Data Centers in Gijón
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Spain
Gijón – Resilient Edge Gateway for Northern Spain
Executive Summary
Gijón serves as a vital edge location for enterprises requiring a local presence and low-latency access to the Asturias industrial corridor. By utilizing the region's reliable infrastructure and increasing renewable energy capacity, businesses can secure a resilient site to protect data and maintain service speed across Northern Spain.
Gijón: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional performance as of September 2025. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest major hub is Madrid. |
| Power Cost | $0.11–$0.15 per kWh | Industrial rates as of January 2025. |
| Disaster Risk | Low (2.6/10) | Stable geological profile as of September 2025. |
| Tax Incentives | No | No specific data center breaks as of August 2025. |
| Sales Tax | 21% VAT | Standard Spanish rate as of September 2025. |
Network & Connectivity Ecosystem
As a regional industrial hub, Gijón provides steady infrastructure for localized workloads and edge computing.
Carrier Density & Carrier Neutrality: Carrier count: over 5 as of September 2025. While the local market is consolidated, facilities provide reliable interconnection points for regional and national transit. Expect access to ~5–10 carriers in the local ecosystem.
Direct Cloud On-Ramps: 0, enabling access to 0 cloud regions as of September 2025. There are no direct on-ramps from AWS, Google Cloud (GCP), or Microsoft Azure located physically in Gijón. Private extension options via wavelength or PNI are typically routed through Madrid to reach major cloud providers.
Internet Exchange Points (IXPs): Most local peering occurs through private interconnects or via the national exchange points in Madrid, which serves as the primary gateway for Spanish traffic as of September 2025.
Bare Metal: General availability of bare metal services is accessible through providers like Hivelocity or Latitude.sh, which can be deployed to serve the Northern Spanish market as of September 2025.
Power Analysis
Average Cost Of Power: Industrial electricity is priced between $0.11–$0.15 per kWh, as of January 2025. This pricing remains competitive within the European market, providing a stable cost basis for long-term deployments.
Power Grid Reliability: The grid is well-engineered with a strong emphasis on sustainability. Renewables accounted for 56% of the generation mix as of December 2024, supported by a redundant transmission network that ensures consistent uptime for critical infrastructure.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers in Gijón are positioned for proximity to the Port of El Musel and the heavy manufacturing sectors of Asturias. This location is critical for industrial IoT and logistics companies that require fast local processing for automated systems.
Regional Market Reach: Gijón provides an effective gateway to the Asturias region and the wider northern coastline of Spain, reaching a significant population that is distant from the primary Madrid hub.
Tax Advantage For Data Centers: Spain maintains a standardized tax environment without specific carve-outs for data center operations in this region. The primary financial benefit for operators is the availability of competitive industrial power rates and a stable regulatory environment that supports long-term infrastructure investment.
Natural Disaster Risk
The overall natural disaster risk for Gijón is Low (2.6/10), as of September 2025. The region is characterized by a stable geological profile, though its coastal position requires specific considerations for water-related hazards.
- River Flood: 6.4 (High). This is the primary concern for the area, necessitating sites located outside of immediate flood zones as of September 2025.
- Coastal Flood: 4.9 (Moderate). Coastal exposure is a factor for facilities located near the maritime front.
- Tsunami: 4.6 (Moderate). Regional risk exists due to Atlantic seismic activity, though it remains a secondary concern.
- Drought: 4.4 (Moderate). Potential impacts on water-cooled infrastructure during extended dry periods.
- Earthquake: 2.9 (Low). Seismic activity is minimal compared to other Mediterranean regions.
Other hazards, such as tropical cyclones, are considered minor or are not listed as significant threats to the local infrastructure as of September 2025.