Data Centers in Mykolaiv
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Ukraine
Mykolaiv – Strategic Edge Gateway for Southern Ukraine
Executive Summary
Mykolaiv is a critical edge location for organizations managing maritime, industrial, and logistics operations near the Black Sea. This market provides the necessary proximity for low-latency processing required by high-stakes shipbuilding and trade hubs. Establishing presence here ensures resilient regional connectivity and localized speed for southern manufacturing workloads.
Mykolaiv: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable links to Kyiv and Warsaw. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest on-ramps are located in Kyiv or Warsaw. |
| Power Cost | $0.12/kWh, as of September 2025 | Stable mix led by nuclear generation. |
| Disaster Risk | High (5.6/10), as of September 2025 | Score influenced by river and coastal flood risk. |
| Tax Incentives | No | No specialized financial incentives for data centers. |
| Sales Tax | 20% VAT, as of September 2025 | Standard national value-added tax rate applies. |
Network & Connectivity Ecosystem
Mykolaiv serves as a vital connectivity node within the national framework, supporting the data transfer requirements of major industrial players. As of September 2025, the ecosystem provides stable infrastructure for regional edge computing.
Carrier Density & Carrier Neutrality: Carrier count: over 15. This includes a mix of national backbones and regional fiber operators, as of September 2025. Local facilities generally offer a neutral environment for interconnecting with domestic and international networks.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions. There are no direct on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure within Mykolaiv as of September 2025. Connectivity to these platforms is typically managed through private transport to hubs in Kyiv or via international gateways in Poland.
Internet Exchange Points (IXPs): Local traffic is frequently aggregated through major exchanges in Kyiv, such as DTEL-IX, to ensure efficient peering and reduced latency for international data flow.
Bare Metal: Dedicated server and bare metal options are accessible through regional providers and European players like OVHcloud or Leaseweb as of September 2025.
Power Analysis
The power infrastructure in Mykolaiv is integrated into a grid designed for heavy industrial use, providing a predictable environment for compute operations.
Average Cost Of Power: Industrial electricity is approximately $0.12/kWh, as of September 2025. The generation mix consists of roughly 50–55% nuclear and 35–40% fossil fuels, providing a cost-effective base for regional workloads.
Power Grid Reliability: The grid uses a well-engineered, redundant architecture with multi-substation support. Local data center operators maintain purpose-built on-site backup systems to ensure continuous uptime during grid maintenance.
Market Access, Business & Tax Climate
Mykolaiv represents a concentrated industrial market with significant potential for logistics and manufacturing infrastructure.
Proximity To Key Business Districts: Infrastructure is positioned to support the shipbuilding, grain export, and logistics sectors centered around the Mykolaiv port system. Real-time data processing in this location is vital for modern supply chain management.
Regional Market Reach: A presence in Mykolaiv effectively covers the southern population centers, specifically serving the Mykolaiv and Kherson regions.
Tax Advantage For Data Centers: Businesses operate under a known regulatory environment that provides long-term operational consistency. While no specific data center breaks exist, the standard framework supports industrial growth.
Natural Disaster Risk
The overall risk for Mykolaiv is rated as High (5.6/10), as of September 2025. While human factors influence the current profile, several natural hazards are central to infrastructure planning.
- River Flood (6.2): Proximity to the Southern Bug and Inhul rivers makes this the primary natural concern for local facilities.
- Coastal Flood (5.0): As a major maritime hub, fluctuations in water levels are a documented regional factor as of September 2025.
- Epidemic (3.8): This factor contributes to the broader regional vulnerability assessment.
- Earthquake (2.0): Seismic activity is a minor consideration for local infrastructure deployment.
- Drought (2.4): This hazard is listed as a minor factor for data center operations. Other natural risks are not material to this specific geography as of September 2025.