Data Centers in Mykolaiv
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Ukraine
Mykolaiv – Strategic Port for Black Sea Connectivity
Mykolaiv serves as a developing digital hub for southern Ukraine, primarily supporting regional maritime, agricultural, and industrial operations. For businesses requiring a strategic presence near Black Sea ports, infrastructure in this market offers a foothold for edge computing and local service delivery, despite the current challenging operational environment. Digital infrastructure is foundational for rebuilding and future economic growth in the region.
Mykolaiv: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable connectivity suitable for regional business, with latency to major European hubs. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Closest major on-ramp hubs are in Warsaw or Frankfurt; access via private links. |
| Power Cost | Est. 3.50–4.50 UAH/kWh | Industrial power pricing is variable; reflects a mix dominated by nuclear energy. |
| Disaster Risk | High (5.6/10) | Elevated risk profile includes human factors, with specific natural hazards present. |
| Tax Incentives | No | No specific data center incentives are currently offered in this region. |
| Sales Tax | 20% VAT | Standard Value Added Tax rate applied to services, as of September 2025. |
Network & Connectivity Ecosystem
Mykolaiv's connectivity reflects its status as a regional economic center rather than a primary national telecom hub.
Carrier Density & Carrier Neutrality: Carrier presence is developing, with services focused on local and national providers. As of September 2025, carrier-neutral facilities are limited, with most connectivity options available through incumbent operators.
Direct Cloud On-Ramps: There are no direct cloud on-ramps in Mykolaiv, as of September 2025. Businesses connect to major cloud providers like AWS, Google Cloud, and Microsoft Azure through network partners, with primary access points located in major European hubs like Warsaw and Frankfurt.
Internet Exchange Points (IXPs): The region lacks a major public IXP. Peering is typically handled privately or routed through national exchange points in Kyiv, which centralizes traffic exchange for the country.
Bare Metal: Bare metal server availability is present, often provided by regional hosting companies. For broader international options, providers like OVHcloud can serve the region from nearby European data centers.
Power Analysis
The power infrastructure in Ukraine is undergoing significant strain and reconstruction. The national grid relies heavily on nuclear power, which provides a strong baseload, supplemented by fossil fuels and hydropower.
Average Cost Of Power: Industrial electricity costs are estimated to be between 3.50–4.50 UAH/kWh, as of September 2025. This pricing is subject to significant fluctuation due to grid instability and geopolitical factors, impacting operational expenditure predictability.
Power Grid Reliability: The national power grid faces severe reliability challenges. While core infrastructure is well-engineered, ongoing conflicts have caused substantial damage, making redundant power sources and robust on-site generation critical for any data center operation.
Market Access, Business & Tax Climate
Mykolaiv provides a strategic, though challenging, point of presence for accessing the southern Ukrainian market and Black Sea trade routes.
Proximity To Key Business Districts: Data centers in the area serve the city's vital shipbuilding, port logistics, and agricultural processing industries. Proximity enables low-latency support for local industrial automation and supply chain management.
Regional Market Reach: The market effectively serves southern Ukraine, including the key port cities of Odesa and Kherson. Its location is strategic for companies involved in international trade and maritime logistics.
Tax Advantage For Data Centers: There are no specific tax incentives for data center development. The current financial environment is focused on broader economic support and reconstruction rather than targeted IT infrastructure subsidies.
Natural Disaster Risk
Mykolaiv has a high overall risk profile, driven primarily by human factors, according to an INFORM Risk score of 5.6 out of 10, as of September 2025. The natural hazard risk is moderate but noteworthy.
Key natural risks include:
- River Flood: Scored at 6.2, this is the most significant natural threat.
- Coastal Flood: Scored at 5.0, impacting areas near the Southern Bug river estuary.
- Drought: Scored at 2.4, posing a secondary risk to agriculture and water resources.
- Earthquake: Scored at 2.0, indicating a low but present seismic risk.