Data Centers in Vukovar
3 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Croatia
Vukovar – Strategic Access to Southeast Europe
Executive Summary
Vukovar offers a strategic and cost-effective data center presence in Southeast Europe. For businesses targeting the Balkans, it provides a stable, EU-compliant base with access to a high percentage of renewable energy. This combination helps control operational costs while ensuring reliable service delivery to emerging regional markets.
Vukovar: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Solid regional connectivity, but not a primary European hub. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Access via private network extension to hubs like Zagreb or Vienna. |
| Power Cost | €0.28/kWh – as of December 2023 | Grid features a high percentage of renewable energy (68%). |
| Disaster Risk | Low (2.5/10) – as of September 2025 | Primary risks are river flooding and seismic activity. |
| Tax Incentives | No | No specific data center tax incentives are currently offered. |
| Sales Tax | 25% VAT – as of September 2025 | Standard Croatian Value Added Tax applies. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality As a developing market, Vukovar has a focused carrier ecosystem. Major national providers are present in its 3 facilities (as of September 2025), but carrier density is not comparable to primary European hubs.
Direct Cloud On-Ramps Vukovar has no direct cloud on-ramps as of September 2025, with 0 cloud regions available locally. Secure, low-latency access to major cloud providers is achieved via private network connections to established hubs like Zagreb, Budapest, or Vienna.
Internet Exchange Points (IXPs) Peering is typically handled privately or through the Croatian Internet eXchange (CIX) in Zagreb, which serves as the national hub for traffic exchange.
Bare Metal Bare metal services are available from providers focused on European markets, such as IONOS or Leaseweb, enabling dedicated server deployments.
Power Analysis
Average Cost Of Power The average industrial power cost in Vukovar is €0.28/kWh, as of December 2023. This price point is competitive for the region and, combined with high renewable content (68%), helps manage both operational expenses and carbon footprint.
Power Grid Reliability The Croatian power grid is stable and well-maintained, conforming to EU standards. Data centers in the region typically source power from multiple substations to ensure high levels of uptime for critical operations.
Market Access, Business & Tax Climate
Proximity To Key Business Districts Data centers in Vukovar are positioned to serve the logistical and industrial zones along the Danube River. This location provides a crucial link for companies doing business across Croatia, Serbia, and Hungary.
Regional Market Reach Vukovar's strategic location on the eastern border of the EU provides effective, low-latency access to a wide geography, including Serbia, Bosnia and Herzegovina, and Hungary. It serves as an effective digital gateway to the wider Balkan peninsula.
Tax Advantage For Data Centers Croatia does not currently offer specific tax abatements or financial incentives for data center development or operations. The primary financial advantage stems from competitive operational costs rather than direct government tax relief.
Natural Disaster Risk
Vukovar has a low overall risk profile for natural disasters, with an INFORM Risk score of 2.5 out of 10 as of September 2025. The primary environmental threats to infrastructure are specific and manageable. Key risks include River Flooding, given the city's location on the Danube River, followed by moderate Earthquake (seismic) activity and occasional Drought.