Data Centers in Târgoviște
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Romania
Târgoviște – Resilient Redundancy Beyond the Capital
Târgoviște provides a secure secondary site for enterprises requiring geographic separation from Bucharest without sacrificing backbone access. It serves as a cost-effective failover hub for industrial and logistics firms prioritizing stability and localized data processing. This market is a strategic choice for businesses looking to de-risk their infrastructure from the concentration of the capital.
Târgoviște: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Stable national backbone access with regional peering. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest major hub is Bucharest. |
| Power Cost | €0.10/kWh – as of July 2025 | Predictable industrial rates with balanced energy mix. |
| Disaster Risk | Low (2.9/10) – as of December 2025 | Minimal aggregate risk for critical hardware. |
| Tax Incentives | Yes | Export credit insurance and loan guarantees available. |
| Sales Tax | 19% VAT – as of September 2025 | Standard national value-added tax applies. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: 1–5 carriers as of September 2025. The local market features a concentrated selection of national providers. Facilities generally operate with neutrality in mind, allowing customers to bring in fiber from regional backbone providers to ensure path diversity.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions as of September 2025. There are no native on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure within the city limits. Access is managed via private line extensions to Bucharest, which is approximately 80 kilometers away.
Internet Exchange Points (IXPs): Most local traffic peering occurs via major exchanges in Bucharest, such as RoNIX or InterLAN. This ensures that while physical hardware resides in Târgoviște, latency remains low for domestic and regional routing.
Bare Metal: Physical server availability is provided through regional specialists and national providers. High-performance hardware can be deployed through companies like Hivelocity or Leaseweb when specific localized compute is required.
Power Analysis
Average Cost Of Power: Industrial electricity is priced at €0.10/kWh as of July 2025. This rate allows for predictable operational budgeting and compares favorably to Western European markets. The local grid utilizes a mix of approximately 50% fossil fuels, 20% nuclear, and 30% renewables.
Power Grid Reliability: The electrical infrastructure is well-engineered and supported by multiple substations. Redundant configurations are standard for specialized facilities, ensuring the regional grid remains dependable for industrial and data-heavy operations.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Târgoviște is centrally located within Dâmbovița County, providing direct support to the manufacturing and industrial sectors that drive the local economy. Its distance from Bucharest makes it a suitable disaster recovery location that is still accessible within a short drive.
Regional Market Reach: This location effectively serves the southern and central regions of Romania. It acts as a digital bridge for logistics and industrial firms operating across the Muntenia region, offering a stable point for data storage.
Tax Advantage For Data Centers: Romania offers a supportive climate for technology investment through general export credit insurance and loan guarantees. These financial mechanisms help lower the cost of entry for firms importing technology for data center deployments.
Natural Disaster Risk
Târgoviște maintains a Low risk profile with an overall score of 2.9/10 as of December 2025. While the aggregate risk is minimal, specific hazards require standard mitigation strategies for facility operators.
- Earthquake: 6.1 (Moderate risk). This is the primary concern for structural planning in the region.
- River Flood: 6.1 (Moderate risk). Site selection must account for local hydrology to ensure uptime.
- Epidemic: 3.3 (Low risk). General regional health considerations with minimal industrial impact.
- Drought: 2.8 (Low risk). Minimal impact on cooling or operational sustainability.
Other hazards such as tropical cyclones or coastal flooding carry zero or negligible risk for this inland location. All metrics are current as of December 2025.