Data Centers in Reigate and Banstead
0 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in United Kingdom
- London 207
- Manchester 28
- Leeds 17
- Reading 11
- Newcastle 10
- Bristol 7
- Birmingham 6
- Fareham 6
- Leicester 5
- Liverpool 5
- Milton Keynes 5
- Crawley 4
- Hemel Hempstead 4
- Telford 4
- Wolverhampton 4
- Belfast 3
- Brighton 3
- Cardiff 3
- Coventry 3
- Edinburgh 3
- Northampton 3
- Nottingham 3
- Sheffield 3
- Aberdeen 2
- Basildon 2
- Cheltenham 2
- Chester 2
- Derby 2
- Glasgow 2
- Gloucester 2
- Harlow 2
- High Wycombe 2
- Portsmouth 2
- Southampton 2
- Stevenage 2
- Bath 1
- Bournemouth 1
- Chelmsford 1
- Colchester 1
- Dundee 1
- Exeter 1
- Hadley 1
- Maidstone 1
- Oxford 1
- Poole 1
- Rugby 1
- Sevenoaks 1
- Test Valley 1
- Watford 1
- York 1
Reigate and Banstead – Strategic Southern Access to London
Executive Summary
This market serves enterprises that require immediate proximity to the capital without the congestion or physical security constraints of central London. It is a vital location for organizations prioritizing high-speed motorway access and low-latency connections to the UK financial core while maintaining a distinct geographic footprint for disaster recovery.
Reigate and Banstead: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional access for South East England. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest major on-ramp hub is London. |
| Power Cost | £0.17/kWh – as of September 2025 | In line with standard UK industrial rates. |
| Disaster Risk | Low (2.1/10) – as of September 2025 | Highly stable geological profile. |
| Tax Incentives | No – as of September 2025 | Standard UK commercial terms apply. |
| Sales Tax | 20% VAT – as of September 2025 | Standard national rate. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 5, as of September 2025. The area features a mix of regional fiber providers and national backbones. Neutrality remains standard here, allowing operators to choose transit providers based on performance and cost rather than being locked into a single ecosystem.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions, as of September 2025. While no native on-ramps sit within the district, the proximity to London allows for low-latency private extensions. Wave services and dedicated fiber paths to major cloud hubs are common for local deployments.
Internet Exchange Points (IXPs): Most traffic is routed through the London Internet Exchange (LINX), as of September 2025. This ensures that regional traffic stays local and reaches the national backbone with minimal hops, maintaining the speed required for modern corporate applications.
Bare Metal: Dedicated hardware is available for rapid deployment through providers like Leaseweb or OVHcloud, as of September 2025. These options are ideal for businesses that need to scale local compute resources without the long lead times of traditional colocation.
Power Analysis
Average Cost Of Power: Industrial electricity is approximately £0.17/kWh, as of September 2025. The UK grid mix includes 40–50% renewables, 35–45% fossil fuels, and 10–15% nuclear. This pricing provides a predictable cost base for infrastructure managers moving workloads out of higher-priced urban zones.
Power Grid Reliability: The local grid is well-engineered and benefits from the redundant infrastructure serving the Surrey and Greater London corridors. Multi-substation support is typical for data center facilities in this area, ensuring high availability for critical operations.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Facilities here are positioned near Gatwick Airport and the M25 motorway. This location is a primary choice for the insurance, aerospace, and logistics sectors that require reliable infrastructure within an hour of the City of London.
Regional Market Reach: This location serves the affluent South East of England and acts as a secondary site for London-based firms. It provides a bridge between the tech hubs on the South Coast and the financial markets of the capital.
Tax Advantage For Data Centers: The United Kingdom offers a stable regulatory environment for infrastructure investment. This predictability assists in long-term financial planning and ensures that capital investments are protected by clear commercial laws.
Natural Disaster Risk
Overall Score: Low (2.1/10), as of September 2025. The region is geologically stable and faces very few threats to physical infrastructure.
- River Flood: 5.7 (Moderate risk; localized to specific floodplains).
- Epidemic: 2.4 (Low risk).
- Drought: 1.6 (Low risk).
- Earthquake: 0.1 (Negligible risk).
Note: Coastal flood and Tsunami risks are regional and considered indirect due to the inland location of this district. Other natural hazards are minor or not listed.