Inflect logo

Mobile Navigation

Mobile Navigation

Teramo – Reliable Edge Connectivity for the Adriatic Corridor

Executive Summary

Teramo serves as a critical edge location for organizations requiring direct, low-latency access to the central Adriatic industrial corridor. It provides a sturdy alternative to congested primary hubs, offering a purpose-built environment for regional data distribution and secure industrial processing. This market is a strategic choice for businesses prioritizing uptime and proximity to central Italian manufacturing sectors.

Teramo: At A Glance

FactorRating / DataNotes
Global Connectivity GradeBDependable regional performance for diverse traffic.
Direct Cloud On-Ramps0 – as of September 2025Access via private transport to Rome or Milan.
Power Cost€0.19–€0.24/kWh – as of September 2025Pricing reflects the national energy mix and taxes.
Disaster RiskLow (3.0/10) – as of September 2025Natural risk levels are manageable for infrastructure.
Tax IncentivesYesSubsidies available for energy-efficient systems.
Sales Tax22% VAT – as of September 2025Standard national rate for industrial services.

Network & Connectivity Ecosystem

Carrier Density & Carrier Neutrality: Carrier count: over 5. Regional facilities host a variety of national and international providers, offering reliable paths for diverse routing as of September 2025. This carrier-neutral environment allows for competitive pricing and flexible network architecture.

Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions. There are no native on-ramps in Teramo as of September 2025. Secure connectivity to AWS, Google Cloud (GCP), or Microsoft Azure is typically managed via private transport to the nearest major hubs in Rome or Milan.

Internet Exchange Points (IXPs): Peering is primarily handled via the nearest national hubs in Rome or Milan to ensure efficient handoffs. Local traffic relies on private interconnects or direct transport to national exchange points to maintain performance as of September 2025.

Bare Metal: Resilient bare metal solutions are available through providers such as Latitude.sh or Hivelocity via regional points of presence. These services allow for rapid scaling and high-performance compute without the overhead of physical hardware management as of September 2025.

Power Analysis

Average Cost Of Power: Industrial electricity is estimated between €0.19/kWh and €0.24/kWh as of September 2025. This pricing is influenced by the national energy mix, which includes approximately 60% fossil fuels and 40% renewables. These rates are a primary consideration for high-density deployments.

Power Grid Reliability: The local grid is supported by well-engineered infrastructure with multi-substation support. Redundant configurations are standard for specialized facilities to maintain continuous operations and mitigate localized outages as of September 2025.

Market Access, Business & Tax Climate

Proximity To Key Business Districts: Data centers are located near the coastal industrial corridor, supporting manufacturing and service sectors in Alba Adriatica and the wider Abruzzo region. This proximity allows for high-speed local processing for industrial automation and regional logistics.

Regional Market Reach: Teramo effectively serves central Italy and the Adriatic coastline, providing a vital bridge between northern and southern digital markets. It is a key location for edge caching and distributing content to regional population centers.

Tax Advantage For Data Centers: Italy provides specific subsidies for energy-efficient systems and related infrastructure improvements. These programs help reduce capital expenditure for facilities prioritizing sustainable, high-performance operations, effectively lowering the total cost of ownership as of September 2025.

Natural Disaster Risk

The overall risk for Teramo is Low (3.0/10) as of September 2025. While the risk class is low, the location faces specific environmental factors that require standard engineering safeguards.

  • Earthquake (7.7/10): Regional seismic activity is the primary natural consideration for structural planning.
  • Coastal Flood (6.5/10): A factor for coastal facilities requiring specific site selection protocols; this is considered a regional risk as of September 2025.
  • River Flood (6.2/10): Moderate risk based on local topography and regional drainage patterns.
  • Tsunami (6.1/10): National-level regional assessment; impact is typically mitigated by facility elevation and distance from the shoreline.
  • Drought (2.8/10): Minor factor with low business impact.
WHY CHOOSE US?Helping You Find Connectivity Solutions For Your Business
Inflect logo
Expert SupportGet help from industry pros. Free of charge
Best DealsAccess exclusive deals from top providers.
Seamless ExperienceResearch, compare and purchase, all in one place.
Fast ResponsesGet your questions answered within 24 hours.
Our Partners
EquinixZayoDigital RealtyAT&T BusinessLumenArelion