Data Centers in Mancora
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Peru
Mancora – High-Performance Edge Access for Northern Peru
Executive Summary
Mancora provides a strategic edge for companies requiring ultra-low latency in Northern Peru and across the border into Ecuador. This location serves as a critical failover and distribution node for architectures that prioritize local user proximity over centralized scale. By placing infrastructure here, organizations secure a foothold in a growing regional market with favorable tax structures and reliable sustainable power.
Mancora: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable for regional edge deployments. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest on-ramp hub is Lima. |
| Power Cost | S/ 0.35–0.45/kWh – as of September 2025 | Competitive rates supported by hydro. |
| Disaster Risk | Moderate (4.6/10) – as of September 2025 | Coastal risks require resilient engineering. |
| Tax Incentives | Yes | Full central and municipal exemptions. |
| Sales Tax | 18% VAT – as of September 2025 | Standard rate for digital infrastructure. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 5, as of September 2025. The environment is dominated by major regional players like Telefonica, providing reliable transit along the northern coastal corridor for distributed applications.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions, as of September 2025. There are no native on-ramps from AWS, Google Cloud (GCP), or Microsoft Azure in the city. Direct cloud access typically requires private wave circuits or PNI to Lima.
Internet Exchange Points (IXPs): Public peering options are minimal; most local traffic is backhauled to PIT Peru in Lima to maintain routing efficiency as of September 2025.
Bare Metal: Specialized local bare metal capacity is available for edge workloads through providers such as Latitude.sh, as of September 2025.
Power Analysis
Average Cost Of Power: Industrial electricity rates range from S/ 0.35–0.45/kWh, as of September 2025. This pricing is supported by a diversified energy mix featuring roughly 55–60% hydroelectricity and 38–42% natural gas, providing a stable cost foundation for infrastructure operators.
Power Grid Reliability: The regional grid is well-engineered to support both the industrial aquaculture sector and the local tourism economy. Multi-substation feeds are used to ensure uptime for critical coastal infrastructure in key zones.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers are located near the aquaculture and logistics hubs of the Piura region. This proximity is vital for businesses requiring real-time data processing for northern supply chains.
Regional Market Reach: Mancora acts as the primary digital gateway between the Lima metropolitan hub and the southern markets of Ecuador, making it a pivotal site for cross-border connectivity.
Tax Advantage For Data Centers: Peru incentivizes national data center development through significant tax exemptions. Qualifying facilities benefit from an exemption from central, regional, and municipal taxes, lowering the total cost of ownership for long-term deployments.
Natural Disaster Risk
Mancora holds a Moderate (4.6/10) risk profile as of September 2025. Resilience planning must account for specific coastal and geological factors that are higher than the national average.
- Earthquake: High (9.6/10) – Significant seismic activity is the primary design consideration for structural integrity.
- Tsunami: High (9.1/10) – Coastal positioning necessitates specialized site selection to mitigate maritime risks.
- River Flood: Moderate (6.5/10) – Seasonal precipitation can impact logistics and low-lying facilities.
- Epidemic: Low (5.6/10) – Public health risks are managed through standard national protocols.
- Drought: Low (4.4/10) – Occasional impact on hydroelectric availability during extreme weather cycles.