Inflect logo
All Data CentersJapanSendai

Data Centers in Sendai

1 locations found

Data centers map in SendaiInteractive map loads on demand to keep the page fast.

Need Help?

Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.

Explore Other Markets in Japan

Sendai – The Resilient Northern Hub for Disaster Recovery

Sendai serves as the essential geographic hedge for organizations needing separation from the infrastructure density of Tokyo. It is a critical site for regional low-latency services and secondary deployments supporting the Tohoku economic corridor.

Sendai: At A Glance

FactorRating / DataNotes
Global Connectivity GradeBReliable links with backhaul to Tokyo hubs.
Direct Cloud On-Ramps0 – as of September 2025Nearest on-ramps are located in Tokyo.
Power Cost¥22.00–¥26.00/kWh – as of September 2025Industrial rates with a 73% fossil fuel mix.
Disaster RiskLow (2.1/10) – as of September 2025Infrastructure quality mitigates high regional hazards.
Tax IncentivesYesSubsidies support decentralizing from Tokyo.
Sales Tax10% Consumption Tax – as of September 2025Standard national rate for Japan.

Network & Connectivity Ecosystem

Carrier Density & Carrier Neutrality: Carrier count: ~5 as of January 2026. The local ecosystem is led by regional telecommunications leaders and national utilities, providing reliable fiber access for the northern Honshu territory.

Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions as of January 2026. While local on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure are unavailable, low-latency private extensions to Tokyo are the standard deployment model for local enterprises.

Internet Exchange Points (IXPs): Public peering is limited within the city, with most traffic aggregating through major national exchanges in Tokyo. Organizations typically rely on private peering or dedicated transport to reach larger exchange points for high-volume traffic.

Bare Metal: Dedicated hardware availability is stable for high-performance compute and localized storage needs. Options are available through providers such as Hivelocity or Latitude.sh as of January 2026.

Power Analysis

Average Cost Of Power: Industrial electricity is approximately ¥22.00–¥26.00/kWh as of September 2025. The energy mix consists of roughly 73% fossil fuels, 21% renewables, and 6% nuclear. These costs are a primary operational consideration for high-density deployments compared to less developed regional markets.

Power Grid Reliability: The grid in Sendai is well-engineered and utilizes redundant transmission lines. It benefits from multi-substation support common in Japanese Tier 2 cities, providing high uptime for the local research and industrial corridors.

Market Access, Business & Tax Climate

Proximity To Key Business Districts: Data centers are positioned to serve the Sendai central business district and the Tohoku University research corridor. This proximity is vital for low-latency applications supporting local government, academia, and the regional financial sector.

Regional Market Reach: Sendai serves as the economic hub for the Tohoku region, reaching a population of approximately nine million people. It acts as the primary digital gateway for the northern part of Honshu island.

Tax Advantage For Data Centers: National programs offer financial support for companies moving digital assets out of the Tokyo and Osaka metropolitan areas. This initiative helps customers reduce long-term costs while improving the national distribution of resilient infrastructure.

Natural Disaster Risk

Sendai maintains a Low risk profile with a score of 2.1/10 as of September 2025. While the region experiences high natural hazards, Japan’s high quality of infrastructure and disaster readiness keeps the overall risk class low for operational environments.

  • Tsunami: 10.0 (Regional risk managed via coastal defenses)
  • Earthquake: 9.7 (Managed via strict national building codes)
  • Coastal Flood: 9.4 (Indirect regional risk)
  • Tropical Cyclone: 9.2
  • River Flood: 7.8

Other hazards such as drought or human-related conflict are negligible for this market as of September 2025.

WHY CHOOSE US?Helping You Find Connectivity Solutions For Your Business
Inflect logo
Expert SupportGet help from industry pros. Free of charge
Best DealsAccess exclusive deals from top providers.
Seamless ExperienceResearch, compare and purchase, all in one place.
Fast ResponsesGet your questions answered within 24 hours.
Our Partners
EquinixZayoDigital RealtyAT&T BusinessLumenArelion