Data Centers in Hamilton
3 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Canada
Hamilton – Strategic Southern Ontario Hub
Hamilton offers a compelling data center location for businesses looking for robust infrastructure without the premium cost of the Toronto market. Its strategic position in the Golden Horseshoe provides low-latency connectivity to Canada's largest economic region, making it ideal for disaster recovery and production workloads that demand high uptime and value.
Hamilton: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Solid regional connectivity, but not a primary international gateway like Toronto. |
| Direct Cloud On-Ramps | 0 — as of September 2025 | Connect via Toronto, which offers extensive private extension and wave options. |
| Power Cost | C$0.12–C$0.15/kWh (est.) | Competitive rates in a stable, mixed-generation provincial grid. |
| Disaster Risk | Low (2.7/10), as of September 2025 | Very low exposure to major natural disasters common in other regions. |
| Tax Incentives | No, as of September 2025 | Federal and provincial programs may apply to specific industries. |
| Sales Tax | 5% Federal GST plus provincial taxes, as of September 2025 | Varies by province; check current Harmonized Sales Tax (HST) rates. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Hamilton is serviced by a solid mix of national and regional carriers, with access to over 10 providers as of September 2025. The market features three carrier-neutral data centers, providing diverse and resilient connectivity options for enterprise customers.
Direct Cloud On-Ramps: As of September 2025, Hamilton does not have direct public cloud on-ramps. High-speed, low-latency access to all major clouds is achieved via dedicated connections to nearby Toronto, a primary Canadian cloud hub.
Internet Exchange Points (IXPs): Most public and private peering is handled through the Toronto Internet Exchange (TorIX), one of North America's largest IXPs. This ensures efficient traffic routing across Canada and globally.
Bare Metal: Bare metal server options are available, often provisioned from data centers in the greater Toronto area to serve Hamilton workloads. Providers like Hivelocity and phoenixNAP offer dedicated servers with access to the regional network fabric.
Power Analysis
Average Cost Of Power: Industrial power costs in the Hamilton area typically range from C$0.12 to C$0.15/kWh, as of September 2025. This pricing offers a competitive advantage for high-density deployments compared to more expensive North American markets.
Power Grid Reliability: The regional power grid is highly reliable, benefiting from a diverse generation mix of nuclear and hydroelectric power. Data centers in the area are typically supported by redundant feeds and substations to ensure consistent uptime.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers in Hamilton are strategically located to serve the city's strong industrial, manufacturing, and healthcare sectors. Proximity to the Queen Elizabeth Way (QEW) highway provides excellent access to the entire Golden Horseshoe region, including Toronto's financial district.
Regional Market Reach: From Hamilton, businesses can effectively serve the entire Southern Ontario market, a population of over 14 million people. This makes it an excellent location for disaster recovery sites for Toronto-based operations or primary infrastructure for regional businesses.
Tax Advantage For Data Centers: While Canada does not offer widespread, direct tax incentives for data center operation, businesses may qualify for broader federal and provincial programs. The primary financial advantage comes from lower operational costs, including power and real estate, compared to larger metropolitan centers.
Natural Disaster Risk
Hamilton has a low natural disaster risk profile, rated 2.7 out of 10 as of September 2025. The primary environmental considerations are river flooding, with a risk score of 7.1, and earthquakes at 4.8. Other risks such as tropical cyclones and drought are rated as minimal. The location is not exposed to major coastal flooding or tsunami events.