Data Centers in Mancora
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Peru
Mancora, Peru – Edge Connectivity for Northern Peru
Executive Summary
Mancora serves as a niche edge data center market for businesses requiring low-latency performance in northern Peru. This location is primarily for content delivery networks and service providers targeting the region's tourism industry and local population. Deploying here provides a strategic advantage for applications where performance is sensitive to the distance from the primary digital hub in Lima.
Mancora, Peru: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reflects Peru's national connectivity, not a major international hub. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | The nearest cloud access hub is Lima; private connectivity is required. |
| Power Cost | ~$0.12 - $0.16/kWh | Based on national industrial averages, as of September 2025. |
| Disaster Risk | Moderate (4.6/10) | Significant seismic and tsunami risk requires hardened infrastructure. |
| Tax Incentives | Yes | DC-specific exemptions from central, regional, and municipal taxes are available. |
| Sales Tax | 18% VAT | Standard national rate, as of September 2025. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Connectivity is available from at least 1 provider, as of September 2025. The market is in its infancy, with network access provided by major national carriers extending their infrastructure to the region.
Direct Cloud On-Ramps: There are no direct cloud on-ramps in Mancora. Businesses requiring dedicated cloud access must establish private network connections to providers located in the primary interconnection hub of Lima.
Internet Exchange Points (IXPs): There are no public Internet Exchange Points in Mancora. All public and private peering is routed through national exchanges located in Lima.
Bare Metal: Bare metal server options are available, typically provisioned from Lima and served by providers with a strong Latin American presence, such as Latitude.sh.
Power Analysis
Average Cost Of Power: Expect industrial power rates between $0.12 and $0.16 per kWh, as of September 2025. Peru's power grid benefits from a high percentage of hydroelectric generation, which contributes to stable, long-term pricing. These favorable rates can lower operational expenditures for compute-intensive workloads.
Power Grid Reliability: The national grid is generally reliable, but any data center in a remote location like Mancora demands robust on-site backup. Facilities here are expected to have redundant UPS systems and on-site generators to ensure continuous uptime.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers in Mancora are positioned to serve the local tourism and hospitality sectors, which are the primary economic drivers. Proximity enables fast, reliable service for booking platforms, hotel management systems, and local businesses.
Regional Market Reach: From Mancora, businesses can effectively serve end-users across northern Peru and parts of southern Ecuador. This provides a significant latency advantage compared to backhauling all traffic from Lima.
Tax Advantage For Data Centers: Peru offers powerful tax incentives for data center development. Qualifying projects can receive exemptions from a range of central, regional, and municipal taxes, which directly reduces the total cost of ownership and encourages infrastructure investment.
Natural Disaster Risk
The overall disaster risk for Mancora is moderate, with a score of 4.6 out of 10, as of September 2025. The primary risks are geologic and weather-related, demanding infrastructure designed for resilience.
Key natural hazards include:
- Earthquake: Extremely high risk (9.6/10)
- Tsunami: Extremely high risk (9.1/10)
- River Flood: High risk (6.5/10)
- Drought: Moderate risk (4.4/10)
- Coastal Flood: Moderate risk (3.3/10)