Data Centers in Burundi
2 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Markets in Burundi
Burundi – Strategic Gateway to the Great Lakes Region
Burundi: Essential Infrastructure for Emerging Markets
Burundi serves as a pivotal entry point for organizations targeting the underserved Great Lakes region of Africa. Placing infrastructure here provides a strategic foothold in a high growth corridor while utilizing one of the cleanest power grids on the continent. This location is a strong choice for businesses prioritizing sustainable energy and regional expansion into neighboring land-linked markets.
Burundi: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Growing regional fiber capacity via backbone systems. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nairobi serves as the nearest regional hub. |
| Power Cost | $0.11/kWh – as of September 2025 | Competitive rates from nearly 100% renewable sources. |
| Disaster Risk | High (5.9/10) – as of September 2025 | Driven by seismic activity and hydrological variables. |
| Tax Incentives | No | No specific holidays for data center operations. |
| Sales Tax | 18.00% VAT – as of September 2025 | Standard national value-added tax applies. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 5, as of September 2025. The local infrastructure is anchored by the Burundi Backbone System. While the market is still maturing, carrier neutral options are established in Bujumbura to support diverse routing for regional traffic.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions, as of September 2025. No hyperscale on-ramps exist locally at this time. Connectivity to platforms such as AWS or Microsoft Azure requires private extensions or peering through the nearest regional hub in Nairobi.
Internet Exchange Points (IXPs): The Burundi Internet Exchange (BIX) serves as the central hub for domestic traffic, ensuring local data stays local to reduce latency and transit costs as of September 2025.
Bare Metal: Local bare metal availability is specific rather than a broad commodity. Specialized providers such as Hivelocity or Latitude.sh generally service this region via remote nodes or specific enterprise deployments for regional requirements as of September 2025.
Power Analysis
Average Cost Of Power: Industrial electricity is approximately $0.11/kWh, as of September 2025. This pricing is competitive within the East African Community, especially given a generation mix that is nearly 99% renewable. This reliance on hydroelectric power simplifies green energy reporting for multinational firms.
Power Grid Reliability: The grid in major commercial zones is well-engineered and reliable, though site-level redundancy remains a standard requirement. Data centers here utilize multi-substation support to manage local distribution variables and ensure high uptime for critical workloads as of September 2025.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Facilities are centrally located near the Bujumbura central business district as of September 2025. This provides immediate access to the banking, telecommunications, and government sectors that drive the country's digital consumption.
Regional Market Reach: Burundi is a land-linked hub that effectively serves the eastern Democratic Republic of Congo and western Tanzania. This makes it a smart choice for content caching and regional service delivery to millions of users as of September 2025.
Tax Advantage For Data Centers: There are no specific tax holidays for data center operations at this time. Operating here allows companies to avoid the higher overheads associated with more saturated regional markets while establishing a footprint in an emerging economy.
Natural Disaster Risk
Burundi carries a High (5.9/10) risk profile as of September 2025. The risk is concentrated in specific categories that require resilient facility engineering and careful site selection.
- Earthquake: 4.5
- Drought: 3.9
- River Flood: 2.6
Other natural hazards are minor. Because Burundi is an inland nation, coastal flood and tsunami risks are not applicable to local infrastructure planning. Facilities must prioritize seismic-rated construction and elevated critical systems to manage these documented geological and hydrological risks as of September 2025.