Data Centers in Newcastle
2 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Australia
Newcastle – Strategic Edge Gateway for Regional Growth
Executive Summary
Newcastle serves as a critical secondary hub for organizations requiring low-latency access to New South Wales without the overhead of the Sydney metropolitan area. This market is a primary choice for edge deployments and disaster recovery sites, ensuring localized performance for the industrial and maritime sectors of the Hunter Valley.
Newcastle: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional backhaul directly to Sydney hubs. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest on-ramps are located in Sydney. |
| Power Cost | AUD 0.14–0.19/kWh – as of September 2025 | Pricing remains competitive for regional Australian markets. |
| Disaster Risk | Low (2.5/10) – as of September 2025 | Environmental risks are manageable with proper site selection. |
| Tax Incentives | No – as of September 2025 | No data center specific tax breaks currently active. |
| Sales Tax | GST 10% – as of September 2025 | Standard Australian Goods and Services Tax applies. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 5. As of September 2025, the market supports between 5 and 10 carriers across its primary facilities. This provides sufficient diversity for redundant routing and competitive transit pricing for regional enterprises.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions. As of September 2025, there are no native on-ramps in the city. High-speed private extensions such as PNI or wave services to Sydney provide the necessary bridge to AWS, Google Cloud (GCP), and Microsoft Azure.
Internet Exchange Points (IXPs): Most peering occurs via major exchanges in Sydney, though local private peering within the Denison Street and McIntosh Drive facilities handles regional traffic efficiently as of September 2025.
Bare Metal: General availability is confirmed through global providers such as Hivelocity and Latitude.sh, supporting automated hardware provisioning for specialized workloads as of September 2025.
Power Analysis
Average Cost Of Power: Industrial electricity is priced between AUD 0.14/kWh and AUD 0.19/kWh as of September 2025. The generation mix relies on coal and gas for 64% of its output, with renewables contributing 36%. This price point supports predictable operational budgeting for regional infrastructure.
Power Grid Reliability: The local grid is supported by a well-engineered network with multi-substation support. Facilities are positioned to leverage the industrial-grade power infrastructure typical of the Hunter region to maintain high uptime.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers in this market are located near the Newcastle CBD and the Port of Newcastle. This proximity is vital for maritime, logistics, and engineering firms that require localized compute for real-time data processing.
Regional Market Reach: Newcastle serves as the gateway to the Hunter Valley and the Central Coast. It provides a reliable service point for a combined population exceeding one million people as of September 2025.
Tax Advantage For Data Centers: The tax environment is stable with a consistent GST application. Businesses benefit from the lack of complex local surcharges, which simplifies financial modeling for infrastructure investments in the region.
Natural Disaster Risk
The overall hazard profile for Newcastle is Low, with a score of 2.5/10 as of September 2025. While the overall risk is minimal, specific natural hazards require consideration during site selection:
- Coastal Flood: 6.2 (Moderate)
- Drought: 6.2 (Moderate)
- Tsunami: 5.7 (Moderate)
- River Flood: 5.4 (Moderate)
- Tropical Cyclone: 4.1 (Low)
Coastal and riverine risks are the primary environmental factors for this market. Modern purpose-built facilities in the region use elevated site designs to manage these specific threats, while other natural hazards are considered minor as of September 2025.