Inflect logo

Mobile Navigation

Mobile Navigation

All Data CentersRussiaTomsk

Data Centers in Tomsk

1 locations found

Data centers map in TomskInteractive map loads on demand to keep the page fast.

Need Help?

Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.

Explore Other Markets in Russia

Tomsk, Russia – Siberian Hub for Academic & Tech Workloads

Tomsk is a specialized market for organizations supporting Siberia's academic, research, and natural resource sectors. For businesses requiring a footprint in this region, local data centers provide the necessary infrastructure to process data locally and serve regional end-users effectively.

Tomsk, Russia: At A Glance

FactorRating / DataNotes
Global Connectivity GradeBReliable but focused on regional connectivity, not a global hub.
Direct Cloud On-Ramps0 – as of September 2025Nearest cloud access is via network extensions to Moscow.
Power CostEst. 3.50–5.00 ₽/kWhIndustrial power pricing is competitive for the region.
Disaster RiskModerate (4.4/10)Dominated by flood and human-related risks; seismic risk is present but lower.
Tax IncentivesNoNo specific data center tax incentives are offered, as of September 2025.
Sales TaxVAT: UnavailableStandard value-added tax rates apply; consult local authorities for current figures.

Network & Connectivity Ecosystem

Carrier Density & Carrier Neutrality: The Tomsk market features a focused number of national and regional carriers. While not a major interconnection hub, businesses can secure redundant connectivity through providers primarily serving the Siberian Federal District.

Direct Cloud On-Ramps: There are no direct cloud on-ramps within Tomsk, as of September 2025. Access to major cloud providers requires network connections to primary hubs like Moscow, which can be achieved through private line or wavelength services from national carriers.

Internet Exchange Points (IXPs): Public peering is limited in Tomsk. Most network interconnection is handled privately or routed through major national exchange points in larger Russian cities, ensuring sufficient but not exceptional network performance.

Bare Metal: Bare metal server options are available, often provided by regional hosting companies. These services are suitable for workloads requiring dedicated physical hardware.

Power Analysis

Average Cost Of Power: Industrial electricity costs are estimated to be between 3.50–5.00 ₽/kWh, as of September 2025. This pricing makes operating compute-intensive infrastructure economically viable for regional deployments.

Power Grid Reliability: The power grid serving Tomsk is generally stable, drawing from Russia's national grid which has a high dependency on fossil fuels (~65%) and nuclear power (~20%). Data centers in the area are engineered with standard redundancy, including UPS and generator backup, to mitigate potential grid issues.

Market Access, Business & Tax Climate

Proximity To Key Business Districts: Data centers in Tomsk serve the city's significant academic and scientific community, including Tomsk State University and numerous research institutes. They also support the region's oil, gas, and timber industries.

Regional Market Reach: From Tomsk, an organization can effectively serve a large portion of Western Siberia, including the Tomsk, Kemerovo, and Novosibirsk Oblasts. It acts as a digital consolidation point for this vast and resource-rich territory.

Tax Advantage For Data Centers: Russia does not offer specific national tax incentives for data center construction or operation. The primary financial advantage comes from the locally competitive power and operational costs rather than government tax relief programs.

Natural Disaster Risk

Tomsk has a moderate overall disaster risk profile, rated 4.4 out of 10, as of September 2025. While the overall hazard exposure is high, this is balanced by lower vulnerability and institutional coping capacity.

The most significant natural risks for infrastructure in the region are:

  • River Flood: 8.4/10
  • Drought: 6.1/10
  • Coastal Flood: 5.3/10 (Primarily impacting broader national supply chains)
  • Earthquake: 4.2/10
  • Tsunami: 4.2/10 (Not a direct risk to inland Tomsk)

The risk profile is heavily influenced by human factors, including a projected conflict probability score of 10/10.

WHY CHOOSE US?Helping You Find Connectivity Solutions For Your Business
Inflect logo
Expert SupportGet help from industry pros. Free of charge
Best DealsAccess exclusive deals from top providers.
Seamless ExperienceResearch, compare and purchase, all in one place.
Fast ResponsesGet your questions answered within 24 hours.
Our Partners
EquinixZayoDigital RealtyAT&T BusinessLumenArelion