Data Centers in Amaravati
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in India
Amaravati – Scalable Infrastructure for India's New Capital
Executive Summary
Amaravati provides a strategic, purpose-built environment for enterprises looking to avoid the heavy congestion and high costs of traditional Tier 1 Indian hubs. This market is a prime choice for public sector organizations and technology firms requiring scalable infrastructure to support the rapid economic expansion of South India.
Amaravati: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional fiber with growing national reach. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest major on-ramps are located in Hyderabad. |
| Power Cost | $0.07/kWh – as of September 2025 | Competitive industrial rates with 23% renewables. |
| Disaster Risk | High (5.5/10) – as of September 2025 | Primary concerns include river flooding and seismic activity. |
| Tax Incentives | No – as of September 2025 | Focus remains on physical infrastructure development. |
| Sales Tax | 18% GST – as of September 2025 | Standard Indian Goods and Services Tax applies. |
Network & Connectivity Ecosystem
The connectivity landscape in Amaravati is maturing, providing a sturdy backbone for government and enterprise operations. Infrastructure here is built for long-term resilience as of September 2025.
Carrier Density & Carrier Neutrality: Carrier count: over 5. There are approximately 5–10 carriers providing diverse fiber routes as of September 2025. This density supports standard enterprise requirements while the local IT park continues to attract national providers.
Direct Cloud On-Ramps: 0, enabling access to 0 cloud regions as of September 2025. While local on-ramps are absent, low-latency access is available via private transport to Hyderabad, which serves as the primary cloud gateway for this region.
Internet Exchange Points (IXPs): Public peering options are limited within the immediate metro area as of September 2025. Most traffic exchange occurs through private interconnects or via the nearest national hubs in larger cities to ensure efficient routing.
Bare Metal: Dedicated hardware services are available through providers like Hivelocity or Latitude.sh, which leverage regional backbones to serve local compute needs as of September 2025.
Power Analysis
Energy stability is a core focus for the industrial zones in this region. The grid supports the high availability requirements of modern facilities as of September 2025.
Average Cost Of Power: $0.07/kWh, as of September 2025. This pricing remains competitive on a global scale, providing a predictable cost structure for high-density deployments. The energy mix includes roughly 23% renewables, helping meet sustainability goals.
Power Grid Reliability: The local grid is well-engineered to serve the IT Park, utilizing multi-substation support to minimize downtime as of September 2025. Redundant feeds are common for critical sites to ensure resilient operations.
Market Access, Business & Tax Climate
Amaravati is developing with a clear focus on the technology and government sectors of Andhra Pradesh as of September 2025.
Proximity To Key Business Districts: Data centers are located near the primary IT Park and government administrative zones. This proximity is vital for firms serving the public sector or tech startups requiring low-latency access to hardware.
Regional Market Reach: This location serves as a central point for the state, reaching a massive population across South and Central India. It is an ideal site for edge caching and regional distribution as of September 2025.
Tax Advantage For Data Centers: There are no specific tax incentives for data center operators in this market as of September 2025. The stability of the national tax framework allows for clear financial planning for infrastructure investments.
Natural Disaster Risk
The risk profile for Amaravati is defined by its proximity to the Krishna River and regional geological factors. Site selection must account for these environmental hazards as of September 2025.
Overall Risk: High (5.5/10) as of September 2025.
- River Flood (9.2): This is the primary hazard, requiring facilities to be built on elevated sites with purpose-built drainage systems.
- Earthquake (8.3): High seismic risk means structural engineering must meet stringent safety standards for resilient operation.
- Tropical Cyclone (7.7): Heavy seasonal rains and high winds are common, necessitating sturdy building envelopes.
- Drought (6.4): Moderate risk that could impact cooling systems reliant on large-scale water consumption.
- Regional Note: Tsunami and Coastal Flood risks are rated high for the state but are considered indirect for this inland metro area.