Inflect logo
All Data CentersItalyAlessandria

Data Centers in Alessandria

1 locations found

Data centers map in AlessandriaInteractive map loads on demand to keep the page fast.

Need Help?

Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.

Explore Other Markets in Italy

Alessandria – Strategic Edge for the Industrial Triangle

Executive Summary

Alessandria provides a purpose-built environment for enterprises requiring low-latency links to the industrial powerhouse of Milan, Turin, and Genoa. It serves as a secure, cost-effective alternative to larger metros, offering the resiliency needed for mission-critical infrastructure without the premium pricing of Milan.

Alessandria: At A Glance

FactorRating / DataNotes
Global Connectivity GradeBReliable regional links with high uptime.
Direct Cloud On-Ramps0 – as of September 2025Milan is the nearest on-ramp hub.
Power Cost€0.22/kWh – as of September 2025Based on regional industrial rates.
Disaster RiskLow (3.0/10) – as of September 2025Stable environment with managed local hazards.
Tax IncentivesYesSubsidies for energy-efficient infrastructure.
Sales Tax22% VAT – as of September 2025Standard Italian value-added tax rate.

Network & Connectivity Ecosystem

Carrier Density & Carrier Neutrality: Carrier count: over 5, as of September 2025. While local density is lower than in major Tier 1 hubs, the available fiber paths provide resilient transport to the main European backbones.

Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions, as of September 2025. There are no direct on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure within local facilities. Private, high-speed extensions to Milan cloud hubs provide the necessary performance for hybrid architectures.

Internet Exchange Points (IXPs): Most peering occurs at the Milan Internet eXchange (MIX) or through private interconnects, as of September 2025. This arrangement keeps traffic local to Northern Italy and minimizes latency for regional users.

Bare Metal: Resilient bare metal services are available through regional providers and global players like Leaseweb or OVHcloud, providing flexible compute for edge workloads, as of September 2025.

Power Analysis

Average Cost Of Power: Industrial electricity is approximately €0.22/kWh, as of September 2025. This rate reflects a national energy mix of 60% fossil fuels and 40% renewables. Local energy-efficiency subsidies are a primary factor for operational planning in this market.

Power Grid Reliability: The local grid is well-engineered and supports heavy industrial activity. Data center corridors benefit from multi-substation support, ensuring facilities maintain high availability during peak demand cycles, as of September 2025.

Market Access, Business & Tax Climate

Proximity To Key Business Districts: The city is a major logistics and rail hub centrally located between Milan and Genoa. Data centers here serve the manufacturing sectors of Piedmont and the maritime industries of Liguria, providing the speed required for automated supply chains, as of September 2025.

Regional Market Reach: A deployment in this location effectively serves over 10 million people across Northern Italy. It provides a reliable failover site for Milan-based operations while remaining close enough for easy physical management, as of September 2025.

Tax Advantage For Data Centers: Operators benefit from subsidies for energy-efficient systems and related improvements. This program helps offset the cost of Italian power by rewarding the implementation of green cooling and modern power distribution technologies.

Natural Disaster Risk

The overall risk for Alessandria is Low (3.0/10), as of September 2025. The environment is stable, though specific hazards require standard mitigation.

  • Earthquake: 7.7/10. Northern Italy has known seismic activity, so facilities are built to strict European standards to manage this, as of September 2025.
  • River Flood: 6.2/10. Proximity to the Po Valley river systems makes flood management a priority for site selection, as of September 2025.
  • Drought: 2.8/10. This is a secondary concern regarding long-term cooling water availability, as of September 2025.

Other natural hazards are minor or not listed for this geography. All figures are current as of September 2025.

WHY CHOOSE US?Helping You Find Connectivity Solutions For Your Business
Inflect logo
Expert SupportGet help from industry pros. Free of charge
Best DealsAccess exclusive deals from top providers.
Seamless ExperienceResearch, compare and purchase, all in one place.
Fast ResponsesGet your questions answered within 24 hours.
Our Partners
EquinixZayoDigital RealtyAT&T BusinessLumenArelion