Data Centers in Lübeck
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Germany
- Frankfurt 122
- Berlin 39
- Hamburg 39
- Munich 36
- Dusseldorf 33
- Stuttgart 21
- Nuremberg 20
- Bremen 19
- Cologne 11
- Karlsruhe 11
- Hanover 9
- Ruhr Area 8
- Bielefeld 6
- Dortmund 6
- Dresden 5
- Leipzig 5
- Gütersloh 4
- Heilbronn 4
- Kiel 4
- Bonn 3
- Erfurt 3
- Mannheim 3
- Münster 3
- Reutlingen 3
- Augsburg 2
- Bamberg 2
- Coburg 2
- Hof 2
- Ingolstadt 2
- Jena 2
- Ludwigshafen 2
- Magdeburg 2
- Rostock 2
- Strasbourg 2
- Würzburg 2
- Aachen 1
- Deggendorf 1
- Freiburg 1
- Fulda 1
- Kirchheim 1
- Konstanz 1
- Langen 1
- Marburg 1
- Paderborn 1
- Regensburg 1
- Saarbrücken 1
- Schweinfurt 1
- Schwerin 1
- Tübingen 1
- Ulm 1
- Wolfsburg 1
- Wuppertal 1
- Zwickau 1
Lübeck – Strategic Edge Interconnection for Northern Europe
Lübeck: A Specialized Regional Hub
Lübeck serves as a strategic interconnection point for businesses requiring a stable footprint outside major tier-one congestion zones. Its proximity to Baltic trade routes and Hamburg makes it a prime choice for high-availability secondary sites or regional edge deployments. This market provides the reliability needed for secure data sovereignty within the German legal framework.
Lübeck: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional performance as of September 2025. |
| Direct Cloud On-Ramps | 0 — as of September 2025 | Nearest on-ramp hub is Hamburg. |
| Power Cost | €0.15/kWh, as of September 2025 | Industrial rates include tax and renewable mix. |
| Disaster Risk | Low (2.6/10), as of September 2025 | Geologically stable with manageable regional water risks. |
| Tax Incentives | Yes | Support exists for renewable energy infrastructure projects. |
| Sales Tax | 19% VAT, as of September 2025 | Standard German value-added tax rate applies. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 5, as of September 2025. While the market is concentrated around specific local facilities, it maintains a mix of regional fiber providers and national carriers. This density provides sufficient path diversity for most enterprise workloads.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions, as of September 2025. There are no direct on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure physically located in the city. High-speed private extensions via PNI or wave services to Hamburg are the standard method for reaching major cloud ecosystems.
Internet Exchange Points (IXPs): Lübeck lacks a major public exchange of its own, with most peering traffic routed through DE-CIX in Hamburg. This setup keeps latency low for regional distribution while leveraging one of the most resilient exchange points in Europe.
Bare Metal: General availability for dedicated hardware exists through regional providers. For standardized deployments, services from IONOS or OVHcloud are the typical options for this geography, as of September 2025.
Power Analysis
Average Cost Of Power: Industrial electricity is priced at €0.15/kWh, as of September 2025. This rate reflects the broader German energy market and its transition to renewable sources, with renewables accounting for approximately 55% of the mix. The current pricing allows for predictable operational forecasting while supporting sustainability goals.
Power Grid Reliability: The local grid is well-engineered and benefits from the redundant infrastructure typical of German industrial zones. It provides multi-substation support to ensure consistent delivery to mission-critical facilities.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Facilities are positioned to serve the Hanseatic business district and the growing medical technology cluster in the region. This proximity allows for low-latency support of local manufacturing and logistics operations.
Regional Market Reach: Lübeck is a gateway for Northern Germany and the Baltic Sea region. It effectively serves as a bridge for data traffic moving between Central Europe and Scandinavia.
Tax Advantage For Data Centers: The primary financial benefit involves government support for renewable energy projects, which can offset the costs of greening a data center footprint. This incentive helps operators manage the long-term expenses of power-hungry infrastructure.
Natural Disaster Risk
Lübeck maintains a Low risk profile with an overall score of 2.6/10, as of September 2025. The environment is stable, though water-related hazards require specific facility-level attention.
- Coastal Flood (8.0): This is a material regional risk; however, for inland facilities, the impact is primarily indirect or localized to the immediate coastline.
- River Flood (7.8): A factor for facilities near the Trave river, necessitating elevated infrastructure.
- Earthquake (3.7): Seismic activity is minimal and rarely impacts structural integrity.
- Drought (1.3): A minor concern with negligible impact on cooling operations or power generation.
Other natural hazards are considered minor or are not listed for this location.