Data Centers in Kigali
2 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Kigali – Gateway to East African Digital Expansion
Executive Summary
Kigali is the primary landing point for enterprises targeting the East African Community and the Great Lakes region. The market provides a stable, purpose-built environment for fintech and government technology operations that require low latency and strict data sovereignty. Establishing a presence here grants direct access to a growing economic zone of over 300 million people.
Kigali: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional hub for East African traffic. |
| Direct Cloud On-Ramps | 0 – as of December 2025 | Nairobi serves as the nearest primary on-ramp hub. |
| Power Cost | RWF 110.00 – 150.00/kWh | Competitive industrial rates as of December 2025. |
| Disaster Risk | Moderate (4.3/10) | Composite hazard score as of December 2025. |
| Tax Incentives | Yes | 1965 U.S.–Rwanda Investment Incentive Agreement included. |
| Sales Tax | 18% VAT | Standard services rate as of December 2025. |
Network & Connectivity Ecosystem
Kigali serves as a central point for regional fiber density, connecting landlocked neighbors to undersea cables via terrestrial paths through Kenya and Tanzania. The infrastructure is built for regional resilience.
Carrier Density & Carrier Neutrality: Carrier count: over 10 as of December 2025. The market includes a mix of regional giants and local specialists. Most facilities support neutral interconnection to prevent vendor lock-in and ensure competitive pricing.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions as of December 2025. Currently, no direct on-ramps for major global cloud providers exist within the city limits. Private extensions are managed through partner networks in Nairobi to reach global cloud clusters.
Internet Exchange Points (IXPs): The Rwanda Internet Exchange (RINEX) facilitates local traffic exchange. This reduces the need for international backhaul and lowers latency for domestic users.
Bare Metal: Resilient server options are available through regional infrastructure providers. Global specialized vendors such as Leaseweb serve the region through partner arrangements as of December 2025.
Power Analysis
Energy security is a priority for the Rwandan government, resulting in a diversified and increasingly green power grid.
Average Cost Of Power: Industrial electricity is estimated between RWF 110.00 – 150.00/kWh as of December 2025. This pricing structure remains competitive within the region and supports long-term operational budgeting for high-density deployments.
Power Grid Reliability: The grid is well-engineered with a mix of hydro, methane-to-power, and solar energy. Redundant substation support in major industrial zones ensures a reliable supply for sensitive digital infrastructure.
Market Access, Business & Tax Climate
Rwanda has built a reputation for ease of doing business, making Kigali a strong entry point for the African market.
Proximity To Key Business Districts: Data centers are located near the Kigali Special Economic Zone and the central business district. This allows for low-latency connectivity to the banking, telecommunications, and administrative sectors.
Regional Market Reach: From a central Kigali location, businesses can effectively serve over 300 million people across the East African Community.
Tax Advantage For Data Centers: The 1965 U.S.–Rwanda Investment Incentive Agreement provides a reliable legal framework for the protection of foreign capital. This agreement assists international firms in managing financial risk while building out critical digital infrastructure.
Natural Disaster Risk
Kigali maintains a Moderate (4.3/10) risk profile as of December 2025. The geography is primarily inland, which removes material concern regarding coastal flooding or tsunamis.
Natural hazards are led by:
- Epidemic: 6.0
- Earthquake: 4.0
- Drought: 3.8
- River Flood: 2.7
Other hazards are considered minor or are not material to data center operations in this region as of December 2025.