Data Centers in Bujumbura
2 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Bujumbura – Digital Entry Point to the Great Lakes
Executive Summary
Bujumbura serves as the primary gateway for enterprises targeting Burundi and the expanding Great Lakes market. Establishing a presence here ensures local data residency and the low latency necessary for banking and telecommunications services. The city offers a unique advantage through an energy profile that is almost entirely renewable.
Bujumbura: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional fiber links to East African hubs. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nairobi serves as the nearest primary on-ramp hub. |
| Power Cost | $0.09 – $0.14/kWh | Competitive rates with 99% renewable generation. |
| Disaster Risk | High (5.9/10) | Profile driven by health and seismic factors. |
| Tax Incentives | No | No specific sector-wide financial incentives. |
| Sales Tax | 18.00% VAT | Standard national rate as of September 2025. |
Network & Connectivity Ecosystem
The connectivity landscape in Bujumbura is maturing, driven by investments in regional fiber backbones that link the city to coastal landing stations.
Carrier Density & Carrier Neutrality: Carrier count: over 5. Facilities in the city provide access to a mix of national providers and regional fiber operators. This ecosystem supports reliable multi-homed networking as of September 2025.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions. There are no direct on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure within the city limits as of September 2025. Traffic typically routes to Nairobi, Kenya, via private leased lines or carrier waves to reach major cloud zones.
Internet Exchange Points (IXPs): The Burundi Internet Exchange (BDIXP) operates in Bujumbura. This facility allows local service providers to swap traffic directly to reduce latency and transit costs as of September 2025.
Bare Metal: Server resources are available through regional providers. Global options such as OVHcloud or Leaseweb serve the market through international points of presence as of September 2025.
Power Analysis
Energy in Bujumbura is characterized by a high commitment to sustainability, though grid expansion remains a priority for the local utility.
Average Cost Of Power: Industrial electricity is estimated between $0.09 – $0.14/kWh, as of September 2025. This pricing is competitive within the East African region, offering a cost-effective base for hardware operations.
Power Grid Reliability: The local grid is supported by a generation mix that is roughly 99% renewable as of September 2025. Major data center corridors utilize redundant feeds and onsite backup systems to maintain steady operations during grid maintenance.
Market Access, Business & Tax Climate
Bujumbura is the commercial core of Burundi, making it the logical choice for localized digital services.
Proximity To Key Business Districts: Data centers are centrally located near the central business district and government offices. This proximity is essential for serving the banking, NGO, and public sectors that require fast access to hosted applications.
Regional Market Reach: A presence in Bujumbura provides a staging ground for reaching over 12 million people in Burundi. It also facilitates cross-border digital trade with the Democratic Republic of the Congo and Rwanda.
Tax Advantage For Data Centers: While there are no specific tax breaks for the sector, the standard regulatory environment provides a predictable framework for business. Local operations benefit from a simplified VAT structure that applies to all industrial technology services as of September 2025.
Natural Disaster Risk
Bujumbura carries a High (5.9/10) risk rating based on regional hazard data as of September 2025. Facility operators account for these environmental factors in their site selection and engineering.
Epidemic: 6.7 – High risk profile impacting operational continuity and workforce availability as of September 2025.
Earthquake: 4.5 – Moderate risk due to proximity to the East African Rift system as of September 2025.
Drought: 3.9 – Moderate risk that may indirectly affect hydroelectric power generation levels as of September 2025.
River Flood: 2.6 – Lower risk, primarily affecting low-lying areas near Lake Tanganyika as of September 2025.
Other natural hazards, such as tropical cyclones or tsunamis, are not material risks for this inland location. All hazard metrics are provided as of September 2025.