBReliable regional performance for Western China.
Direct Cloud On-Ramps0 – as of September 2025Closest major hubs are Shanghai and Beijing.
Power Cost$0.08/kWh – as of June 2025Competitive rates supported by coal and hydro.
Disaster RiskLow (3.0/10) – as of September 2025Manageable risk profile for localized operations.
Tax IncentivesNo – as of September 2025No specific regional data center subsidies identified.
Sales Tax13% VAT – as of September 2025Standard Chinese rate for technology services.

Network & Connectivity Ecosystem

Carrier Density & Carrier Neutrality: Carrier count: over 5. As of September 2025, the market is served by major national providers and specialized regional players, offering a focused selection for local interconnection.

Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions. As of September 2025, there are no direct on-ramps for major global providers within the city. Connectivity to AWS, Microsoft Azure, or Alibaba Cloud typically requires private extensions to Shanghai or Beijing.

Internet Exchange Points (IXPs): The Chengdu National Internet Exchange Center localizes traffic for the Western China region, reducing the need to route data through distant coastal exchanges as of September 2025.

Bare Metal: Resilient infrastructure options are available from global providers such as OVHcloud or Leaseweb as of September 2025.

Power Analysis

Average Cost Of Power: Industrial electricity is priced at $0.08/kWh as of June 2025. The energy mix consists of approximately 65% fossil fuels (mostly coal), 30% renewables including a significant hydro component, and 5% nuclear as of June 2025. These rates provide a stable cost base for power-intensive compute workloads.

Power Grid Reliability: The local grid is purpose-built to support heavy manufacturing and massive high-tech zones. It utilizes redundant substation support to ensure consistency for mission-critical infrastructure.

Market Access, Business & Tax Climate

Proximity To Key Business Districts: Data centers are positioned to serve the Tianfu Software Park and the Chengdu High-Tech Zone. This proximity is vital for low-latency communication with the regional headquarters of global electronics and software firms.

Regional Market Reach: Chengdu is the economic engine for Sichuan Province, providing an entry point to a market of over 80 million people. It serves as the logical hub for distributing digital services across the western interior.

Tax Advantage For Data Centers: While specific data center incentives are not active, the city offers a lower cost of entry compared to Tier 1 markets. This enables companies to scale their infrastructure with lower capital requirements for facility space and local operations.

Natural Disaster Risk

Overall Risk: Low (3.0/10) as of September 2025. The risk profile is manageable, with specific attention required for hydrological factors.

  • River Flood (9.3/10): Significant risk due to the local river systems; facilities typically employ elevated equipment and drainage systems as of September 2025.
  • Tsunami (9.0/10): This hazard is an indirect regional factor only and does not pose a direct threat to the metro area as of September 2025.
  • Coastal Flood (9.0/10): This hazard is an indirect regional factor only and does not pose a direct threat to the metro area as of September 2025.
  • Tropical Cyclone (7.8/10): Regional activity can impact external infrastructure even in inland locations as of September 2025.
  • Earthquake (6.7/10): Seismic activity is a known factor in the province, requiring specific structural engineering standards for data centers as of September 2025.
  • Drought (4.6/10): A moderate concern for cooling systems that rely heavily on water consumption as of September 2025.
WHY CHOOSE US?Helping You Find Connectivity Solutions For Your Business
Inflect logo
Expert SupportGet help from industry pros. Free of charge
Best DealsAccess exclusive deals from top providers.
Seamless ExperienceResearch, compare and purchase, all in one place.
Fast ResponsesGet your questions answered within 24 hours.
Our Partners
EquinixZayoDigital RealtyAT&T BusinessLumenArelion