Data Centers in Tocancipa
2 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Colombia
Tocancipa – Strategic Proximity for Resilient Latin American Operations
Executive Summary
Tocancipa serves as a mission-critical expansion site for enterprises requiring proximity to the Bogota capital region without the logistical friction of urban deployments. It offers a purpose-built blend of high-tier infrastructure and a power grid dominated by renewable energy, making it a sturdy cornerstone for resilient digital operations in South America. This market is a strong choice for organizations prioritizing physical security and sustainable growth for high-stakes hardware.
Tocancipa: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional links with consistent uptime history. |
| Direct Cloud On-Ramps | 0 – as of January 2026 | Bogota serves as the nearest hub for direct access. |
| Power Cost | $0.13 – $0.15/kWh, as of January 2026 | Conservative industrial range for the Sabana Centro region. |
| Disaster Risk | High (5.3/10), as of January 2026 | Significant seismic activity requires resilient structural builds. |
| Tax Incentives | Yes | Law 1715 provides long-term exemptions for renewable energy. |
| Sales Tax | 19% VAT, as of January 2026 | Standard national rate for industrial services. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 10 as of January 2026. The market features major regional providers and national incumbents, ensuring competitive cross-connect options and redundant pathing for enterprise tenants.
Direct Cloud On-Ramps: 0, enabling access to 0 cloud regions as of January 2026. Direct cloud connectivity is typically serviced via private extensions or fiber runs to the primary exchange points in Bogota.
Internet Exchange Points (IXPs): Most local traffic peering occurs via NAP Colombia in Bogota, ensuring efficient regional routing for local and international traffic.
Bare Metal: General availability is provided through regional infrastructure specialists such as Latitude.sh as of January 2026.
Power Analysis
Average Cost Of Power: Based on regional industrial pricing, costs range between $0.13 – $0.15/kWh as of January 2026. The grid is heavily supported by renewable sources, with hydropower accounting for approximately 72% of the mix, providing a favorable carbon footprint for sustainability-focused organizations.
Power Grid Reliability: The Sabana Centro corridor is supported by an industrial-grade grid featuring multi-substation support. Reliability is consistent with high-growth manufacturing zones, providing the steady feed required for mission-critical hardware.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers here sit minutes from the northern edge of Bogota. This proximity allows for sub-millisecond latency to the capital financial district while avoiding the physical security and logistical hurdles of city-center deployments.
Regional Market Reach: Tocancipa is a gateway for serving the 50 million residents of Colombia and the broader Andean community, acting as a central node for northern South American traffic.
Tax Advantage For Data Centers: Renewable energy projects benefit from significant 30-year tax exemptions. This regulatory environment directly reduces the total cost of ownership for modern, green-certified facilities.
Natural Disaster Risk
Tocancipa maintains an overall risk profile of High (5.3/10) as of January 2026. While the location is protected from coastal threats, the following natural hazards are the most significant for local infrastructure:
- Earthquake (8.9): The primary concern for structural integrity; facilities are built to stringent seismic standards.
- River Flood (7.0): Site selection in elevated industrial parks mitigates this regional risk.
- Tropical Cyclone (4.0): Occasional atmospheric disturbances can impact regional power distribution.
- Drought (2.8): Minimal impact on data center operations but affects national hydropower levels.
Other hazards are considered minor for this inland location as of January 2026.