Data Centers in Mykolaiv
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Ukraine
Mykolaiv – High Speed Access for Black Sea Logistics
Executive Summary
Mykolaiv serves as a vital edge location for organizations managing heavy industrial and maritime operations near the Black Sea. This market provides the proximity required for low latency processing in shipbuilding and global trade. Establishing a presence here ensures resilient regional connectivity and localized speed for mission-critical southern workloads.
Mykolaiv: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable links to Kyiv and Warsaw. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest on-ramp hub is Kyiv. |
| Power Cost | $0.12/kWh – as of September 2025 | Stable mix led by nuclear power. |
| Disaster Risk | High (5.6/10) – as of September 2025 | Primary concern is river flooding. |
| Tax Incentives | No | Standard national framework applies. |
| Sales Tax | 20% VAT – as of September 2025 | Standard national value-added tax. |
Network & Connectivity Ecosystem
Mykolaiv serves as a critical connectivity node within the national framework, supporting the data transfer requirements of major industrial players. As of September 2025, the ecosystem provides stable infrastructure for regional edge computing.
Carrier Density & Carrier Neutrality: Carrier count: over 15 as of September 2025. This includes a mix of national backbones and regional fiber operators. Local facilities generally provide a neutral environment for interconnecting with domestic and international networks.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions as of September 2025. There are no direct on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure within the city. Connectivity to these platforms is typically managed through private transport to hubs in Kyiv.
Internet Exchange Points (IXPs): Local traffic is frequently aggregated through major exchanges in Kyiv, such as DTEL-IX, to ensure efficient peering and reduced latency for international data flow as of September 2025.
Bare Metal: Dedicated server and bare metal options are accessible through regional providers and European players like OVHcloud or Leaseweb as of September 2025.
Power Analysis
The power infrastructure in Mykolaiv is integrated into a grid designed for heavy industrial use, providing a predictable environment for compute operations.
Average Cost Of Power: Industrial electricity is approximately $0.12/kWh as of September 2025. The generation mix consists of roughly 50–55% nuclear and 35–40% fossil fuels, providing a cost-effective base for regional workloads. This pricing supports competitive operational costs compared to Western European hubs.
Power Grid Reliability: The grid uses a well-engineered, redundant architecture with multi-substation support. Local data center operators maintain purpose-built on-site backup systems to ensure continuous uptime during grid maintenance.
Market Access, Business & Tax Climate
Mykolaiv represents a concentrated industrial market with significant potential for logistics and manufacturing infrastructure.
Proximity To Key Business Districts: Infrastructure is positioned to support the shipbuilding, grain export, and logistics sectors centered around the Mykolaiv port system. Real-time data processing in this location is vital for modern supply chain management.
Regional Market Reach: A presence in Mykolaiv effectively covers the southern population centers, specifically serving the Mykolaiv and Kherson regions as of September 2025.
Tax Advantage For Data Centers: No specialized financial incentives exist for data center construction or operation. Businesses benefit from a stable regulatory framework that supports industrial growth and long-term operational consistency.
Natural Disaster Risk
The overall risk for Mykolaiv is rated as High (5.6/10) as of September 2025. While human factors influence the current profile, several natural hazards are central to infrastructure planning.
- River Flood (6.2): Proximity to the Southern Bug and Inhul rivers makes this the primary natural concern for local facilities as of September 2025.
- Coastal Flood (5.0): As a major maritime hub, fluctuations in water levels are a documented regional factor.
- Epidemic (3.8): This factor contributes to the broader regional vulnerability assessment.
- Drought (2.4): This hazard is listed as a minor factor for data center operations.
- Earthquake (2.0): Seismic activity is a minor consideration for local infrastructure deployment.