Data Centers in Falkenberg
2 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Sweden
Falkenberg – High-Efficiency Resilience for Southern Sweden
Executive Summary
Falkenberg is a premier edge location for organizations needing reliable, low-cost infrastructure outside the Stockholm metro. Its combination of carbon-neutral power and low environmental risk makes it an ideal choice for primary regional workloads or secondary disaster recovery sites. For enterprises looking to slash operating costs while maintaining high availability, this market offers a compelling economic advantage.
Falkenberg: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable local footprint with efficient national backhaul. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest on-ramps are in Stockholm via private extension. |
| Power Cost | €0.07/kWh – as of July 2025 | Among the most competitive rates in Western Europe. |
| Disaster Risk | Low (2.1/10) – as of September 2025 | Extremely stable geological profile with minimal seismic activity. |
| Tax Incentives | Yes | Reduced customs duties and exemptions for imported hardware. |
| Sales Tax | 25% VAT – as of September 2025 | Standard national rate for services and equipment. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 10 as of September 2025. The market offers a resilient mix of national incumbents and regional fiber providers, ensuring path diversity for sensitive workloads. While not a massive global transit hub, it provides the necessary density for high-uptime regional operations.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions as of September 2025. No direct on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure exist within the city limits. Traffic typically reaches the Stockholm hub, the nearest major cloud intersection, through private wavelength services or managed layer 2 connections.
Internet Exchange Points (IXPs): Local peering is primarily managed through regional connections to Netnod or via the national hub in Stockholm as of September 2025. This ensures low-latency access to the broader Nordic backbone while keeping local traffic efficient.
Bare Metal: General availability for high-performance compute is maintained through regional providers as of September 2025. Standardized global options from providers like Leaseweb are frequently utilized for this geography to support localized processing.
Power Analysis
Average Cost Of Power: Industrial electricity is priced at €0.07/kWh as of July 2025. The grid uses a 95% low-carbon generation mix, dominated by hydro, nuclear, and wind. This pricing provides a significant cost advantage over tier-one European markets, where rates are often double or triple.
Power Grid Reliability: The local grid is well-engineered and integrated into the highly redundant Swedish national transmission system as of September 2025. Facilities benefit from multi-substation support, ensuring the stability required for enterprise digital operations. It is a boringly reliable system, which is exactly what infrastructure leads want.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers here support the manufacturing and industrial sectors of the Halland region as of September 2025. The location is a vital link between the Gothenburg and Malmö business corridors, providing low-latency support for regional logistics and production.
Regional Market Reach: Falkenberg effectively serves the population of Southern Sweden as of September 2025. It acts as a low-latency gateway for the Danish market, specifically Copenhagen, providing a functional node for Nordic-wide distribution.
Tax Advantage For Data Centers: Importers benefit from reduced customs duties and hardware exemptions as of September 2025. These incentives significantly lower the capital expenditure needed to scale a server footprint in the region, making it easier to deploy high-density hardware.
Natural Disaster Risk
The natural hazard risk for Falkenberg is Low (2.1/10) as of September 2025. The region is geologically stable, with most potential issues managed through modern infrastructure and purpose-built site selection.
- River Flood (6.3): This is the primary concern, requiring specific site selection in elevated areas as of September 2025.
- Coastal Flood (5.8): A regional factor for this coastal city, addressed through strict local building codes as of September 2025.
- Drought (1.3): Minimal impact on cooling or operational systems as of September 2025.
- Earthquake (0.1): Seismic risk is virtually nonexistent as of September 2025.
Other hazards such as tropical cyclones or tsunamis are not material risks for this location as of September 2025. Facilities are generally situated to avoid the minor flood risks present in the region.