Data Centers in Bath
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in United Kingdom
- London 197
- Manchester 28
- Leeds 18
- Reading 11
- Newcastle 10
- Bristol 8
- Birmingham 7
- Liverpool 6
- Fareham 6
- Leicester 5
- Milton Keynes 5
- Telford 4
- Edinburgh 4
- Crawley 4
- Wolverhampton 4
- Brighton 3
- Maidstone 3
- Glasgow 3
- Belfast 3
- Portsmouth 3
- Nottingham 3
- Northampton 3
- Sheffield 3
- Coventry 3
- Cardiff 3
- Aberdeen 2
- Southampton 2
- Harlow 2
- Stevenage 2
- Chester 2
- Derby 2
- Cheltenham 2
- High Wycombe 2
- Greater London 2
- Gloucester 2
- Dundee 1
- York 1
- Basildon 1
- Bournemouth 1
- Chelmsford 1
- Poole 1
- Watford 1
- Sevenoaks 1
- Hadley 1
- Oxford 1
- Hemel Hempstead 1
- Southborough 1
- Reigate and Banstead 1
- Rugby 1
- Colchester 1
- Exeter 1
- Dover 1
- Feltham 1
- Greater Manchester 1
- Newcastle Upon Tyne 1
- Warrington 1
- Test Valley 1
Bath – Stable UK Edge & Secondary Market Hub
Bath serves as a strategic secondary data center market in the United Kingdom, ideal for organizations requiring resilient infrastructure outside the primary London metro. It provides a stable operational environment for disaster recovery, regional service delivery, and workloads that benefit from proximity to South West England's growing technology and aerospace sectors. This location ensures high uptime and reliability while avoiding the cost and concentration risks of larger hubs.
Bath: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable connectivity, primarily serving regional and national traffic. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Connect via London or Bristol hubs; private network extensions are available. |
| Power Cost | ≈£0.17/kWh – as of September 2025 | In line with national averages, offering predictable operational expenses. |
| Disaster Risk | Low (2.1/10) – as of September 2025 | Minimal exposure to significant natural hazards ensures high operational stability. |
| Tax Incentives | No | No specific data center tax incentives are currently in place. |
| Sales Tax | 20% VAT – as of September 2025 | Standard UK Value Added Tax applies to services. |
Network & Connectivity Ecosystem
Bath's connectivity is solid for a market of its size, though it relies on larger hubs for global access. The infrastructure is well-suited for regional enterprise and disaster recovery deployments.
Carrier Density & Carrier Neutrality: Carrier availability is focused, with access to major UK national providers. As of September 2025, the market is served by a select number of carriers, making carrier-neutral facilities essential for choice and resiliency.
Direct Cloud On-Ramps: There are no direct public cloud on-ramps within Bath as of September 2025. Businesses connect to cloud providers like AWS, Google Cloud (GCP), and Microsoft Azure via dedicated network links to the nearest major interconnection hubs in Bristol and London.
Internet Exchange Points (IXPs): Public peering is not a feature of the Bath market. Most network peering is conducted privately or through regional and national exchanges located in Bristol and London.
Bare Metal: Bare metal server options are available, typically through providers that have a presence in nearby Bristol or offer services across the UK. Providers like Hivelocity and Leasebare metal solutions for performance-intensive workloads.
Power Analysis
The United Kingdom's power infrastructure is both reliable and undergoing a significant transition towards renewable sources, benefiting data centers in Bath.
Average Cost Of Power: Industrial power costs are approximately £0.17/kWh as of September 2025. This pricing is consistent with the national UK market, allowing for predictable and stable operational budgets. The power mix is increasingly green, with renewables generating 40–50% of the UK's electricity.
Power Grid Reliability: The national grid is well-engineered and provides reliable power. Data center operators in the region leverage this stability, often with multi-substation support and redundant connections to ensure consistent uptime for critical infrastructure.
Market Access, Business & Tax Climate
Bath's location in South West England offers a unique combination of a stable business environment and access to key regional economic centers.
Proximity To Key Business Districts: The market serves the city of Bath and provides low-latency connectivity to the larger commercial and technology hub of Bristol. This proximity is ideal for supporting businesses in the aerospace, creative industries, and technology sectors concentrated in the region.
Regional Market Reach: A data center in Bath can effectively serve the entirety of South West England and Wales. It acts as an excellent secondary or disaster recovery site for operations based in London, located approximately 100 miles away.
Tax Advantage For Data Centers: The United Kingdom does not offer specific tax incentives for data center construction or operation. The primary financial advantage comes from operating in a stable, predictable, and globally recognized economic environment.
Natural Disaster Risk
Bath has a very low natural disaster risk profile, making it a secure location for critical data infrastructure.
The overall INFORM risk score is 2.1 out of 10, classifying the area as "Very Low" risk as of September 2025. The primary natural hazards to consider are related to weather and flooding, though their risk scores remain low.
- Coastal Flood: 8.3 (National UK figure; risk in Bath itself is negligible)
- River Flood: 5.7
- Epidemic: 2.4
- Drought: 1.6