Data Centers in Geraldton
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Australia
Geraldton – Strategic Edge for the Mid West Resource Sector
Geraldton is the primary edge location for Western Australia’s resource and maritime sectors, providing a resilient secondary site away from Perth. It offers the necessary proximity for low-latency industrial applications while maintaining a secure, low-risk profile for disaster recovery and regional data processing.
Geraldton: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable fiber routes to the Perth hub. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Perth is the nearest primary hub. |
| Power Cost | AUD 0.14–0.19/kWh – as of September 2025 | Competitive rates for regional edge sites. |
| Disaster Risk | Low (2.5) – as of September 2025 | Secure profile for data redundancy. |
| Tax Incentives | No – as of September 2025 | Standard corporate tax schedules apply. |
| Sales Tax | GST 10% – as of September 2025 | Standard Australian Goods and Services Tax. |
Network & Connectivity Ecosystem
Geraldton serves as a vital redundancy point for coastal and inland network traffic in Western Australia.
Carrier Density & Carrier Neutrality: Carrier count: under 10, as of September 2025. The environment is carrier-neutral, providing access to major domestic fiber providers and regional specialists. While the ecosystem is smaller than metropolitan capitals, it provides reliable paths for industrial and maritime requirements.
Direct Cloud On-Ramps: 0, enabling access to 0 cloud regions, as of September 2025. There are no native on-ramps in Geraldton. Local operators provide private network extensions or high-capacity wavelengths to reach the primary Perth hub, which hosts AWS, Google Cloud (GCP), and Microsoft Azure.
Internet Exchange Points (IXPs): Public peering is handled through major exchanges in Perth as of September 2025. Local traffic typically stays within provider networks or utilizes national peering points to maintain performance.
Bare Metal: Regional providers meet high-performance compute needs, with global options like Latitude.sh available through metropolitan gateways as of September 2025.
Power Analysis
Energy stability is a core component of the local infrastructure, supporting consistent industrial demand.
Average Cost Of Power: Industrial electricity: AUD 0.14–0.19/kWh, as of September 2025. The energy mix consists of approximately 64% fossil fuels and 36% renewables, offering a predictable cost structure for edge deployments compared to high-demand urban centers. This pricing supports predictable operational costs for regional infrastructure.
Power Grid Reliability: The grid is well-engineered and integrated into the broader Western Australian energy network. It uses redundant sub-transmission lines and multi-substation support to minimize the risk of large-scale outages as of September 2025.
Market Access, Business & Tax Climate
Geraldton provides a gateway to the resource-rich Mid West region, positioning data assets near high-value industrial sectors.
Proximity To Key Business Districts: Facilities are located near the Geraldton city center and port area as of September 2025. This location is vital for maritime logistics, offshore energy operations, and the satellite communications industry centered in the region.
Regional Market Reach: This site serves a vast area including the Mid West and Gascoyne regions. It is a purpose-built hub for edge computing tasks that process data for remote mine sites and agricultural operations as of September 2025.
Tax Advantage For Data Centers: Investments follow standard Australian corporate tax and depreciation schedules. Organizations can leverage nationwide R&D tax offsets for qualifying innovative infrastructure projects.
Natural Disaster Risk
Geraldton maintains a favorable risk profile with an overall score of Low (2.5/10) as of September 2025. While environmental factors are present, the infrastructure is built to regional resilience standards.
The most significant natural hazards include:
- Coastal Flood: 6.2/10 (Indirect/Regional)
- Drought: 6.2/10
- Tsunami: 5.7/10 (Indirect/Regional)
- River Flood: 5.4/10
- Tropical Cyclone: 4.1/10
Given its coastal location, tsunami and coastal flooding risks are monitored, though they are considered indirect for reinforced facilities as of September 2025. Other risks, such as seismic activity, are negligible.