Data Centers in San Pedro de la Paz
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Chile
San Pedro de la Paz – Resilient Edge for Southern Chile
Executive Summary
This market serves as the primary resilient edge for enterprises requiring infrastructure near Chile’s southern industrial corridor. It provides essential disaster recovery and low-latency processing for heavy industry and logistics outside the primary Santiago seismic zone. Organizations secure their digital operations against regional disruptions while maintaining direct access to the Biobío manufacturing heartland.
San Pedro de la Paz: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional performance with backhaul to Santiago. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest on-ramps are located in Santiago. |
| Power Cost | $0.14–$0.18/kWh, as of September 2025 | Competitive pricing with high renewable energy content. |
| Disaster Risk | Low (3.2/10), as of September 2025 | Seismic activity requires strict engineering standards. |
| Tax Incentives | No – as of September 2025 | No dedicated financial breaks for data facilities. |
| Sales Tax | 19% VAT, as of September 2025 | Standard Chilean national value-added tax rate. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 5, as of September 2025. Local facilities provide carrier-neutral environments. This allows access to major Chilean telecommunications providers for regional distribution and ensures competitive transport pricing to national hubs.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions, as of September 2025. No direct public cloud on-ramps currently sit in this market. Connectivity to AWS or Microsoft Azure typically requires a private network interconnect for transit to Santiago.
Internet Exchange Points (IXPs): Regional traffic usually routes through national exchanges like PIT Chile in the capital. Local peering is handled privately to ensure low-latency performance for industrial users in the Biobío Region.
Bare Metal: High-performance dedicated hardware is available through providers such as Latitude.sh and Hivelocity, as of September 2025. These options serve workloads that demand high IOPS and hardware control for industrial automation.
Power Analysis
Average Cost Of Power: Industrial electricity prices range from $0.14/kWh to $0.18/kWh, as of September 2025. This pricing supports predictable operational costs while benefiting from a national grid that is approximately 70% renewable.
Power Grid Reliability: The local grid is supported by infrastructure serving the Biobío industrial corridor. It provides the multi-substation redundancy required for reliable uptime in professional data center corridors.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Facilities are centrally located near Concepción, the engine of the forestry, manufacturing, and logistics sectors of Chile. This proximity ensures the low-latency response times needed for real-time data processing.
Regional Market Reach: This market acts as the primary digital hub for Southern Chile. It effectively serves a significant population base that requires local content delivery and edge computing resources.
Tax Advantage For Data Centers: The general economic stability of Chile provides a reliable framework for long-term infrastructure investment. Organizations benefit from a predictable fiscal environment without the burden of specialized local surcharges.
Natural Disaster Risk
San Pedro de la Paz carries a Low (3.2/10) risk score, as of September 2025. Regional geography requires strict adherence to high-tier seismic building standards to ensure operational continuity.
- Earthquake: 9.6. Seismic activity is a constant factor in regional planning, requiring purpose-built dampening systems.
- Tsunami: 8.6. As a coastal industrial area, maritime risk is a primary consideration for site selection and elevation.
- River Flood: 5.5. Proximity to the Biobío River introduces seasonal risks managed through specialized site drainage.
- Epidemic: 3.3. Public health risks are low and managed through reliable national protocols.