Inflect logo

Mobile Navigation

Mobile Navigation

All Data CentersSerbiaKragujevac

Data Centers in Kragujevac

1 locations found

not loaded

Need Help?

Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.

Explore Other Markets in Serbia

Kragujevac – Strategic Hub for Balkan Digital Services

Kragujevac is emerging as a strategic digital infrastructure hub in Serbia, offering a cost-effective and resilient location for reaching markets across the Balkans. Its primary data center provides direct cloud access, making it an excellent choice for businesses deploying hybrid cloud solutions and disaster recovery sites to serve Southeastern Europe. This market balances modern infrastructure with significant tax advantages, driving down the total cost of ownership.

Kragujevac: At A Glance

FactorRating / DataNotes
Global Connectivity GradeBReliable connectivity suitable for regional service delivery and disaster recovery.
Direct Cloud On-RampsOver 1 – as of September 2025Oracle Cloud is available locally, reducing latency to key enterprise services.
Power CostRSD 11.50-12.75/kWhBased on industrial rates as of September 2025; costs are competitive for the region.
Disaster RiskModerate (3.4/10)Primary risks are river flooding and seismic activity, as of September 2025.
Tax IncentivesYesIncludes import tariff/VAT exemptions for production equipment and export financing support.
Sales Tax20% VATStandard rate applied to services, as of September 2025.

Network & Connectivity Ecosystem

Carrier Density & Carrier Neutrality: As a key regional center, Kragujevac provides access to a range of national and regional carriers. The primary data center facility operates on a carrier-neutral basis, allowing interconnection with multiple providers to optimize cost and performance as of September 2025.

Direct Cloud On-Ramps: The market features one direct cloud on-ramp, enabling dedicated access to one global cloud region as of September 2025. This allows for low-latency hybrid cloud deployments and secure data transfer. The available on-ramp is:

  • Oracle Cloud

Internet Exchange Points (IXPs): While most peering occurs privately or through facilities in the capital, Belgrade, connectivity to the Serbian Open eXchange (SOX) is available. This access improves traffic routing efficiency and reduces latency within Serbia and the broader Balkan region.

Bare Metal: Bare metal server options are available in the region, providing dedicated, high-performance computing for demanding workloads. Providers like phoenixNAP offer solutions from nearby European locations to serve the Serbian market.

Power Analysis

Average Cost Of Power: Industrial electricity prices are estimated to range from RSD 11.50 to 12.75 per kWh as of September 2025. These competitive rates, combined with a grid heavily reliant on domestic coal and hydropower, offer predictable operational expenses for data center customers.

Power Grid Reliability: The power infrastructure supporting Kragujevac's data center corridor is well-engineered for uptime. The national grid provides sufficient capacity, and key facilities are supported by redundant power feeds, on-site generators, and uninterruptible power supply (UPS) systems to ensure service continuity.

Market Access, Business & Tax Climate

Proximity To Key Business Districts: Kragujevac is strategically located in the heart of Serbia's industrial region. Its data centers serve the city's significant manufacturing and automotive sectors, as well as providing a central point of presence for government and technology firms.

Regional Market Reach: From Kragujevac, businesses can effectively serve the entire Balkan peninsula, including Serbia, Bosnia and Herzegovina, Montenegro, and North Macedonia. Its central location makes it an ideal disaster recovery site for operations based in Belgrade or other regional capitals.

Tax Advantage For Data Centers: Serbia offers compelling financial incentives for data center operators and their clients. The government provides import tariff and VAT exemptions on production equipment, which directly lowers the capital expenditure required to launch or expand operations.

Natural Disaster Risk

Kragujevac has a moderate overall disaster risk profile, with a score of 3.4 out of 10 as of September 2025. The risk assessment indicates that while the overall threat is contained, specific environmental factors require consideration for infrastructure planning and resilience.

Key natural hazards include:

  • River Flood: Score 7.7/10
  • Earthquake: Score 5.3/10
  • Drought: Score 3.0/10

Risks from tsunamis, tropical cyclones, and coastal floods are negligible due to the city's inland location.

WHY CHOOSE US?Helping You Find Connectivity Solutions For Your Business
Inflect logo
Expert SupportGet help from industry pros. Free of charge
Best DealsAccess exclusive deals from top providers.
Seamless ExperienceResearch, compare and purchase, all in one place.
Fast ResponsesGet your questions answered within 24 hours.
Our Partners
EquinixZayoDigital RealtyAT&T BusinessLumenArelion