Data Centers in Watford
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in United Kingdom
- London 207
- Manchester 28
- Leeds 17
- Reading 11
- Newcastle 10
- Bristol 7
- Birmingham 6
- Fareham 6
- Leicester 5
- Liverpool 5
- Milton Keynes 5
- Crawley 4
- Hemel Hempstead 4
- Telford 4
- Wolverhampton 4
- Belfast 3
- Brighton 3
- Cardiff 3
- Coventry 3
- Edinburgh 3
- Northampton 3
- Nottingham 3
- Sheffield 3
- Aberdeen 2
- Basildon 2
- Cheltenham 2
- Chester 2
- Derby 2
- Glasgow 2
- Gloucester 2
- Harlow 2
- High Wycombe 2
- Portsmouth 2
- Southampton 2
- Stevenage 2
- Bath 1
- Bournemouth 1
- Chelmsford 1
- Colchester 1
- Dundee 1
- Exeter 1
- Hadley 1
- Maidstone 1
- Oxford 1
- Poole 1
- Reigate and Banstead 1
- Rugby 1
- Sevenoaks 1
- Test Valley 1
- York 1
Watford – Strategic Low-Latency Access to London
Executive Summary
Watford serves as a vital secondary market for enterprises requiring high-speed access to London without the congestion and costs of the central city. This location provides a resilient foundation for mission-critical infrastructure, ensuring uptime and security for high-stakes financial and technology operations.
Watford: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Strong regional links to major European internet exchanges. |
| Direct Cloud On-Ramps | 0 — as of September 2025 | Primary cloud access is managed via private extensions to London. |
| Power Cost | £0.17/kWh — as of September 2025 | Grid mix includes 40–50% renewables and significant nuclear capacity. |
| Disaster Risk | Low (2.1/10) — as of September 2025 | Overall risk is minimal with very low seismic activity. |
| Tax Incentives | No — as of September 2025 | No specific local incentives currently active for data center builds. |
| Sales Tax | 20% VAT — as of September 2025 | Standard UK value-added tax applies to most services. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 10. As of September 2025, the market supports ~10–15 carriers, providing a competitive environment for diverse fiber routing and carrier-neutral colocation options.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions. As of September 2025, no direct on-ramps are physically located in Watford. Connectivity to major providers is established via private network interconnects (PNI) or high-capacity waves to London hubs, typically reachable in under one millisecond.
Internet Exchange Points (IXPs): Peering is primarily handled through the London Internet Exchange (LINX) and LONAP, ensuring efficient traffic exchange for the region. Most localized traffic utilizes private peering or national transit routes.
Bare Metal: Resilient bare metal services are available for as of September 2025 through global providers such as Hivelocity and Latitude.sh, supporting rapid deployment for compute-heavy workloads.
Power Analysis
Average Cost Of Power: As of September 2025, industrial electricity rates are approximately £0.17/kWh. This pricing remains competitive within the UK market, allowing for stable operational forecasting.
Power Grid Reliability: The local grid is well-engineered with redundant supply paths and multi-substation support. This infrastructure ensures a reliable flow of energy for high-density deployments in major industrial corridors.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers in Watford are strategically positioned for firms in the pharmaceutical, media, and financial services sectors. This proximity allows for high-speed data transfer to London headquarters while maintaining a physical footprint outside the primary metropolitan zone.
Regional Market Reach: This location effectively serves the Greater London area and the South East of England. Its position on the M1 corridor makes it a natural gateway for traffic moving between London and the industrial Midlands.
Tax Advantage For Data Centers: The United Kingdom provides a stable corporate tax environment with capital allowances available for significant infrastructure investments. These provisions help businesses manage the total cost of ownership for hardware and facility upgrades over time.
Natural Disaster Risk
Watford maintains a Low (2.1/10) risk profile as of September 2025. The region is characterized by high geological stability and a controlled environmental landscape.
- River Flood: 5.7 (as of September 2025). This is the primary local concern, though facility placement typically mitigates this risk.
- Epidemic: 2.4 (as of September 2025).
- Drought: 1.6 (as of September 2025).
- Earthquake: 0.1 (as of September 2025). Seismic activity is negligible.
Other natural hazards like tropical cyclones are not listed or are considered minor for this geography. Coastal flood and tsunami risks are considered indirect regional exposures and do not materially impact local site selection.