Data Centers in Grenoble
6 locations found
- EB
Eolas - Business & Decision Group Grenoble
73 Rue Général Mangin Grenoble 38100 FRA, Grenoble
- OB
Orange Business Services Grenoble
73 Rue Général Mangin Grenoble 38100 FRA, Grenoble
- SS
SFR Grenoble
93 Rue Général Mangin Grenoble 38100 FRA, Grenoble
- X
Alpilink Grenoble
6 Avenue Pierre de Coubertin Seyssinet-Pariset 38170 FRA, Seyssinet-Pariset
- DS
dc2scale ALP1
38 Rue Diderot Grenoble 38000 FRA, Grenoble
- C
Cogent GNB01
33 Rue Joseph Chanrion Grenoble 38000 FRA, Grenoble
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in France
- Paris 95
- Lyon 17
- Marseille 13
- Nantes 13
- Lille 11
- Montpellier 9
- Nice 8
- Toulouse 8
- Bordeaux 6
- Rouen 6
- Strasbourg 5
- Reims 4
- Rennes 4
- Amiens 3
- Valenciennes 3
- Besançon 2
- Nancy 2
- Poitiers 2
- Albi 1
- Annecy 1
- Auxerre 1
- Belfort 1
- Caen 1
- Chambéry 1
- Chartres 1
- Dijon 1
- Geneva 1
- Le Mans 1
- Le Touquet 1
- Lezennes 1
- Nîmes 1
- Niort 1
- Pau 1
- Tours 1
- Valence 1
- Vesoul 1
Grenoble – Precision Infrastructure for Research and Edge Tech
Executive Summary
High-stakes R&D and specialized engineering firms use Grenoble to secure low-latency access to the French technical corridor. This market provides a resilient foothold for enterprises requiring localized compute power near world-class research centers. It is the tactical choice for balancing high-performance needs with regional stability.
Grenoble: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional performance with strong national backhaul capacity. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest major hub is Lyon; access via private extensions. |
| Power Cost | €0.19–€0.22/kWh, as of September 2025 | Competitive pricing due to heavy reliance on nuclear energy. |
| Disaster Risk | Low (2.7/10), as of September 2025 | Primary environmental concern is localized river flooding. |
| Tax Incentives | Yes | Specialized EIB loan financing supports major data center projects. |
| Sales Tax | 20% VAT, as of September 2025 | Standard French turnover tax applies to digital services. |
Network & Connectivity Ecosystem
Grenoble functions as a purposeful edge market within the broader French digital landscape. While it does not match the massive carrier density of Paris, it offers the necessary infrastructure for localized high-stakes computing.
Carrier Density & Carrier Neutrality: Carrier count: over 10, as of September 2025. The market maintains a reliable set of national and local providers, ensuring sufficient transport options for mid-sized enterprise requirements.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions, as of September 2025. There are currently no direct on-ramps from AWS, Google Cloud (GCP), or Microsoft Azure physically located in the city. Enterprises typically access these services through private extensions or transport links to the nearest hub in Lyon, located approximately 100 kilometers away.
Internet Exchange Points (IXPs): Public exchange presence is localized, with most high-volume peering occurring via private interconnects or by backhauling traffic to regional exchanges in Lyon or national hubs in Paris.
Bare Metal: High-performance hardware is available through providers such as OVHcloud. This allows for dedicated compute resources without the overhead of managing physical facility logistics as of September 2025.
Power Analysis
France offers one of the most stable energy profiles in Europe, characterized by high availability and relatively predictable pricing.
Average Cost Of Power: Industrial electricity is estimated at €0.19–€0.22/kWh, as of September 2025. The grid mix consists of approximately 68% nuclear and 22% renewables, providing a low-carbon footprint for energy-intensive operations. These rates offer a significant advantage for long-term operational budgeting compared to more volatile European markets.
Power Grid Reliability: The local grid is well-engineered with redundant configurations standard in major industrial corridors. High-voltage support and multi-substation feeds are standard for the city technical districts.
Market Access, Business & Tax Climate
The local economy is driven by a unique blend of industrial legacy and future-facing technology.
Proximity To Key Business Districts: Data centers are strategically positioned near the Presqu'île innovation district. This area is home to major research institutions and multinational tech firms, making physical proximity vital for collaborative R&D and low-latency local area networking.
Regional Market Reach: A deployment in Grenoble effectively serves the entire Isère department and the broader Auvergne-Rhône-Alpes region. It provides a necessary bridge between the Mediterranean coast and northern industrial centers.
Tax Advantage For Data Centers: France provides specific financial frameworks to support digital infrastructure growth, including specialized loan programs for sustainable facility development. This access to capital reduces the initial burden of large-scale hardware deployments and facility expansion.
Natural Disaster Risk
Grenoble maintains a Low risk profile with an overall score of 2.7/10 as of September 2025. The geography of the Alps dictates specific environmental considerations for facility managers.
- River Flood (7.5): The most significant localized risk due to the proximity of the Isère and Drac rivers.
- Earthquake (2.8): Low seismic activity is present but rarely impacts modern, reinforced structures.
- Epidemic (2.4): In line with national health security standards.
- Drought (1.6): Minimal impact on facility cooling or operations.
Other natural hazards are considered minor or are not listed as material to this specific inland location. Facilities in this region are generally purpose-built to manage these specific environmental factors as of September 2025.