Data Centers in Sunshine Coast
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Australia
Sunshine Coast – Direct Trans-Pacific Connectivity Bypass
The Sunshine Coast serves as a critical alternative landing point for high-capacity subsea cables, offering a direct path to North America and Asia that avoids Sydney congestion. This market is a strong choice for enterprises requiring low-latency trans-Pacific transit and resilient disaster recovery options within Queensland. Utilizing this gateway secures faster data routes and provides a reliable bypass for mission-critical international traffic.
Sunshine Coast: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | International landing point for subsea cables. |
| Direct Cloud On-Ramps | 0 – as of January 2026 | Nearest major on-ramp hub is Brisbane. |
| Power Cost | AUD 0.14–0.19/kWh – as of January 2026 | Competitive industrial rates for the East Coast. |
| Disaster Risk | Low (2.5) – as of January 2026 | Managed coastal exposure with minimal seismic activity. |
| Tax Incentives | No – as of January 2026 | Standard Australian corporate tax structures apply. |
| Sales Tax | 10% GST – as of January 2026 | Standard Australian Goods and Services Tax. |
Network & Connectivity Ecosystem
This market functions as a specialized transit point built for international connectivity. All metrics are accurate as of January 2026.
Carrier Density & Carrier Neutrality: Carrier count: over 5. As of January 2026, the local market operates around a specialized landing station providing access to major global transit providers and essential domestic backhaul options.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions. As of January 2026, no direct on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure exist in the immediate area. Brisbane serves as the primary hub for direct cloud access, reachable via high-speed private waves.
Internet Exchange Points (IXPs): Public peering typically occurs through major exchanges in Brisbane, though the local landing station enables direct private peering for international traffic streams as of January 2026.
Bare Metal: Regional providers offer localized bare metal services, while global platforms like Latitude.sh provide coverage across the broader Australian infrastructure landscape as of January 2026.
Power Analysis
Energy management in the region is defined by a modernizing grid and transparent pricing structures.
Average Cost Of Power: Industrial electricity averages AUD 0.14–0.19/kWh, as of January 2026. The generation mix consists of 36% renewables and 64% fossil fuels, predominantly coal and gas. This pricing is competitive for the East Coast and supports stable operational budgets for high-density deployments.
Power Grid Reliability: The local grid is purpose-built with multi-substation support, ensuring high uptime for the critical infrastructure near the Maroochydore digital precinct as of January 2026.
Market Access, Business & Tax Climate
The region has transitioned from a tourism-heavy economy to a legitimate technology contender.
Proximity To Key Business Districts: Infrastructure is centrally located near the Maroochydore City Center, a modern business district development attracting finance and technology firms as of January 2026.
Regional Market Reach: This site acts as the primary international gateway for Queensland, offering a faster data path to North America than traditional routes through southern Australia as of January 2026.
Tax Advantage For Data Centers: The region operates under a stable Australian regulatory framework that protects long-term infrastructure investments. This predictable environment ensures that capital-intensive deployments remain financially viable without unexpected fiscal shifts as of January 2026.
Natural Disaster Risk
The Sunshine Coast maintains a Low risk profile with a score of 2.5, as of January 2026. While the aggregate risk is minimal, facilities are engineered to handle specific coastal environmental factors.
- Coastal Flood (6.2): This is the primary hazard; however, critical infrastructure is situated on elevated terrain or utilizes specific flood mitigation as of January 2026.
- Drought (6.2): A regional concern that typically influences water cooling strategies rather than physical facility integrity as of January 2026.
- Tsunami (5.7): Managed through early warning systems and inland facility positioning relative to the shoreline as of January 2026.
- River Flood (5.4): Addressed through local catchment planning and facility-specific defenses as of January 2026.
- Tropical Cyclone (4.1): Facilities are constructed to meet building codes for high-wind events as of January 2026.