Data Centers in Libreville
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Libreville – Strategic Hub for Central African Connectivity
Executive Summary
Libreville is the primary entry point for digital infrastructure in Gabon, serving businesses that require a foothold in Central Africa. For companies targeting the region's growing economies, establishing a presence here is critical for reducing latency and improving application performance for local users.
Libreville: At A Glance
Factor | Rating / Data | Notes |
---|---|---|
Global Connectivity Grade | B | Developing international connectivity with key subsea cable landings. |
Direct Cloud On-Ramps | 0 — as of September 2025 | Nearest major hubs include Johannesburg or Lisbon; private connectivity is available. |
Power Cost | $0.16 – $0.24/kWh (est.) | Costs are higher than global averages, reflecting local generation challenges. |
Disaster Risk | Moderate (4/10) — as of September 2025 | Dominated by flood risk in coastal areas and public health system vulnerabilities. |
Tax Incentives | Yes | Government subsidies are available but may experience payment delays. |
Sales Tax | 18% VAT — as of September 2025 | Standard Value Added Tax rate applied to services. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: The market is developing, with one primary colocation provider operating in the market, as of September 2025.
Direct Cloud On-Ramps: 0 direct on-ramps and 0 cloud regions are available locally, as of September 2025. Access to major cloud providers requires connecting through hubs in South Africa (Johannesburg) or Europe (Lisbon, Marseille). Private network extensions can establish secure links to these locations.
Internet Exchange Points (IXPs): Public peering is limited. Most traffic exchange is handled privately within the primary data center or routed through international carriers.
Bare Metal: Bare metal services are available from global providers, who can deploy dedicated servers within the local colocation facility to meet specific performance or security needs.
Power Analysis
Average Cost Of Power: The estimated cost for industrial power is between $0.16 – $0.24/kWh, as of September 2025. This price point is higher than in major European or North American hubs and needs to be factored into total cost of ownership models. The power mix is 41% low-carbon (mainly hydropower) and 59% fossil fuels, as of 2023.
Power Grid Reliability: The local power grid can be inconsistent. Data centers in Libreville rely on redundant on-site power generation, including enterprise-grade UPS systems and diesel generators, to ensure uptime and meet service level agreements.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: The data center in Libreville is situated to serve the city's primary commercial and administrative districts. This provides low-latency connectivity for government, finance, and energy sector clients operating in the capital.
Regional Market Reach: From Libreville, businesses can effectively serve users across Gabon and extend their reach into neighboring Central African countries like Equatorial Guinea and Cameroon.
Tax Advantage For Data Centers: Gabon offers tax incentives, primarily through government subsidies, to encourage investment in key sectors like technology. These measures can help offset initial capital expenditures, though businesses should plan for potential administrative delays in payment.
Natural Disaster Risk
Libreville has a Moderate natural disaster risk profile, with an INFORM Risk score of 4 out of 10, as of September 2025. The risk assessment indicates that while the overall hazard level is manageable, the country has significant vulnerabilities and a lack of institutional coping capacity.
The primary environmental threats for infrastructure are:
- River Flood: 5.6/10
- Coastal Flood: 5.1/10
- Drought: 0.9/10
- Earthquake: 0.1/10