Data Centers in Coventry
3 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in United Kingdom
- London 207
- Manchester 28
- Leeds 17
- Reading 11
- Newcastle 10
- Bristol 7
- Birmingham 6
- Fareham 6
- Leicester 5
- Liverpool 5
- Milton Keynes 5
- Crawley 4
- Hemel Hempstead 4
- Telford 4
- Wolverhampton 4
- Belfast 3
- Brighton 3
- Cardiff 3
- Edinburgh 3
- Northampton 3
- Nottingham 3
- Sheffield 3
- Aberdeen 2
- Basildon 2
- Cheltenham 2
- Chester 2
- Derby 2
- Glasgow 2
- Gloucester 2
- Harlow 2
- High Wycombe 2
- Portsmouth 2
- Southampton 2
- Stevenage 2
- Bath 1
- Bournemouth 1
- Chelmsford 1
- Colchester 1
- Dundee 1
- Exeter 1
- Hadley 1
- Maidstone 1
- Oxford 1
- Poole 1
- Reigate and Banstead 1
- Rugby 1
- Sevenoaks 1
- Test Valley 1
- Watford 1
- York 1
Coventry – Strategic Resiliency for the West Midlands
Executive Summary
Coventry provides a stable, low-latency alternative to London for organizations requiring industrial-grade proximity. It serves as a vital edge location for the UK automotive and manufacturing hub, ensuring high uptime for regional workloads.
Coventry: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional performance with diverse fiber routes. |
| Direct Cloud On-Ramps | 0 – as of December 2025 | Access via private extension to London hubs. |
| Power Cost | £0.17/kWh – as of December 2025 | Aligns with UK industrial averages for high-demand users. |
| Disaster Risk | Low (2.1/10) – as of December 2025 | Minimal exposure to natural hazards in this inland market. |
| Tax Incentives | No – as of December 2025 | Standard UK corporate tax framework applies. |
| Sales Tax | 20% VAT – as of December 2025 | Standard UK value added tax rate for services. |
Network & Connectivity Ecosystem
Coventry operates as a strategic spoke to the London connectivity hub, offering reliable backhaul to major European peering points.
Carrier Density & Carrier Neutrality: Carrier count: over 10 as of December 2025. Facilities in the area maintain a carrier-neutral environment, supporting a mix of national Tier 1 providers and regional fiber specialists.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions as of December 2025. While direct physical on-ramps are not present locally, the market relies on high-speed private interconnects to London for access to major global providers.
Internet Exchange Points (IXPs): Local traffic typically flows through the London Internet Exchange (LINX) or LONAP via dedicated transport links, ensuring efficient regional peering.
Bare Metal: General availability of bare metal services is supported by providers such as OVHcloud and Leaseweb, offering elastic compute options without hardware management overhead.
Power Analysis
Power in the Coventry market is characterized by a diversifying grid and stable industrial supply suited for high-uptime requirements.
Average Cost Of Power: Industrial electricity: £0.17/kWh, as of December 2025. The generation mix consists of approximately 40–50% renewables, 35–45% fossil fuels (primarily gas), and 10–15% nuclear. This pricing ensures competitive operating costs for regional edge deployments compared to high-density metros.
Power Grid Reliability: The local grid is reliable, supported by multi-substation feeds and modern distribution infrastructure common in the UK industrial heartland.
Market Access, Business & Tax Climate
Coventry serves as a vital bridge between the London financial center and the northern industrial corridors.
Proximity To Key Business Districts: Data centers are located near major automotive and aerospace headquarters, including Jaguar Land Rover and associated supply chain partners. This proximity reduces latency for industrial IoT and smart manufacturing applications.
Regional Market Reach: This location effectively serves the entire West Midlands, providing a service population of millions within a 5-millisecond round-trip time.
Tax Advantage For Data Centers: While no specific data center tax breaks exist, companies benefit from the UK capital allowance regime for plant and machinery. This structure allows businesses to offset infrastructure investments against taxable profits to improve long-term ROI.
Natural Disaster Risk
The Coventry market carries an overall risk score of 2.1, classified as Low as of December 2025. This makes it a primary site for disaster recovery and long-term data residency.
- River Flood (5.7): This represents the primary natural hazard, requiring specific site selection and facility hardening in low-lying areas.
- Epidemic (2.4): A moderate concern reflecting national public health trends.
- Drought (1.6): A minor risk with limited impact on cooling operations.
- Earthquake (0.1): Seismic activity is negligible and does not impact structural requirements.
Due to its inland location, coastal flooding and tsunami risks are not material to Coventry infrastructure. Other hazards such as tropical cyclones are not present in this geography.