Data Centers in Northampton
3 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in United Kingdom
- London 197
- Manchester 28
- Leeds 18
- Reading 11
- Newcastle 10
- Bristol 8
- Birmingham 7
- Liverpool 6
- Fareham 6
- Leicester 5
- Milton Keynes 5
- Telford 4
- Edinburgh 4
- Crawley 4
- Wolverhampton 4
- Brighton 3
- Maidstone 3
- Glasgow 3
- Belfast 3
- Portsmouth 3
- Nottingham 3
- Sheffield 3
- Coventry 3
- Cardiff 3
- Aberdeen 2
- Southampton 2
- Harlow 2
- Stevenage 2
- Chester 2
- Derby 2
- Cheltenham 2
- High Wycombe 2
- Greater London 2
- Gloucester 2
- Dundee 1
- York 1
- Basildon 1
- Bournemouth 1
- Chelmsford 1
- Poole 1
- Watford 1
- Sevenoaks 1
- Hadley 1
- Oxford 1
- Hemel Hempstead 1
- Southborough 1
- Reigate and Banstead 1
- Rugby 1
- Colchester 1
- Exeter 1
- Dover 1
- Feltham 1
- Greater Manchester 1
- Newcastle Upon Tyne 1
- Warrington 1
- Test Valley 1
- Bath 1
Northampton, United Kingdom – Strategic & Cost-Effective UK Hub
Northampton offers a compelling alternative to the congested London market for businesses prioritizing cost efficiency and operational stability. Its strategic location provides low-latency access to the UK's primary economic centers while benefiting from a significantly lower risk profile, ensuring resilient uptime for critical applications.
Northampton, United Kingdom: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Solid connectivity, though less dense than primary hubs like London. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | The nearest major on-ramp hub is London; private network extensions are available. |
| Power Cost | ≈£0.17/kWh – as of September 2025 | Competitive industrial power rates offer significant operational cost savings. |
| Disaster Risk | Very Low (2.1/10) – as of September 2025 | Minimal exposure to significant natural disasters, enhancing operational reliability. |
| Tax Incentives | No – as of September 2025 | The UK currently offers no specific tax incentives for data center development. |
| Sales Tax | 20% VAT – as of September 2025 | The standard UK Value Added Tax applies to equipment and services. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: As of September 2025, Northampton's data centers are served by over 10 network carriers. The facilities offer carrier-neutral environments, providing diverse connectivity options without vendor lock-in.
Direct Cloud On-Ramps: There are no direct public cloud on-ramps within Northampton as of September 2025. Businesses connect to cloud providers like AWS, Google Cloud (GCP), and Microsoft Azure via dedicated private network links to the nearest major hub, London.
Internet Exchange Points (IXPs): Public peering is limited within Northampton itself. Most network operators establish private peering arrangements or connect to London's primary internet exchanges, such as LINX, for traffic exchange.
Bare Metal: Bare metal server solutions are readily available from providers. Options include services from global suppliers like Hivelocity and phoenixNAP, which can be deployed in regional data centers.
Power Analysis
Average Cost Of Power: Industrial electricity costs in the Northampton region are approximately £0.17/kWh as of September 2025. This competitive pricing structure presents a clear advantage for reducing the total cost of ownership for high-density compute deployments compared to more expensive European markets. The UK's energy mix is diverse, with renewables contributing ~40–50%, fossil fuels ~35–45%, and nuclear power ~10–15%.
Power Grid Reliability: The power grid serving Northampton's key industrial and data center zones is well-engineered and stable. Facilities are typically supported by redundant power feeds from multiple grid substations, ensuring high levels of uptime for mission-critical infrastructure.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Northampton's data centers are strategically located within the UK's "Midlands Engine" region, a hub for logistics, manufacturing, and technology. This proximity offers low-latency connectivity to businesses in Birmingham, Leicester, and Milton Keynes.
Regional Market Reach: The market effectively serves as a national distribution and disaster recovery hub. It provides excellent reach to over 80% of the UK population within a four-hour drive, making it ideal for content delivery and application hosting.
Tax Advantage For Data Centers: The United Kingdom does not currently offer specific tax incentives for data center investment or operations. The primary financial advantage comes from lower operational costs related to power and real estate, not from government tax relief programs.
Natural Disaster Risk
The United Kingdom has a Very Low overall natural disaster risk profile, with a score of 2.1 out of 10 as of September 2025. Northampton's inland location further insulates it from specific coastal threats, making it an exceptionally stable environment for data center operations.
Key environmental risks are minimal and include:
- Coastal Flood: 8.3/10 (A national-level risk with no direct impact on inland Northampton)
- River Flood: 5.7/10
- Drought: 1.6/10
- Earthquake: 0.1/10