Data Centers in Exeter
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in United Kingdom
- London 210
- Manchester 29
- Leeds 18
- Reading 11
- Newcastle 10
- Bristol 8
- Birmingham 7
- Liverpool 6
- Fareham 6
- Leicester 5
- Milton Keynes 5
- Telford 4
- Edinburgh 4
- Crawley 4
- Wolverhampton 4
- Belfast 3
- Brighton 3
- Sheffield 3
- Glasgow 3
- Nottingham 3
- Northampton 3
- Maidstone 3
- Coventry 3
- Cardiff 3
- Portsmouth 3
- Chester 2
- Basildon 2
- High Wycombe 2
- Southampton 2
- Gloucester 2
- Aberdeen 2
- Derby 2
- Stevenage 2
- Harlow 2
- Cheltenham 2
- Dundee 1
- York 1
- Bournemouth 1
- Chelmsford 1
- Poole 1
- Watford 1
- Sevenoaks 1
- Hadley 1
- Oxford 1
- Hemel Hempstead 1
- Cambridge 1
- Reigate and Banstead 1
- Rugby 1
- Colchester 1
- Dover 1
- Feltham 1
- Newcastle Upon Tyne 1
- Warrington 1
- Test Valley 1
- Bath 1
Exeter – Resilient UK Edge Connectivity
Executive Summary
Exeter provides a strategic data center location for businesses targeting Southwest England or requiring a UK disaster recovery site outside the primary London market. This emerging edge location offers a resilient, low-risk environment, ensuring lower latency delivery to the region and reducing dependency on the capital. Exeter is ideal for organizations prioritizing uptime and regional performance over hyper-dense connectivity.
Exeter: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Solid regional connectivity, less dense than major UK hubs like London. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Direct access is available via private network extension to London hubs. |
| Power Cost | £0.17/kWh – as of September 2025 | Competitive pricing for a UK regional market with a strong renewables mix. |
| Disaster Risk | Low (2.1/10) – as of September 2025 | Very low overall risk profile from natural hazards. |
| Tax Incentives | No | The UK government does not offer specific data center tax incentives. |
| Sales Tax | 20% VAT – as of September 2025 | Standard UK Value Added Tax applies to most goods and services. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: As a regional hub, Exeter offers access to a focused group of national and regional carriers, with an estimated 10-20 providers available in key facilities as of September 2025. Carrier-neutral facilities provide the primary interconnection points.
Direct Cloud On-Ramps: There are no public cloud on-ramps located directly within Exeter as of September 2025. Businesses connect to cloud providers like AWS, Google Cloud (GCP), and Microsoft Azure through dedicated private network links to data centers in London.
Internet Exchange Points (IXPs): Public peering is not established in Exeter. Most network peering is handled privately or routed through major London-based exchanges like LINX and LONAP.
Bare Metal: Bare metal server options are available, typically through providers that service UK regional markets. Providers like IONOS and OVHcloud can offer dedicated server solutions in the UK.
Power Analysis
Average Cost Of Power: Industrial power costs in the Exeter region average around £0.17/kWh as of September 2025. This competitive rate supports predictable operational expenses for compute-heavy workloads. The UK grid mix includes approximately 40–50% renewables, enhancing sustainability profiles.
Power Grid Reliability: The UK's National Grid provides highly reliable power. Data centers in the area are supported by a well-engineered grid, with most facilities offering multi-substation redundancy and N+1 or 2N UPS configurations to ensure uptime.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers in Exeter serve the city's key industries, including the University of Exeter, the Met Office, and a growing cluster of tech and environmental science firms. This proximity provides low-latency connectivity for regional research, public sector, and commercial operations.
Regional Market Reach: Exeter is perfectly positioned to serve as a digital hub for the entire Southwest Peninsula, including Devon, Cornwall, Somerset, and Dorset. It offers significantly reduced latency to end-users in this region compared to facilities in London or Manchester.
Tax Advantage For Data Centers: While the UK does not offer direct tax breaks for data center development, it maintains a stable and transparent corporate tax system. This predictability in tax law is beneficial for long-term investments and financial planning.
Natural Disaster Risk
Exeter has a very low natural disaster risk profile, with an INFORM Risk score of 2.1 out of 10 as of September 2025. This makes it a secure location for critical infrastructure and disaster recovery sites.
While the overall risk is minimal, the primary environmental considerations for the region include:
- Coastal Flood: The Southwest Peninsula has significant coastal exposure, though specific data center sites are typically located to mitigate this direct risk.
- River Flood: Proximity to the River Exe presents a localized flood risk in certain areas.
- Drought: A minor consideration with occasional water-use restrictions during dry periods.
Risks from earthquakes and tropical cyclones are negligible.