Data Centers in Alessandria
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Italy
- Milan 36
- Rome 12
- Turin 12
- Florence 6
- Arezzo 5
- Bologna 4
- Padua 4
- Palermo 4
- Bari 3
- Frosinone 3
- Latina 3
- Naples 3
- Ancona 2
- Ascoli Piceno 2
- Brescia 2
- Genoa 2
- Lamezia Terme 2
- Salerno 2
- Venice 2
- Vicenza 2
- Asti 1
- Bergamo 1
- Bolzano 1
- Cagliari 1
- Campobasso 1
- Chieti 1
- Cosenza 1
- Ferrara 1
- La Spezia 1
- Lecce 1
- Lecco 1
- Nuoro 1
- Parma 1
- Perugia 1
- Piacenza 1
- Pisa 1
- Pordenone 1
- Rieti 1
- Sicily 1
- Teramo 1
- Trento 1
- Udine 1
- Verona 1
Alessandria – Strategic Edge for the Industrial Triangle
Executive Summary
Alessandria serves as a purpose-built hub for enterprises needing high-speed links within the commercial powerhouse of Milan, Turin, and Genoa. It offers a secure environment for mission-critical infrastructure while bypassing the congestion and premium pricing of larger metros.
Alessandria: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional links with high uptime. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Milan is the nearest on-ramp hub. |
| Power Cost | €0.22/kWh – as of September 2025 | Based on regional industrial rates. |
| Disaster Risk | Low (3.0/10) – as of September 2025 | Minimal overall risk for the region. |
| Tax Incentives | Yes | Subsidies for energy-efficient infrastructure. |
| Sales Tax | 22% VAT – as of September 2025 | Standard Italian value-added tax rate. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 5, as of September 2025. While density is lower than in Milan, the available fiber paths provide resilient transport to major European backbones.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions, as of September 2025. No direct on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure exist within the local facilities. Private, high-speed extensions to Milan cloud hubs ensure performance for hybrid architectures.
Internet Exchange Points (IXPs): Most peering occurs at the Milan Internet eXchange (MIX) or via private interconnects, as of September 2025. This keeps traffic local to Northern Italy and reduces latency for regional users.
Bare Metal: Resilient bare metal services are available via regional providers and global players like Leaseweb or OVHcloud, providing flexible compute for edge workloads, as of September 2025.
Power Analysis
Average Cost Of Power: Industrial electricity is approximately €0.22/kWh, as of September 2025. This reflects a mix of 60% fossil fuels and 40% renewables, making local energy-efficiency subsidies a primary factor for operational planning.
Power Grid Reliability: The local grid is well-engineered and supports heavy industrial activity. Data center corridors benefit from multi-substation support, ensuring facilities maintain high availability during peak demand, as of September 2025.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: The city is a major logistics and rail hub. Data centers here serve the manufacturing sectors of Piedmont and maritime industries of Liguria, providing the low latency required for automated supply chains, as of September 2025.
Regional Market Reach: A deployment here effectively serves over 10 million people across Northern Italy. It provides a reliable failover site for Milan-based operations while remaining close enough for easy physical management, as of September 2025.
Tax Advantage For Data Centers: Operators benefit from subsidies for energy-efficient systems and related improvements. This program helps offset the cost of Italian power by rewarding the implementation of green cooling and power distribution technologies.
Natural Disaster Risk
The overall risk for Alessandria is Low (3.0/10), as of September 2025. The environment is stable, though specific hazards require standard mitigation.
- Earthquake: 7.7/10. Northern Italy has seismic activity, so modern facilities are built to strict European standards to manage this, as of September 2025.
- River Flood: 6.2/10. Proximity to the Po Valley river systems makes flood management a priority for site selection, as of September 2025.
- Drought: 2.8/10. This is a secondary concern affecting long-term cooling water availability, as of September 2025.
Other natural hazards are minor or not listed for this geography. All figures are current as of September 2025.