Inflect logo

Mobile Navigation

Mobile Navigation

All Data CentersCanadaCharlottetown

Data Centers in Charlottetown

1 locations found

Data centers map in CharlottetownInteractive map loads on demand to keep the page fast.

Need Help?

Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.

Explore Other Markets in Canada

Charlottetown – Resilient Edge Infrastructure for Atlantic Canada

Executive Summary

Charlottetown serves as the primary edge location for organizations requiring a local presence in Canada’s Maritime provinces. It is a strategic hub for regional service delivery and disaster recovery, ensuring low-latency performance for users in Prince Edward Island. Deploying here provides geographic diversity and reliable uptime for critical Atlantic Canadian workloads.

Charlottetown: At A Glance

FactorRating / DataNotes
Global Connectivity GradeBReliable performance with solid national backhaul.
Direct Cloud On-Ramps0 – as of September 2025Nearest major cloud hubs are in Montreal.
Power Cost$0.12–$0.16 CAD/kWhCompetitive rates for the Maritime region.
Disaster RiskLow (2.7/10)Low overall risk profile as of September 2025.
Tax IncentivesNoNo industry-specific incentives currently active.
Sales Tax15.00% HSTCombined 5% GST and 10% PST.

Network & Connectivity Ecosystem

Carrier Density & Carrier Neutrality: The market supports a focused connectivity ecosystem with a carrier count: under 10 as of September 2025. Service is provided by national telecommunications firms and regional specialists, offering dependable interconnection for edge workloads.

Direct Cloud On-Ramps: 0, enabling access to 0 cloud regions as of September 2025. Local deployments typically use private network interconnects or long-haul transport to reach primary cloud on-ramps in Montreal. This configuration is sufficient for regional applications where sub-millisecond cloud latency is not the primary requirement.

Internet Exchange Points (IXPs): Charlottetown does not host a major public IXP as of September 2025. Local traffic is managed through private peering agreements or routed via the Halifax Internet Exchange (HFXIX) to ensure efficient regional performance.

Bare Metal: High-performance compute options are available through regional providers. Automated bare metal services are generally provided by firms like OVHcloud or Leaseweb from their larger Eastern Canadian facilities as of September 2025.

Power Analysis

Average Cost Of Power: Industrial electricity rates range from $0.12–$0.16 CAD/kWh, as of September 2025. This pricing supports predictable operational budgeting for organizations focused on the Atlantic Canadian market.

Power Grid Reliability: The regional grid is well-engineered, utilizing a mix of local generation and imported power. Facilities benefit from multi-substation support, providing the high availability levels necessary for reliable colocation services.

Market Access, Business & Tax Climate

Proximity To Key Business Districts: Data centers are positioned to serve the Atlantic Technology Centre and the growing technology community in the city core. This location is vital for government, healthcare, and financial services needing rapid physical access to hardware.

Regional Market Reach: A deployment in Charlottetown provides an effective gateway to the 2.4 million people living in Atlantic Canada. It is the logical choice for content delivery and edge computing for Prince Edward Island and the surrounding provinces.

Tax Advantage For Data Centers: The business environment focuses on stability and corporate reliability for digital infrastructure. This predictable climate allows for consistent long-term operational planning without sudden regulatory shifts.

Natural Disaster Risk

Charlottetown maintains an overall risk profile of Low (2.7/10) as of September 2025. While the aggregate risk is minimal, coastal and inland water management are the primary considerations for site planning.

  • River Flood (7.1): This is the primary hazard, requiring specific site selection and elevation strategies, as of September 2025.
  • Tsunami (5.7): As a coastal island location, this represents a regional risk addressed through protective facility design, as of September 2025.
  • Coastal Flood (5.4): Typical for maritime environments, this risk is managed through modern infrastructure and standard protection protocols, as of September 2025.
  • Earthquake (4.8): Seismic risk remains within manageable levels for purpose-built structures, as of September 2025.
WHY CHOOSE US?Helping You Find Connectivity Solutions For Your Business
Inflect logo
Expert SupportGet help from industry pros. Free of charge
Best DealsAccess exclusive deals from top providers.
Seamless ExperienceResearch, compare and purchase, all in one place.
Fast ResponsesGet your questions answered within 24 hours.
Our Partners
EquinixZayoDigital RealtyAT&T BusinessLumenArelion