Data Centers in Warsaw
26 locations found
- E
EdgeConneX EDCWAW01
64A Nowogrodzka, Warszawa
- DP
dcenter.pl FT21
81 Aleje Jerozolimskie, Warszawa
- E
Equinix WA1
65/79 Aleje Jerozolimskie, Warszawa
- LD
LIM Warsaw
65/79 Aleje Jerozolimskie, Warszawa
- TC
Telia Company Warsaw
65/79 Aleje Jerozolimskie, Warszawa
- V
VirtuaOperator Warszawa
65/79 Aleje Jerozolimskie, Warszawa
- OB
Orange Business Services Warszawa
10 św. Barbary, Warszawa
- N
NTT Warsaw
ul. Piękna 24, Warsaw
- TM
T-Mobile Warsaw
ul. Piękna 24, Warsaw
- LM
Lukman Multimedia sp. z o. o. Warsaw
11 Piękna, Warszawa
- NS
Netia WAW01
11 Piękna, Warszawa
- ES
ETOP Sp z o.o. Warszawa
Al. Jerozolimskie 200, Warszawa
- AS
Atman WAW2
5 Konstruktorska, Warszawa
- TC
Telia Company WZW/G
177 Jutrzenki, Warszawa
- E
Equinix WA4X
Krakowiakow 91/101, Warszawa
- E
EdgeConneX EdgeConneX A
17 Modularna, Warsaw
- E
Equinix WA3
217 Aleje Jerozolimskie, Warszawa
- E
Equinix WA2
23 Poleczki, Warszawa
- NS
Netia Warszawa
13 Poleczki, Warszawa
- AS
Atman WAW1
21A Grochowska, Warszawa
- 3
3S Warsaw
3 Annopol, Warszawa
- VD
Vantage Data Center Vantage Warsaw WAW1
Huta, Warsaw
- DL
DATA4 Pologne
21 Przyparkowa, Jawczyce
- M
Microsoft WAW02 DC1
8 Logistyczna, Sekocin Stary
- N
NTT Piaseczno
66 Jana Pawła II, Piaseczno
- MS
Meverywhere DC-1
Leśna, Wyszków
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Poland
Warsaw – Poland's Connectivity Hub
Warsaw stands as a premier data center market for enterprises targeting Central and Eastern Europe. Its combination of dense, carrier-neutral connectivity, direct cloud access, and a low-risk natural disaster profile provides a stable and highly effective base for digital operations. This strategic location ensures low-latency access to a growing regional economy, directly supporting revenue growth and service reliability.
Warsaw: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | A | Excellent fiber density and diverse carrier options provide resilient, high-performance connectivity. |
| Direct Cloud On-Ramps | Over 1 – as of September 2025 | AWS, Azure, and Google Cloud have established direct access points in the market. |
| Power Cost | €0.10/kWh, as of 2024 | Competitive industrial power rates are advantageous for high-density computing and AI workloads. |
| Disaster Risk | Low (2.5/10), as of September 2025 | The region has minimal exposure to significant seismic, weather, or other natural threats. |
| Tax Incentives | No | Poland does not offer specific data center tax incentives; benefits are operational. |
| Sales Tax | 23% VAT, as of September 2025 | A standard Value Added Tax applies to equipment purchases and colocation services. |
Network & Connectivity Ecosystem
Warsaw has rapidly emerged as a key interconnection point for Central and Eastern Europe, attracting significant investment from network, cloud, and data center providers.
Carrier Density & Carrier Neutrality: The market is served by over 30 carriers, as of September 2025, offering extensive choice in both local and long-haul transport. A strong culture of carrier-neutral colocation ensures competitive pricing and avoids vendor lock-in.
Direct Cloud On-Ramps: With over 1 dedicated on-ramp, as of September 2025, Warsaw provides direct, private access to 17 global cloud regions. Major hyperscalers with a physical presence or dedicated access points include:
- AWS
- Azure
- Google Cloud (GCP)
Internet Exchange Points (IXPs): The city is home to major Polish Internet Exchanges, including PLIX. These exchanges facilitate efficient, low-latency traffic peering between networks, reducing costs and improving application performance for end-users.
Bare Metal: Bare metal cloud services are readily available from multiple providers. Operators like Leaseweb offer dedicated server solutions for workloads requiring maximum performance and security without a virtualization layer.
Power Analysis
Poland's power infrastructure is undergoing modernization, but the core grid supporting Warsaw's commercial districts is reliable and capable of handling modern data center loads.
Average Cost Of Power: Industrial power is priced competitively at approximately €0.10/kWh, as of 2024. This favorable rate makes Warsaw an economically sound choice for compute-intensive applications. The grid is primarily coal-powered, with a growing renewables segment.
Power Grid Reliability: The power grid serving Warsaw's main data center zones is well-engineered, with many facilities fed by redundant substations. This design minimizes the risk of utility outages and supports high uptime requirements.
Market Access, Business & Tax Climate
Warsaw provides a strategic foothold for accessing a large and dynamic economic region from within the European Union.
Proximity To Key Business Districts: Data centers in Warsaw are located near the city's central business district, financial centers, and technology parks. This proximity enables low-latency connections for financial trading, media production, and corporate IT operations.
Regional Market Reach: From Warsaw, organizations can effectively serve the entire Polish market of over 38 million people. The city's central location also makes it an ideal hub for delivering digital services to neighboring countries, including Germany, the Czech Republic, Slovakia, Ukraine, and the Baltic states.
Tax Advantage For Data Centers: Poland does not offer specific tax incentives for data center development. The primary financial advantage comes from the market's competitive operational costs and its strategic value for reaching customers, rather than direct government subsidies.
Natural Disaster Risk
Warsaw is located in a region with a very low risk of natural disasters, contributing to its appeal as a safe and stable location for critical IT infrastructure.
The overall INFORM Risk score is 2.5 out of 10, placing it in the "Low" risk category, as of September 2025. The primary natural hazards are manageable and infrequent.
Key risk factors include:
- River Flood: 5.9/10
- Drought: 2.4/10
- Earthquake: 0.8/10
Risks from tropical cyclones and tsunamis are nonexistent. This predictable and stable environmental profile simplifies business continuity planning and enhances infrastructure resilience.